Barbara Holzer, Jorg Wenninger

Slides:



Advertisements
Similar presentations
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Advertisements

LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Machine Coordinators: G. Arduini, J. Wenninger
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Saturday 30th June - Sunday: Rocky !
Week 32 Started with luminosity production…
Summary of ion week 48 Last beam OP summary of 2010 Week 48
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Coordination: Gianluigi Arduini & Jan Uythoven
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Bernhard Holzer, Joerg Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Coordination by E. B. Holzer & J. Wenninger Production
Mike Lamont, Jorg Wenninger
Week 35 – Technical Stop and Restart
Summary week 29 VdM scans Luminosity production
Chromaticity can make a difference…
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Programme for Saturday 10 July
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Summary week 18 Intensity ramp up & production
Saturday 3rd November - morning
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Saturday :42 stable beams fill 3541
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Thursday 2.12 Cryo recovery…. Access… RF cavity check (noise) Cav4B1.
Saturday 10:00: Cryo Pt8 back, starting the pre-cycle.
Saturday 26 November 2011.
Tuesday
Monday 152 bunch operation summary
Presentation transcript:

Barbara Holzer, Jorg Wenninger Summary week 45 Barbara Holzer, Jorg Wenninger

P8 Cryogenics, timing Friday 09Nov’12 10h38: Cold compressors stop, “fault” of magnetic bearings for CC2 11h15: Access in cavern and simple reset 12h: 1st restart of cold compressors 13h08: 2nd CC2 bearings fault, decision to replace electronic module for magnetic bearings 15h15: 2nd restart of cold compressors 19h30: Full flow dedicated to sector cooling Sat. 10Nov’12 10h: Cryo conditions back Repair: 4h45 - Prepare for cooling: 4h15 - Cooling: 14h30 Cryo down-time: 23h30

Stable situation, could continue like this until Xmas Last week, we had to make a quick warm-up of the other cold compressor box (minor air impurities), available again Saturday 10Nov’12… CC2 Magnetic bearings Stable situation, could continue like this until Xmas If short stop of cold compressors only, 1 quick restart allowed (≈18hrs) If stop of cold compressors >3hrs or complete cryo stop, separation back to 1 refrigerator on 1 sector to be made (≈18hrs the first time, faster if a 2nd case) All HW ready? Friday afternoon?

Saturday 10:00: Cryo Pt8 back, starting the pre-cycle. 11:00 LHC ready, but SPS dump kicker problem – switch exchange + reconditioning. 15:00 Injecting ! Phase and bucket off. Corrected. LBDS arming issues (self trigger). Checked by experts but not understood. We manage to carry on. 16:00 Pt8 compensator off. 17:00 We decide to carry since we can live without. 18:00 POPS off. 19:30 Filling again. Problem with losses at injection. B1 dumped with 144b. 20:30 SPS off – major flood in BA2 (surface + tunnel). 11/18/2018 LHC 8:30 meeting

SPS BA2 Water from nearby fields passed through SPS HV cable trenches to enter building… 11/18/2018 LHC 8:30 meeting

SPS BA2 11/18/2018 LHC 8:30 meeting

SPS BA2 - tunnel Fortunately the water height was limited – no damage to vacuum equipment and damper electronics. 11/18/2018 LHC 8:30 meeting

Saturday - Sunday On the LHC side limited ‘problems’ – galleries and CV buldings under water in Pt8. Overnight : pumping of the water by FB and by the normal pumps. Situation improving. Sunday morning: BA2 tunnel area ~dry. SPS trying to restart. 11:00 LHC beam back in the SPS. 12:00 LHC closed, pre-cycle. 13:30 Beam back !!! Transfer line steering…. LHC wire scanner not working – application blocked. Related to B1 FBCT intensity issue (phase) ? 11/18/2018 LHC 8:30 meeting

Sunday 17:00 First fill lost during ADJUST – trip of RF line 4B1. Dump by LHCb during refilling – signature of capture losses / ghost bunches. Again large synchro errors ~ 50 deg. Orbit offset to lower synchro error. To gain some extra margin, we set back the target for batch-by-batch blowup to 1.1 ns (from 1.4 ns). TDI-TCLIs – not OK ! Line - OK 11/18/2018 LHC 8:30 meeting

Sunday Refill and… 20:50 Stable beams fill 3279, L ~ 7e33 cm-2s-1. After ~58 hours without beam. LHCb high at start (~250), separate more for next fill. 04:50 Beam dump, again RF line 4B1, same fault. Access for RF power. 07:00 Refill. Steering lines. FBCT phasing/calibration. 11/18/2018 LHC 8:30 meeting

Week overview ALICE LHCb polarity RF B1 Injector TS Recovery TS & MD RB S67 SPS MKDV & flooding Cryo Pt8 11/18/2018 LHC 8:30 meeting

