Smart Grid SC– May 2012 NIST PAP2 activities of interest to 802 Name

Slides:



Advertisements
Similar presentations
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
Advertisements

May SG Communications Overview Matt Gillmore 02/27/2012.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– January 2012 Date: 18 Janaury 2012 Discussion topics during November.
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Doc.: IEEE r1 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission Title: Link Budget for m Date Submitted: 5 March 2012.
Summary of SGIP PAP2 Activities since April 2012 Mingxi Fan, Alex Gogic, Jing Sun TR-45.5 Liaison to SGIP PAP June 11 th,
Doc.: IEEE /1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics.
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
Doc.: IEEE /0174r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /1112r2 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 17 August 2011 Discussions during.
Summary of SGIP PAP Activities since October 2011 Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP April 16 th, 2012.
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
Summary of SGIP PAP Activities since October 2011 Mingxi Fan TR-45.5 Liaison to SGIP PAP December 5 th, 2011 ©2011.
IEEE Submission May 2013 Jon Adams, Lilee SystemsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
Doc.: IEEE /0506r2 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
Submission doc.: IEEE /0156r0 January 2016 Joseph LEVY (InterDigital)Slide 1 IMT-2020 Discussion Review and Straw Polls Date: Authors:
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Summary of SGIP PAP2 Activities Update as of August 2012 Alex Gogic, Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
Smart Grid ad hoc – August 2011
IEEE 802 OmniRAN EC SG July 2013 Conclusion
Month Year doc.: IEEE yy/xxxxr0 November 2017
Evaluation Model for LTE-Advanced
Smart Grid ad hoc Meeting Information - January 2010
Smart Grid ad hoc Meeting Information - January 2010
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Preliminary Proposal for FHSS PHY for k]
IMT-Advanced Opening Report
Smart Grid ad hoc – May – SGIP NIST PAP2 2 - EPRI FAN Name
Wireless Characterization for NIST PAP#2
IMT-Advanced Report Tech Requirements Outline
Smart Grid SC– January – NIST PAP2 Name Company Address Phone
Submission Title: Link Budget for m
Smart Grid ad hoc Closing Report – May 2011
January 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report for Beijing May 2010.
Smart Grid Closing Report – November 2010
Smart Grid Teleconferences – Jan-Mar 2011
<month year> doc.: IEEE < e> January 2012
Wireless Characterization for NIST PAP#2
Smart Grid ad hoc Closing Report - March 2010
ETSI Liaison Requests November 08
April 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report for Montreal, May 2009.
Smart Grid SC–Closing Report- September 2011
Smart Grid ad hoc Closing Report - May 2010
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
doc.: IEEE <doc#>
Smart Grid Update – January 2011
Supplementary Plenary Information - March 2010
Supplementary Plenary Information - May 2010
Smart Grid Technology Discussions 2010
Smart Grid ad hoc Closing Report – January 2011
November 1999 doc.: IEEE /119r0 November 1999
Discussion on IMT-2020 mMTC and URLLC
TGn Meeting Report - June 02 ‘09
Smart Grid Closing Report – November 2010
Smart Grid ad hoc-Closing Report - July 2010
Submission Title: [WG-TG3 Opening Report Jan02]
Plenary Information - September 2009
Current Status of submission about EUHT
<month year> doc.: IEEE < e> January 2012
<month year> doc.: IEEE < e> <May 2011>
Summary of Conference Call – Feb 8
doc.: IEEE yy/xxxxr0 Date: September, 2019
Presentation transcript:

Smart Grid SC– May 2012 NIST PAP2 activities of interest to 802 Name doc.: IEEE 802.11-12/0703r0 May 2012 Smart Grid SC– May 2012 Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA, 95054 +1-321-751-3988 bkraemer@marvell.com Date: 16 May 2012 Discussion topics during May ECSG Session in Atlanta Topic Abstract: NIST PAP2 activities of interest to 802 Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

Agenda High level PAP02 GOALS, Work plan, Schedule, May 2012 Agenda High level PAP02 GOALS, Work plan, Schedule, Discussion of details as appropriate Catalog of Standards Modeling Tool PAP02 Intro Cyber Security Publications and References Bruce Kraemer, Marvell

May 2012 NIST SGIP PAP02 History Bruce Kraemer, Marvell

Major 802 Support Elements in SGIP May 2012 Major 802 Support Elements in SGIP Smart Grid Strategy Program management Document Publication OpenSG Utility Requirements NIST SGIP PAP#2 SDOs Technology Capabilities Bruce Kraemer, Marvell

