Unit: Surveying Lesson: Differential Leveling

Slides:



Advertisements
Similar presentations
Leveling {Differential Leveling}
Advertisements

Earthwork Profile Leveling 1.
Levelling Checks.
Applying Profiling Leveling Techniques
Precise Digital Leveling Section 7 Wrap-up and Bench Mark Resets.
Maintaining Gage Datum: Levels at Gaging Stations.
LEVELING (a most elevating passtime). The problem: I’m here standing on ground that’s metres above mean sea level I need to know the elevation.
Profile Leveling.
CIVL 102 Leveling Lab Briefing on Field Work. Instrument error  suppose Instrument error  suppose line of sight not truly horizontal as telescope is.
Levelling: Sources of Error
Differential Leveling Mr. Conrado Agm 230. Leveling Operations The basic function of the tripod level is to provide the operator with a level line of.
Introduction to surveying
Indiana LICA Contractor Certification Training Workshop 2008 Basic Surveying Concepts.
Applying Differential Leveling Techniques. Next Generation Science /Common Core Standards Addressed! CCSS.ELA Literacy. RST.9 ‐ 10.2 Determine the central.
S.H.H.S Building Construction
Principles of Surveying
CHAPTER 3 LEVELING.
Profile and Differential Leveling
Differential Leveling
Differential Leveling
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
Chapter (5) Leveling Introduction:
Levelling Applications:
GUJARAT TECHNOLOGICAL UNIVERSITY BIRLA VISWAKARMA MAHAVIDHYALAYA (ENGINEERING COLLEGE) VALLABH VIDYANAGAR SUBJECT: ELEMENTS OF CIVIL ENGINEERING (CODE )
Chap 7 – Differential Leveling
Lesson Applying Differential Leveling Techniques.
1 Applications Stream cross sections Highways Canals Sewers Water mains Sidewalks Retaining walls Fences Application of Differential Leveling Introduction.
How to Navigate a Set of Field Notes….. First the Jargon… Benchmark Backsight Foresight Height of Instrument Elevation Turning Point Station.
How to: Some Basic Principles for Leveling
Surveying 1 / Dr. Najeh Tamim
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Layout of a Building Leveling Instruments Builders Level Level-Transit Laser Beam Level.
Surveying Equipment. Builder’s Level A telescope instrument used to check level of forms or field grades. Builders' levels are designed to be used for.
Applying Differential Leveling Techniques
Chapter (5) Leveling Introduction:
Surveying 1A (SVG 105) PLANE TABLE SURVEYING
DIFFERENTIAL – PROFILE LEVELING
TYPES OF LEVELS BY SUMIT M. MESHRAM.
Profile Leveling.
Theodolite: Introduction
Introduction Theodolite is used to measure the horizontal and vertical angles. Theodolite is more precise than magnetic compass. Magnetic compass measures.
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Topographic Survey Land Surveying Civil Engineering and Architecture
Surveying Equipment.
Engineering Surveying
Leveling Intro to Leveling.
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Level Loop (or Closed Circuit)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
How to: Some Basic Principles for Leveling Tilo Schöne GFZ, Germany
Find: Average Slope AD [%]
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Unit 5. Levelling.
Leveling.
Leveling.
Tachometry.
Leveling.
Leveling.
Leveling.
Leveling.
TACHEOMETRY.
Surveying a Level Loop Surveying a Level Loop
Differential Leveling
Leveling.
Surveying With Construction Applications, 7th Edition
LEVELING.
Stream Crossing Bootcamp
Presentation transcript:

Unit: Surveying Lesson: Differential Leveling Ag Structures Mr. Dieckhoff PowerPoint adopted from California State Ag Mechanics Curriculum

Differential Leveling Importance of Leveling The determination of elevations is called leveling Measuring relative elevations changes is a comparatively simply process Precise and accurate control of relative elevations are critical to most construction projects

Differential Leveling The Level A level consist of a high-powered telescope The level is attached to a spirit or bubble level that keeps the line of sight of the telescope horizontal

Differential Leveling 3. Level Instrument

Differential Leveling Level Instrument 4.60 4.55 4.54 4.53 4.52 4.51 4.50

Differential Leveling C. Definitions BS = 6.32 ft HI = 106.32 ft FS = 3.10 ft Point B Point A Elevation = 103.22 ft Starting point (elevation 100.00 ft)

Differential Leveling Definitions 1. Bench mark (BM) - relatively permanent point of known elevation Starting point (elevation 100.00 ft) Point A Point B BS = 6.32 ft HI = 106.32 ft FS = 3.10 ft Elevation = 103.22 ft FS = 3.10 ft

