FIRST SDM JOINT COORDINATION WORKSHOP

Slides:



Advertisements
Similar presentations
PoA Challenges & Opportunities
Advertisements

UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
A Project Developers view on lessons learned and challenges with PoAs (module 2.2) 24 March 2012 Mischa Classen Executive Committee, Project Developer.
PoA AFTER Cancun - READY TO TAKE OFF NOW
Validation and verification report templates
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
UNFCCC secretariat, SDM Olof Bystrom, Programme Officer Module 1.4 JI Project Cycle - Status of Implementation 1st SDM Joint Coordination Workshop Bonn,
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
Bosna i Hercegovina Босна и Херцеговина Bosnia and Herzegovina Agencija za javne nabavke/nabave Агенција за јавне набавке Public Procurement Agency e-Procurement.
Commercial Data Processing Lesson 3: Data Validation.
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
Supplementary Training Modules on Good Manufacturing Practice
Validation & Verification Report Templates – RIT Perspective Vinay Deodhar, RIT, AP Member Module March 2012 First SDM JCW, Bonn, Germany.
An agency of the European Union Get started with EudraCT to prepare and post results Noémie Manent Compliance and Inspection.
Method for verifying a credit card number: Example:
Validation of Participants
Preparation and processing of in-session documents.
· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
Module 1.2 – CDM Project Cycle Calibration Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs) A. Ricardo J. Esparta.
Payment claim administration in Lithuania Conference and Open Discussion about Effective management of EU structural funds 1-2 of February, 2012 A. Stalerunaite,
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Validation and Verification of CDM projects SGS Climate Change Programme Shivananda Shetty Business Manager – SGS India Syed Khursheed Zaidi Operation.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
KfW Carbon Fund From PoA to NAMA Barcelona 31th of May 2011.
IT platform development of the FNRBA website IAEA Headquarters, Vienna, Austria 25–26 February 2013 M. Youssif Safety and Security Section Department of.
How to Guide: Performance Feedbacks Learn how to complete, upload and publish Performance Feedback forms.
The LIFE Programme: the EU funding tool for the Environment and Climate Action Lorenzina Bruno, Senior Financial Officer EASME – C.1.6 LIFE NGO Kick-off.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache National Meteorological Administration of Romania.
DIVISIBILITY RULES. A number is divisible by: If the number ends in 0 the number is also divisible by 2 and 3 the sum of the number's digits.
Validation of Forest-based Carbon Projects
AIS AIM SG Ad-hoc Chapters 5-6 Group
TIM 58 Chapter 3: Requirements Determination
Regulated Professions Database
Robert Tomas INSPIRE Thematic clusters coordinator MIWP Action
Baseline setting and monitoring under JI compared to the CDM approach
دانشگاه شهیدرجایی تهران
Chemistry Education for Sustainable Development
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
تعهدات مشتری در کنوانسیون بیع بین المللی
SUMITOMO CHEMICAL ASIA PTE LTD
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Mandate of Department of International Cooperation and European Integration of MONSTAT MGSC March 2014.
New Guides on social security where are we now?
EVAL Practical Introduction May 2018
Jean-Marie Bolis Eurostat unit B1 3 May 2018
Bathing Water Quality Reporting “Bathing Water” tool
Method for verifying a credit card number:
Evaluating Progress Towards Achieving Targets Identified in the Communication on Halting the Loss of Biodiversity to 2010 and Beyond Member State Contribution.
TITLE OF THE PRESENTATION
Informal document GRPE-79-19
Project Management Techniques Project Management Life Cycle
Please list the titles of each chapter in the module. Most modules include an Introduction chapter and a Summary chapter.
Enhanced Interaction and Direct Communication
Multiplication Workshop
Education and Training Statistics Working Group June 2014
Land Acquisition. BORUTHO NZELELE 1X400 kV Transmission Line Servitude Acquisition Process By Phuti Makweya.
Presented by: Don Green
Kick-Off meeting SMATH Project
Presentation transcript:

FIRST SDM JOINT COORDINATION WORKSHOP 24/03/2012 – 25/03/2012 Module 3.4 - Validation and Verification Report Templates

Agenda Validation / Verification Report templates Digitization Process suggestions Abteilung: 18.11.2018

V / V Report templates Main content Following the VVS chapters Special chapters for SSC, PoA, A/R Define statements When only an statement is request by VVS Basic information in cover page No double information e.g. this report, the PDD, the methodology/ies No inclusion of means of validation / verification Abteilung: 18.11.2018

Agenda Validation / Verification Report templates Digitization Process suggestions Abteilung: 18.11.2018

Digitization PDD divided in chapters GSC before contract with DOEs? Time efficient Tender character Changes of posted PDD Only possible if DOE request (CAR, CL) Chapter specific Automatic versioning Abteilung: 18.11.2018

Agenda Validation / Verification Report templates Digitization Process possible improvements Abteilung: 18.11.2018

Process PPs could direct upload the PDD MoC might be use since the beginning Upload process Inclusion of CPA might be done directly by PPs Digital upload To be verified (according to monitoring plan) Changes on PDD after registration Might be requested by PPs at any time PPs upload new documentation If required DOE validate this, else will be included in the verification report Abteilung: 18.11.2018

General issues Test face of the system with involvement of PPs and DOEs Workshop Webex or similar Use available experience in digitization German EU-ETS Abteilung: 18.11.2018

Thank you for your attention! Javier Castro Javier.Castro@tuev-sued.de Abteilung: 18.11.2018