Progress Report on APMP. M

Slides:



Advertisements
Similar presentations
Line Efficiency     Percentage Month Today’s Date
Advertisements

Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
1 THE PARTICIPATION IN THE CIPM MRA OF VMI Country Report of Vietnam at 14th meeting of APMP developing economies committee (DEC) Xi'an-China. 10th June.
1 Key Comparison CCM.FF-K6b Comparison of the Primary (National) Standards of Low Pressure Gas Flow WGFF meeting, June, 19, 2012, Colorado Springs, USA.
APMP/TCFF meeting December 5 - 6, 2011 Kobe, Japan.
APMP TCFF Workshop Nov. 22, Investigation on calibration of fuel ethanol flow meters Takashi Shimada, Ryouji Doihara, Noriyuki Fuiichi, Yoshiya.
APMP TC Fluid Flow Initiative Project Traceability Scheme Study for LPG Metering Final Report at APMP 2012 TCFF Meeting Chun-Min Su CMS/ITRI, Chinese Taipei.
TCFF meeting Dec. 14th~15th, 2009 KL Convention Center Kuala Lumpur, Malaysia SSID: APMP2009 PSWD: abc123d4e5 Apmpweb.cafe24.com/fms/ TCFFChair.
Progress Report on APMP. M
Jan 2016 Solar Lunar Data.
Introduction of Liquid Flow Standards Section Fluid Flow Division National Metrology Institute of Japan (NMIJ)

Q1 Jan Feb Mar ENTER TEXT HERE Notes
Average Monthly Temperature and Rainfall
<Location> – <Project Name>, Sponsor: <name>
REPORT OF RECENT ACTIVIES
80-Hour SHARP Certification Course Schedule
CMC submission from A to Z

Report from TCFF kyung-Am Park TCFF Chair
2017 Jan Sun Mon Tue Wed Thu Fri Sat

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Status Report of the CCM KCs
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
GOMACTech-04 Technical Program Committee Timeline
Wireless Local Number Portability Timeline - Phase 2
Progress Report of APMP.M.FF-K2b
Step 3 Step 2 Step 1 Put your text here Put your text here
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat
2019 Safety Group 1 – 5 Year Program Timeline Guide
2018 Advantage Program Timeline Guide

Electricity Cost and Use – FY 2016 and FY 2017
Safety Group Program Timeline
2014 Advantage Program Timeline Guide *** Progress Visits ***
Minor Release Drop 3 Timeline
Omnibus IV Contract Overview Elieen Emond Contract Specialist
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

2017 Advantage Program Timeline Guide
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
IT Managed Services Transition Weekly Activity Report: May 28th, 2019
Minor Release Drop 3 Timeline
Safety Group Program Timeline
2012 Safety Group 1 – 5 Year Program Timeline Guide
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline

2013 Safety Group Advantage Program Timeline
Status report of OBD Task Force
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Pilot of revised survey
KPI and KVI Review Approach & Plan
2016 Advantage Program Timeline Guide
Presentation transcript:

Progress Report on APMP. M Progress Report on APMP.M.FF-K2 Hydrocarbon Flow (bilateral comparison) Chun-Min Su CMS/ITRI, Chinese Taipei Nov. 26, 2012, APMP 2012 TCFF Meeting Wellington, New Zealand

Introduction Pilot Laboratory: CMS/ Chinese Taipei Participant laboratory: VMI/ Vietnam Overview of comparison Transfer standard: 4" PD meter (Kral) Test flowrates: (5 to 30) L/s, 11 flow points Original Cardinal point: Re= 76 150 New comparison point: Re= 120 000 Comparison parameter: Strouhal No. (temperature-compensated) Strouhal = K × D3 2018/11/18

Summary of the Comparison CMS tested the TS with solvent oil @ 20 ℃ and 35 ℃ (Comparison point @ 34.9 ℃) VMI tested the TS with kerosene @ 29.0 ℃ to 36.4 ℃ (Comparison point @ 29.3 ℃) NMIJ was invited to perform tests with kerosene and light oil @ 20 ℃ and 35 ℃ Comparison was made without viscosity correction The En value of VMI at Re=120000 is 0.28 Operation condition of CMS is quite different from that in CCM-WGFF key comparison. No linkage to KCRV was provided. Slope of the regression line at 35 ℃ is positive but small, maybe due to measurement error. 2018/11/18

Schedule Progress Organization Date Comparison test CMS, VMI Jun. to Dec., 2009 Viscosity effect test NMIJ Feb. to Mar., 2010 Draft A v.1 CMS Aug. 2010 Progress reported to APMP TCFF Nov. 2010 Draft A v.2 Aug. 2011 Draft A Reviewed by TCFF Chair VMI Sep. 2011 Draft B Nov. 2011 Draft B Submitted to WGFF Chair Dec. 2011 Draft B revision Jan. 2012 Draft approved by and submitted to BIPM Mar. 2012 2018/11/18

Final Report Status: approved for equivalence “Final report on APMP.M.FF-K2 bilateral comparison: Hydrocarbon liquid flow” published 2012 Metrologia, Volume 49, Technical Supplement 07004 Slope of the regression line at 35 ℃ is positive but small, maybe due to measurement error. 2018/11/18

Thank you for your attention! 2018/11/18