High Level 802 Goals in the PAP02 Context May 2012 High Level 802 Goals in the PAP02 Context Recognition of IEEE 802 wireless standards in NIST Catalog of Standards Acceptance of wireless standards as viable in Smart Grid deployments Bruce Kraemer, Marvell

Major 802 Engagement Opportunities in SGIP May 2012 Major 802 Engagement Opportunities in SGIP Participate in the PAP02 activity to develop Wireless Guideline 2.0 Prepare and Submit application paperwork for 802 standards to NIST for inclusion in the Catalog of Standards Bruce Kraemer, Marvell

PAP#2 Status Published: Version 1 May 2012 PAP#2 Status Published: Version 1 NISTIR 7761: NIST Priority Action Plan 2 Guidelines for Assessing Wireless Standards for Smart Grid Applications Wireless Capability Matrix Application Communication Requirements Matrix Extended Work: Update of the Guidelines with goal of completing Version 2 by August 2012 http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/PAP02Wireless Slide 7 Bruce Kraemer, Marvell

Guideline Version 1 May 2012 Attribute Standard Information Identifier of the standard NIST IR 7761 Title of the standard Guidelines for Assessing Wireless Standards for Smart Grid Applications Name of owner organization NIST Latest versions, stages, dates 1 URL(s) for the standard http://collaborate.nist.gov/twiki-sggrid/pub/SmartGrid/PAP02Objective3/NIST_PAP2_Guidelines_for_Assessing_Wireless_Standards_for_Smart_Grid_Applications_1.0.pdf http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/SGIPCosSIFNISTIR7761 Bruce Kraemer, Marvell

Guideline Sections Sect 2 Acronyms and Definitions May 2012 Guideline Sections Sect 2 Acronyms and Definitions Sect 3 SG Conceptual Model & Business Requirements Sect 4 Wireless Technology Sect 5 Modeling & Evaluation Approach Sect 6 Factors to Consider Sect 7 Conclusions Sect 8 References Sect 9 Bibliography Annex (e.g. A, B, C, D, E) Bruce Kraemer, Marvell

May 2012 January 2012 Annexes ANNEX A IEEE 802.11 ANNEX B 3GPP LONG TERM EVOLUTION (LTE) ANNEX C 3GPP HIGH SPEED PACKET ACCESS (HSPA) ANNEX D CDMA2000 1X AND HIGH RATE PACKET DATA (HRPD) ANNEX E IEEE 802.16/WIMAX NETWORK Slide 10 Bruce Kraemer, Marvell

Guideline 1 to 2 Differences May 2012 Guideline 1 to 2 Differences Provide a significantly better method for analyzing/comparing the performance of a wireless technology in a representative physical environment with a specified data load scenario Utilize realistic data loading (developed by OpenSG) Correct definitions contained in Section 4 Significantly extend the technology modeling (SDO sub com) in Section 5 Bruce Kraemer, Marvell

May 2012 UCAIUG •The UCA® International Users Group is a not-for-profit corporation consisting of utility user and supplier companies that is dedicated to promoting the integration and interoperability of electric/gas/water utility systems through the use of international standards-based technology. It is a User Group for IEC 61850, the Common Information Model – Generic Interface Definition (CIM/GID as per IEC 61970/61968), advanced metering and demand response via OpenDR. Our Mission: To enable utility integration through the deployment of open standards by providing a forum in which the various stakeholders in the utility industry can work cooperatively together as members of a common organization to: Influence, select, and/or endorse open and public standards appropriate to the utility market based upon the needs of the membership. Specify, develop and/or accredit product/system-testing programs that facilitate the field interoperability of products and systems based upon these standards. Implement educational and promotional activities that increase awareness and deployment of these standards in the utility industry. Bruce Kraemer, Marvell

Open SG Utility Data Flow information May 2012 Open SG Utility Data Flow information Latest data descriptions Actors Flows Data size Security levels http://osgug.ucaiug.org/UtiliComm/Shared%20Documents/SG-NET%20PAP%20work-in-progress/Database-wip/database/SGNet-2010mod29Aug2011-5.1.zip Bruce Kraemer, Marvell

SDO Sub group SDO Sub-group May 2012 SDO Sub group SDO Sub-group Purpose: Sub-group open to anyone with technical knowledge interested in contributing to clarifying SDO terms and generating estimates for covered equipment When: Occurs every Monday effective 8/8/2011 from 9:00 AM to 10:30 AM (UTC-08:00) Pacific Time (US & Canada). Conference Bridge: +1-858-658-1111 Conference ID: 3827472 Passcode: 0681 Bruce Kraemer, Marvell