Differential Leveling Definitions 2. Backsight (BS) - a sight taken to the level rod held at a point of known elevation (either a BM or TP) Starting point (elevation 100.00 ft) Point A Point B BS = 6.32 ft HI = 106.32 ft FS = 3.10 ft Elevation = 103.22 ft

Differential Leveling Definitions 3. Height of instrument (HI) - the elevation of the line of sight of the telescope Starting point (elevation 100.00 ft) Point A Point B BS = 6.32 ft HI = 106.32 ft FS = 3.10 ft Elevation = 103.22 ft

Differential Leveling Definitions 4. Foresight (FS) - a sight taken on any point to determine its elevation Starting point (elevation 100.00 ft) Point A Point B BS = 6.32 ft HI = 106.32 ft FS = 3.10 ft Elevation = 103.22 ft

Differential Leveling D. Computation of Elevations BS 12.64 BM1 1. BS + Elevation = HI Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00

Differential Leveling Computation of Elevations BS 12.64 FS 3.11 BM1 2. HI - FS = Elevation TP1 Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00 TP1 3.11 109.53

Differential Leveling Computation of Elevations BS 10.88 BS 12.64 FS 3.11 BM1 TP1 Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00 TP1 10.88 120.41 3.11 109.53

Differential Leveling Computation of Elevations BS 10.88 FS 2.56 BS 12.64 FS 3.11 TP2 BM1 TP1 Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00 TP1 10.88 120.41 3.11 109.53 TP2 2.56 117.85

Differential Leveling Computation of Elevations BS 9.72 BS 10.88 FS 2.56 BS 12.64 FS 3.11 TP2 BM1 TP1 Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00 TP1 10.88 120.41 3.11 109.53 TP2 9.72 127.57 2.56 117.85

Differential Leveling Computation of Elevations BS 9.72 FS 3.10 BS 10.88 FS 2.56 BS 12.64 FS 3.11 BM2 TP2 BM1 TP1 Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00 TP1 10.88 120.41 3.11 109.53 TP2 9.72 127.57 2.56 117.85 BM2 3.10 124.47

Differential Leveling Computation of Elevations BS 9.72 FS 3.10 BS 10.88 FS 2.56 BS 12.64 FS 3.11 BM2 TP2 BM1 TP1 Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00 TP1 10.88 120.41 3.11 109.53 TP2 9.72 127.57 2.56 117.85 BM2 3.10 124.47

Differential Leveling Computation of Elevations 3. Change in elevation- summation of the backsight and the foresight then subtract Point BM1 TP1 Elevation BS HI FS 12.64 112.64 3.11 109.53 10.88 120.41 2.56 TP2 117.85 9.72 127.57 BM2 3.10 124.47 100.00 +33.24 -8.77 Change in elevation = 33.24 -8.77 =24.47

Differential Leveling The initial backsight (BS) is taken to a point of known elevation The backsight reading is added to the elevation of the known point to compute the height of the instrument (HI) The level may be moved to a temporary point called a turning point (TP) The elevation of a point is the height of the instrument (HI) minus the foresight (FS)

Differential Leveling Computation of Elevations - Group Problem Prepare a set of level notes for the survey illustrated below. What are the elevations of points TP1 and TP2? BS 1.27 FS 4.91 TP1 BM 2.33 6.17 TP2 Elevation 356.68

Differential Leveling Computation of Elevations - Group Problem BS 1.27 FS 4.91 TP1 BM 2.33 6.17 TP2 Elevation 356.68 Point BM1 TP1 Elevation BS HI FS TP2 1.27 357.95 356.68 2.33 355.37 4.91 353.04 6.17 349.20 +3.60 -11.08 -7.48

Differential Leveling Common Mistakes Misreading the rod - reading 3.54 instead of 3.45 Moving the turning point - use a well–defined TP Field note mistakes - work within your group to check you records Mistakes with extended rod - make sure the leveling rod is fully extended

Differential Leveling Common Mistakes Level rod not vertical Settling of leveling rod Leveling rod not fully extended or incorrect length Level instrument not level Instrument out of adjustment Environment - wind and heat

Differential Leveling Suggestions for Good Leveling Anchor tripod legs firmly Check the bubble level before and after each reading Take as little time as possible between BS and FS Try to keep the distance to the BS and the FS equal Provide the rodperson with a level for the rod

Practice Set 1

Differential Leveling Review 1. Why is differential leveling called differential? 2. What does B.M. , B.S., H.I., and F.S. stand for in surveying? 3. If you know the starting elevation and the B.S., how do you calculate the H.I.? 4. How do you calculate the evaluation of a T.P.? 5. What common error of leveling do you think will be made the most in this class and why?