Airport Air Quality Study Update South Coast AQMD Solomon Teffera Senior Air Quality Chemist
Sampling Schedule Three Months Duration 11/29/05 - 2/28/2006 Plan To Start Santa Monica Airport Monitoring In April 2006 11/18/2018
Van Nuys Airport Sampling Sites Lead & CO Monitoring (Site 5-7) Complete Sampling Array (Site 1-4) Lead & CO Monitoring (Site 5-7) 11/18/2018
Measurements Made To Date Lead and Hexavalent Chromium PM10 Mass and Carbon PM2.5 Mass & Components Ultrafine Particle Count Volatile Organic Compounds (VOC) Carbonyls 11/18/2018
Van Nuys Sampling To Date 25 Scheduled Days of Sampling > 90 % Sample Capture Laboratory Analysis Is Ongoing 11/18/2018
Van Nuys Airport Monitoring Schedule First Phase Set-up Sites Begin Sampling End Sampling Dec. 2005 Nov. 2005 Feb. 2006 Second Phase Set-up Sites Begin Sampling End Sampling July 2006 Aug. 2006 Oct. 2006 11/18/2018
Santa Monica Airport Monitoring Schedule First Phase Set-up Sites Begin Sampling End Sampling March. 2006 April 2006 June 2006 Second Phase Set-up Sites Begin Sampling End Sampling Nov. 2006 Dec. 2006 Feb. 2007 11/18/2018
Future Plans Continue Monitoring at Both Airports Data Analysis Upon Completion Compare Data With MATES III Results Draft Report to Advisory Committee and U.S. EPA Finalize Report 11/18/2018
Santa Monica Airport Sampling Update February 16, 2006 South Coast AQMD Sumner Wilson Principal Air Quality Instrument Specialist 11/18/2018
Proposed Santa Monica Sites Site Type Location Status 1 Fully Instrumented West Tarmac Site secured 4 Richland Elementary 5 Partially Instrumented Maintenance Facility 6 Walgrove Elementary 7 Marine Park Fully Instrumented sites include: CPC, CO, VOC, 2.5 Speciation Carbonyl, VOC, Lead Partially Instrumented sites include: Lead 11/18/2018
Due to limited space and electrical availability Ernst residence to Site # Site Type Location Status 2 Partially Instrumented East Tarmac Site secured 3 Ernst Residence Proposed Due to limited space and electrical availability Ernst residence to have CPC, and battery powered VOC and Lead samplers. East Tarmac site to have battery powered VOC and lead sampling only. 11/18/2018
Santa Monica Airport Sampling Sites Complete Sampling Array (Site 1,4,7) Lead Monitoring (Site 5,6) 11/18/2018
4 3 2 5 1 6 7 11/18/2018
WEST Tarmac Site #1 11/18/2018
Richland Site #4 11/18/2018
Maintenance Site #5 11/18/2018
Walgrove Elem Site#6 11/18/2018
Marine Park Site#7 11/18/2018
Ernst Residence Site #2 East Tarmac Site #3 11/18/2018
Future Plans Prepare sites, install power and fencing Start Moving Monitoring Equipment From Van Nuys In March Begin Sampling In April 11/18/2018