Fills of the week Integrated ~730 pb-1, 54h ~32% Fill Day L (h) Int L (pb-1) Dump 3265 Mo 13:40 183 (~30) TOTEM BLM – EoF study 3266 16:10 198 QPS on Q9.L2 3269 We 12:30 188 OP 3272 Th 3:30 66 COD trip 3273 Fr 8:00 126 OP – preventive dump / cryo Pt8 3279 Su 7:45 120 RF line 4B1 Integrated ~730 pb-1, 54h ~32% 11/18/2018 LHC 8:30 meeting

Downtime Cryo Pt 8 ~24 hours. ‘Recovery’ after injector TS & MD ~ 16 hours. Many mixed issues… SPS flooding ~16 hours. Injection line steering 6+ hours. SPS dump kicker ~4 hours. ALICE ~4 hours. 11/18/2018 LHC 8:30 meeting

Passed the 20 fb-1 mark last Wednesday. ALTAS @ 20.4 fb-1 Overall status Passed the 20 fb-1 mark last Wednesday. ALTAS @ 20.4 fb-1 LHCb close to 2 fb-1. 11/18/2018 LHC 8:30 meeting

Transfer lines and injection Almost systematic TL steering before injection (1/day). MSE stability, plus orbit in SPS. Relative importance of the 2 components to be clarified. Fluctuating losses, unclear origin. Sometimes losses in the lines (collimators), sometimes from un-captured beam in LHC and/or ghosts in SPS. Sunday evening: dump by LHCb. Ghost bunches with large emittance? SPS is observing significant tails at injection. 11/18/2018 LHC 8:30 meeting

Steering at injection 11/18/2018 LHC 8:30 meeting

Injection continued Thursday: energy matching with horizontal CODs in LHC (~0.02% each beam) to reduce the RF synchro errors. Improved losses on LHC side, also at ramp start (IR3). But then we observed again rather large synchro errors on Sunday ~ 30-50 deg. Circumference moving (on top of tides) or magnetic fields ? Not tides – they have no effect if the beam is well centered because the SPS sees the same change. Batch-by-batch blowup: Was re-activated on Thursday with a target of 1.4 ns, after energy matching. Was re-deactivated on Sunday (target back to 1.1 ns) to gain some margin at injection. 11/18/2018 LHC 8:30 meeting

Central fRF – E-matching RF frequency to center the beam radially in the BPMs. Reference point at flat top, corrected for tides. Relatively large change during WE, but seems still a bit small to explain all the RF synchro / E-matching effects. ~ 2mm 11/18/2018 LHC 8:30 meeting

Injection todo’s Injection steering - causes, Energy matching, Ghosts ?, Batch-by-batch blowup. 11/18/2018 LHC 8:30 meeting

TOTEM Once more beam dump during EoF study. TCL’s opened to > 60s. Unusual loss behavior on B1 – due to beam leaking out of IR3? Dumped on increasing loss rate (over few seconds), RP XRPH.A6R5.B1 @ 32s, not moving. Traced to a large increase in the vacuum pressure ! Heating by beam or impedance, e-clouds ? 11/18/2018 LHC 8:30 meeting

LHCb polarity switch LHCb polarity switched without test cycle – no problem. Settings sufficiently reproducible, Very small shifts whenever polarity changed. 2-step collision BP, Global V orbit correction, Separation adjustment Lumi knob trims Beam1 H V 11/18/2018 LHC 8:30 meeting

Miscellaneous TCLs were opened in fill 3272 at start of stable beams to measure cryo load due to losses. Tune split at end of squeeze -3e-3 on B1V. Prepared the same trim starting earlier in squeeze (from 600 s / 1 m) – coming in for next fill. BPMs acquisition problems (again). Many packets missing. FBCT calibration/phasing (in particular B1) to be done! LHC wire scanner application blocking to be investigated. Correlated to FBCT B1? 11/18/2018 LHC 8:30 meeting

Pending ‘tests’ VdM scans – to be confirmed. If YES – need pre-warning (1+ day) to check / finalize settings. Availability of collimator people this week? HL-LHC meeting… TOTEM end of fill test at > 40s with beams re-separated (1-2 hours). Tune splits at end of squeeze (sort of parasitic). Next step prepared. Heating with short bunches at 450 GeV (B. Salvant et al). Followed by tests at 4 TeV. Periodic loss maps. Gated Q measurement for B2. Possibly increase of ADT gain at start of ramp. 6 non-colliding bunches then ~ un-damped by ADT !! Tuning of ADT for injection/abort gap cleaning. Requires thorough checking if to be used in operation. Test only? 11/18/2018 LHC 8:30 meeting

Pending access requests / intervention Compensator + filters in Pt8 – off for the moment. PM32 : CV to check / remove sand. 11/18/2018 LHC 8:30 meeting