Guideline Sections Sect 2 Acronyms and Definitions May 2012 Guideline Sections Sect 2 Acronyms and Definitions Sect 3 SG Conceptual Model & Business Requirements Sect 4 Wireless Technology Sect 5 Modeling & Evaluation Approach Sect 6 Factors to Consider Sect 7 Conclusions Sect 8 References Sect 9 Bibliography Annex (e.g. A, B, C, D, E) Re-write focus Bruce Kraemer, Marvell

May 2012 January 2012 Annexes ANNEX A IEEE 802.11 ANNEX B 3GPP LONG TERM EVOLUTION (LTE) ANNEX C 3GPP HIGH SPEED PACKET ACCESS (HSPA) ANNEX D CDMA2000 1X AND HIGH RATE PACKET DATA (HRPD) ANNEX E IEEE 802.16/WIMAX NETWORK Slide 16 Bruce Kraemer, Marvell

May 2012 NIST SGIP PAP02 Update Bruce Kraemer, Marvell

PAP02 Guideline – January Schedule Overview May 2012 PAP02 Guideline – January Schedule Overview Wireless Guideline 1 published – Jan 13, 2011 Finalize wireless model – Oct 7, 2011 Revise Sections 2,3,4,5,6,7,8,9,Annex - March 16, 2012 Collect all details on modeling scenarios – Nov 4, 2011 Exercise, refine, output model results – Feb 3, 2012 PAP02 vote on Guideline 2 Submit Guideline 2 to CoS process – April 16, 2012 Wireless Guideline 2 published – Aug 10, 2012 Bruce Kraemer, Marvell

PAP02 Guideline – March Schedule Overview May 2012 PAP02 Guideline – March Schedule Overview Wireless Guideline 1 published – Jan 13, 2011 Revise Sections 2,3,4,5,6,7,8,9,Annex Model Assessment Tool ready for use– April 13, 2012 Exercise, refine, output model results – May-June, 2012 Draft ready for Group review – August 24, 2012 PAP02 vote on Guideline 2 – October 5, 2012 Submit Guideline 2 to CoS process – October 8, 2012 Wireless Guideline 2 published – February 22, 2013 Bruce Kraemer, Marvell

May 2012 OpenSG Status SG Network TF is please to announce the release of SG Requirements Release 5.1 documentation set that contains the Smart Grid Application Requirements and especially the architectural non-functional telecomm communication network requirements. This version is an incremental release of the content as measured against the 5.0 release 23Aug2011 and contains: 19 payload-groupings (use cases) 204 payloads (asymmetric messages 500 payload-parent-sets 7854 requirement rows (parent and child) payload tab that contains payload: description, attributes, security LICs, security C-I-A risk levels, business rationale for the C-I-A risk values The release 5.1 documentation set of files are listed in the following pdf. This document also identifies where the SG Communications - SG Network TF Shared Documents website the various files are located along with high level description of the file contents. Alternately, use the embedded link to the SG Communications SG Network TF "Latest_Release_Deliverables" folder If you have any questions, please contact Matt Gillmore or Ron Cunningham respectfully Ron Cunningham SG Network TF vice-chair 918-599-2622 Bruce Kraemer, Marvell

Work in Progress: Chapter 4: Chapter 5: Range Estimator: Chapter 6: May 2012 January 2012 Work in Progress: Chapter 4: Chapter 5: Range Estimator: Chapter 6: Slide 21 Bruce Kraemer, Marvell

May 2012 Range Estimator Bruce Kraemer, Marvell

May 2012 UCAIUG •The UCA® International Users Group is a not-for-profit corporation consisting of utility user and supplier companies that is dedicated to promoting the integration and interoperability of electric/gas/water utility systems through the use of international standards-based technology. It is a User Group for IEC 61850, the Common Information Model – Generic Interface Definition (CIM/GID as per IEC 61970/61968), advanced metering and demand response via OpenDR. Our Mission: To enable utility integration through the deployment of open standards by providing a forum in which the various stakeholders in the utility industry can work cooperatively together as members of a common organization to: Influence, select, and/or endorse open and public standards appropriate to the utility market based upon the needs of the membership. Specify, develop and/or accredit product/system-testing programs that facilitate the field interoperability of products and systems based upon these standards. Implement educational and promotional activities that increase awareness and deployment of these standards in the utility industry. Bruce Kraemer, Marvell

