Project Review. Current State Currently on track to meet our mission objectives and cover all customer needs – Unpredictable to know whether or not sensors.
© Nintendo Game Document Game Development - Spring
Inventory Flowchart Page 4 Cynthia Truong Annie Tang Yan Yan May Liu Mercy Muitah.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
CS 1400 Using Microsoft Visual Studio 2005 if you don’t have the appropriate appendix.
Travel Website Enhancement Project Project Update First Name Last Name.
1 PREPARING FOR AND CONDUCTING A PLANNING GRANT MEETING The Nonwovens Institute NC State University, Raleigh NC Behnam Pourdeyhimi Phone:
1 Introduction to Engineering Second Semester Overview Agenda Team Assignments and Information Exchange Course Overview.
Project Status Report Presenter Name Presentation Date.
P16453 Problem Definition Review Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio.
Validate Scope What we have: Requirement Traceability Matrix Verified Deliverables What we do: Inspection What we get: Accepted Deliverables.
P16453 Subsystem Design Loading, Measurement, Control, and Test of a Journal Bearing Test Platform Kris Kidder | John Dolan | Shay Stanistreet | Anthony.
Project Closeout Report. Closeout Components Project Objective Results Deliverable Results Lessons Learned Summary and Team Feedback Final Project Organization.
Magnetically Levitated Propeller Bernie Garcia (ME, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachary Louison.
Smart Power Supply Test Bench P16203 ANDRE PELLETREAU, KERRY OLIVIERA, JEREMY WILLMAN, RADOSLAW MASLANKA, VINCENT STOWBUNENKO.
BUS 1040 PROJECT MANAGEMENT Week 11 Agenda: Presentations Review Matrix Orgs. Monitoring and Problem Solving Close out continued and review. Final Group.
Complete Design & Gate Review. Complete Design Detailed Design Review (DDR) 1.“High and medium technical risk” areas –Design Review (Prelim-DDR): standard.
What has been accomplished at the end of MSD 1 & 2?
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Basic Project Management Process Basic Project Management Process Larry Creel July 11, 2003.
Houston Renewable Energy Group (HREG) Website Refresh Project Report
Project Management Jukka A. Miettinen September 4, 2006
P16512 – 3D Printing Ink Development Test Rig
Sales Training Presented by [Name].
CIS 348 MENTOR The power of possibility/cis348mentor.com
Subsystem Build & Test Andre Pelletreau, Jeremy Willman, Kai Maslanka,
[Project Name] Post-Mortem
PROJECT NAME POST-MORTEM
P17082 Biomechanical Elbow Model Preliminary Detailed Design
Sales Training Presented by Name.
The Capstone Experience
Action planning: Logical activity schedule
P17082 Biomechanical Elbow Model Detailed Design
Peer Review Agenda (Suggested).
P17082 Biomechanical Elbow Model
P15311: PCB Router Phase 5 System Pass Off with Customer
P17082 Biomechanical Elbow Model Build and Test Review
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
University of Idaho – Interdisciplinary Engineering Capstone Design
[Project Name] Project Report
P16462: Wind Energy Base Station MSD II Phase 5 Review 5/6/2016
Sales Training Presented by [Name].
The Capstone Experience
Activity When you are finished your test, hand in your test, and take a piece of paper to start working on a poster showing the differences between ionic.
[Project Name] Project Report
Modular Motion Tracking Sensors
P15311: PCB Router Phase 4 System Demo with Customer
The Software Engineering Process
P17082 Biomechanical Elbow Model Build and Test Prep
Team [Team Name] Beta Presentation
[Project Name] Post-Mortem Presentation Template
For Graduate Phase I Coordinators
P17082 Biomechanics Elbow Model
Project Name Post-Mortem
Sales Training Presented by [Name].
<Project Name> Milestone Summary Report
P17082 Integrated System Build & Test Review
SENIOR DESIGN PROJECT P08455
The Capstone Experience
Mechanical Bioreactor
Team P16228: Magnetically Levitated Propeller
Detailed Design Review (Phase 4)
Team [Team Name] Beta Presentation
Sales Training Presented by Name.
Project Kick-off <Customer Name> <Project Name>
Detailed Design Review: P18001
Speaker’s Name, SAP Month 00, 2017
University of Idaho – Interdisciplinary Engineering Capstone Design
NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Presentation transcript:

P17082 Biomechanical Elbow Model Final Presentation Maria Romero-Creel, Shannon Keenan, Chris Harley, Amanda Cook

Agenda New Issues / Problem Review / Design Updates Accomplishments since last review Parts Status BOM Build Status Testing Status and Results Action Items Schedule Review Miscellaneous Deliverables

Overview Team Vision Our goal was to prepare for Imagine RIT, complete analysis of the model and final documentation, and continue build.  Completed Goals: ImagineRIT Manual Poster Paper Pending Goals: Finish Models  

Action Completion from Build and Test Prep Review Action Item from last review Finish Test plans for model 1 - 100% Begin printing bone set for next 5 models - 10% Model 1 complete - 60% Model 2 build/test - 50% Model 3-6 build - 0% Model 3-6 test - 0% Manual - 85% Poster - 100% ImagineRIT- 100% Paper - 90% Prep hand-off - 90% Update Drawings - 100% Individual Contributions: Finish Test plans for model 1 – All Begin printing bone set for next 5 models – All Model 1 complete – All Model 2 build – All Manual - Maria Poster – Shannon Imagine Prep – All Paper – Amanda Prep hand-off – All Update Drawings - Chris

Final Design

Final Drawings

Final Drawings

Final Engineering Requirements

Test Plans Results Summary

Customer Requirements / Engineering Requirements / Test Results

Manual

Final BOM

Risk Analysis TIME TO BUILD UNITS We will only be able to build one fully working unit before end of semester Possibly a second model will be complete

Problem Tracking Summary 3-D Printing Wrong material for 3-D Printing Edit model file while printing No access to CAPSTONE Forces read 2x desired value Miss calibration of load cells

Action Completion from Build and Test Prep Review Action Item from last review Finish Test plans for model 1 - 100% Begin printing bone set for next 5 models - 10% Model 1 complete - 60% Model 2 build/test - 50% Model 3-6 build - 0% Model 3-6 test - 0% Manual - 85% Poster - 100% ImagineRIT- 100% Paper - 90% Prep hand-off - 90% Update Drawings - 100% Individual Contributions: Finish Test plans for model 1 – All Begin printing bone set for next 5 models – All Model 1 complete – All Model 2 build – All Manual - Maria Poster – Shannon Imagine Prep – All Paper – Amanda Prep hand-off – All Update Drawings - Chris

Performance vs. Requirements

Action Items Action Items Moving Forward Continue problem tracking & documentation Support model completion & refinement

Plans & Schedule Summary: 90 second talk on Thursday Finish working models Finish paper Finish Manuals