Open SG Utility Data Flow information May 2012 Open SG Utility Data Flow information Latest data descriptions Actors Flows Data size Security levels http://osgug.ucaiug.org/UtiliComm/Shared%20Documents/SG-NET%20PAP%20work-in-progress/Database-wip/database/SGNet-2010mod29Aug2011-5.1.zip Bruce Kraemer, Marvell

802 Smart Grid Teleconference Plans May 2012 802 Smart Grid Teleconference Plans Calls have been scheduled at 2pm ET on Wednesdays Call topics between March and May meetings ?? Call Dates to schedule?? Mar 21 Mar 28 Apr 04 Apr 11 Apr 18 Apr 25 May 02 Bruce Kraemer, Marvell

802 Smart Grid Teleconference Plans May 2012 802 Smart Grid Teleconference Plans Calls have been scheduled at 2pm ET on Wednesdays Agreed on one call between January and March meetings Feb 08 – Telecon to discuss recommended parameters from 11ah and 15.4g to use in the propagation model Bruce Kraemer, Marvell

Range Estimator Variables - Example Supplied May 2012 Range Estimator Variables - Example Supplied Frequency in MHz 2000 BS Antenna Gain dBi 15.0 Tx Amplifier Power per Antenna Element (watts) 10.0 Number of Base Station Tx Antennas 1 Number of Base Station Rx Antennas Base Station Rx Noise Figure dB 4.0 Terminal Type (Actor)   Fixed Outdoor Mounted Terminal Fixed Indoor Self-Installed Terminal Vehicular Installed Mobile Terminal Feeder Line Device Wireless-Enabled Smart Meter Mobile Handheld Device Terminal (SS) Antennna Gain dBi 12.0 5.0 7.0 0.0 -1.0 Tx Amplifier Power per Antenna Element (watts) 0.5 0.2 2.0 0.1 Number of Terminal/(SS) Tx Antennnas 1 Number of Terminal/(SS) Rx Antennnas Terminal (SS) Rx Noise Figure dB 6.0 DL Channel OH Factor 29.3% Bruce Kraemer, Marvell

Range Estimator Variables – 802.15 & 802.11 update May 2012 Range Estimator Variables – 802.15 & 802.11 update 802.11ah 917.5 802.15.4g 917.5 Frequency in MHz 2000 BS Antenna Gain dBi 15.0 Tx Amplifier Power per Antenna Element (watts) 10.0 Number of Base Station Tx Antennas 1 Number of Base Station Rx Antennas Base Station Rx Noise Figure dB 4.0 Work not yet completed Complete on conf call Terminal Type (Actor)   Fixed Outdoor Mounted Terminal Fixed Indoor Self-Installed Terminal Vehicular Installed Mobile Terminal Feeder Line Device Wireless-Enabled Smart Meter Mobile Handheld Device Terminal (SS) Antennna Gain dBi 12.0 5.0 7.0 0.0 -1.0 Tx Amplifier Power per Antenna Element (watts) 0.5 0.2 2.0 0.1 Number of Terminal/(SS) Tx Antennnas 1 Number of Terminal/(SS) Rx Antennnas Terminal (SS) Rx Noise Figure dB 6.0 DL Channel OH Factor 29.3% Bruce Kraemer, Marvell

Choose values Choose values representative of 802.11ah May 2012 Choose values Choose values representative of 802.11ah Values will be contributed to NIST/PAP2 during the summer Values will be published as part of Guideline version 2 in the fall Bruce Kraemer, Marvell

Choose values Good- Established SDO sub committee May 2012 Choose values Good- Established SDO sub committee Group meets for 1.5 hours every Monday Very significant progress has been made in advancing the Guideline Significantly rewrote Sections 4,5,6 Generated Range Estimator Problematic: The SDO subcommittee is now driven by cellular knowledgeable members Bruce Kraemer, Marvell

RANge Estimator OPTIONS May 2012 RANge Estimator OPTIONS Too much work – not enough time Rewrite Range Estimator Modify input form for WLAN Supply representative data Do nothing Impairs visibility/credibility of 802 Bruce Kraemer, Marvell

May 2012 Bruce Kraemer, Marvell

Range Estimator - Environments May 2012 Range Estimator - Environments Density Area Category House-Units2 per sq-mi House-unit cluster area3 (sq-mi) % of Population % of House-Units % of "Land" Area dense urban0,4 ≥ 4,000 4 places, median 1.00, 0.02 - 303 11.0% 11.5% 0.05% urban0,5 ≥1000 - <4000 74 places median 2.12, 0.01 - 579 34.7% 34.3% 0.6% suburban0,6 ≥100 - <1000 355 places, median 1.47, 0.02 - 757 30.7% 29.8% 3.2% rural7 ≥10 - <100 60 places, median 3.12, 0.04 - 400 17.0% 17.6% 22.7% low density rural7 < 10 9 places, median 21.04, 0.13 - 2,874 4.2% 4.7% 72.3% Model Area Totals (count or sq-mi) 5,703,000 2,346,000 71,000 Bruce Kraemer, Marvell

Variables – 802.15 & 802.11 Technology May 2012 doc.: IEEE 802.11-12/0703r0 May 2012 Range Estimator 3.0 Variables – 802.15 & 802.11 Technology Frequency in MHz 2000 BS Antenna Gain dBi 15.0 Tx Amplifier Power per Antenna Element (watts) 10.0 Number of Base Station Tx Antennas 1 Number of Base Station Rx Antennas Base Station Rx Noise Figure dB 4.0 Terminal Type (Actor)   Fixed Outdoor Mounted Terminal Fixed Indoor Self-Installed Terminal Vehicular Installed Mobile Terminal Feeder Line Device Wireless-Enabled Smart Meter Mobile Handheld Device Terminal (SS) Antennna Gain dBi 12.0 5.0 7.0 0.0 -1.0 0.5 0.2 2.0 0.1 Number of Terminal/(SS) Tx Antennnas Number of Terminal/(SS) Rx Antennnas Terminal (SS) Rx Noise Figure dB 6.0 DL Chan OH Factor (Other PHY + Typically Layer 2: Data Link/MAC) 29.3% Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

Range Estimator – Deployment Conditions May 2012 Range Estimator – Deployment Conditions Denotes values transferred from Sheet A Terminal type that best fits Smart Grid "Use Case" being analyzed (If multiple types, best to choose "worse case") Wireless-Enabled Smart Meter Spectrum is "Dedicated" or "Shared" Dedicated Duplexing Method is TDD Operating Frequency Band = 2000 Req Cell Edge UL Channel Goodput = 0.050 Req Cell Edge DL Channel Goodput = 0.100 Required UL Cell Edge SNR = 0.0 (Lowest of DL/UL/Control) System Gain = 142.0 Effective UL Channel BW = 6.00 Channel OH for Encryption = 10.0% Additional, higher layer Channel OH = Total Channel OH = 50.9% Frequency Re-Use Factor = 1 Base Station Antenna Height = 200 Terminal (Actor) Antenna Height = 2 Terminal (Actor) Location is Outdoor Required Cell Edge Availability = 93.0% Capacity-Limited Traffic Direction is UL Land Area of region to be covered = 5.0 Required incremental7 Data Density for SG Network in MB/unit area = 0.307 Required incremental7 Data Density for SG Network in Mbps/unit area = 2.46 Average UL Spectrum Used = 5.00 DL Link Budget minus UL Link Budget = 12.0 Ratio of DL/UL Data Density Req = 1.00 Bruce Kraemer, Marvell

Range Estimator – Output Example May 2012 Range Estimator – Output Example Path Loss Model Erceg-SUI-Modified Hata-Okumura Cost231-Hata WINNER II ITU-R M.2135-14   Deployment Region Type A Suburban Units Link Budget = 126.1 dB Range projection = n/a 1.10 1.08 2.95 km Cell Coverage Area at Maximum Range1 = 3.15 3.01 22.58 sq-km Cell SE Density at Maximum Range2 = 0.393 0.413 0.065 bps/Hz/sq-km Avg Cell Data Density at Maximum Range = 3.47 3.65 0.57 Data Goodput per Cell/BS at Maximum Range3 = 10.96 12.90 Mbps Required Cell SE Density = 0.11 Range for Required UL Data Density = 2.57 Coverage Area per Cell at Required BS-to-BS Spacing = 17.16 Data Goodput/Sector at Required BS-to-BS Spacing = 5.42 Mbps/Sector Required BS-to-BS Spacing5 in miles or kilometers = 1.19 1.16 2.77 mi Minimum number of BS for ubiquitous coverage6 = 5 1 Base Stations Goodput/BS at Required BS-to-BS Spacing (Mbps) = 11.0 16.3 Mbps/BS Net Cell Spectral Efficiency (bps/Hz) = 2.19 3.25 bps/Hz/cell Total # of Terminals (Actors) per Sector or Channel = 141 703 Approximate # of Terminals(Actors) per Sector or Channel based on Latency Requirement8 = #N/A 23318 34623 Bruce Kraemer, Marvell