Tuesday 22nd January - morning

Slides:



Advertisements
Similar presentations
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Advertisements

17/09/2012LHC 8:30 meeting LHC Summary Week 37 Coordination: Jorg Wenninger & Jan Uythoven.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
LHC Status Fri Morning 3-June
Wednesday
Wednesday 3rd October - morning
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Friday 15th June 01:11 Injection.
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday 21st January & night
Monday fill with 1092 bunches (6 h stable beams)
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
LHC Morning Meeting - G. Arduini
Monday – recovery from MKI flashover
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 24th January - morning
Wednesday 31 October: Morning
LHC commissioning Week 38
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Wire almost entirely through beam before BLM triggers dump
Not the most productive 24 hours on record
LHC progress report Week
Friday Morning 7:30 injection for fill 2908
Sunday
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
LHC Morning Meeting - G. Arduini
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Friday 25 bunch fill dumped just before (BLM in 5)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday In the morning test cycle with probe for Q’ measurement.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Monday 27th August & night
Wednesday 26 October 2011.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Tuesday
Presentation transcript:

Tuesday 22nd January - morning 07:00 Beams dumped by OP Fill 3481: Time in stable beams: 10h13m Peak luminosity: 6.04e28 cm-2s-1 Integrated luminosity: 1.2 nb-1 07:55 Injecting probes SPS proton intensity increased to 1.8e10 ppb Intervention on ADT – see over 09:40 Injecting for physics 23-10-2013 LHC status

ADT intervention summary Needed to install attenuators to the B1 Beam Pos modules as a result of sudden decision to increase the proton beam per-bunch intensity. Sum channels now equipped by 4dB attenuator, Delta by 3dB. Saturation levels now (measured): Hor Q7 B1, Sum will saturate at 2.125e+010 charges per bunch Hor Q9 B1, Sum will saturate at 2.134e+010 charges per bunch Ver Q7 B1, Sum will saturate at 2.112e+010 charges per bunch Ver Q9 B1, Sum will saturate at 2.204e+010 charges per bunch Injection inhibit interlock is set to 3e10 ppb. This is only a quick fix to allow injection of the proton beam, the foreseen slot (~2 hours) for proper setting up for higher intensity is still required. Daniel Valuch 23-10-2013 LHC status

Tuesday 22nd January - pm 11:12 Start cogging No problems – see over Protons not particularly happy until stable beams (lifetime down to around 3 hours) 11:53 Stable beams fill 3482 12:15 ALFA: Roman Pots on beam 1 at 13 nominal sigma. 12:25 TOTEM pots (2 vertical) in 14:25 beam RF total voltage to 13.5 MV and then 14 MV later 22:01 TOTEM: extracted all Roman Pots manually. Saw Micro-UFO when XRPV.B6R5.B1 reached garage 23-10-2013 LHC status

Tuesday 22nd January – last thing 23:48 fill 3482 Dumped by BPMS - low intensity Pb bunches (3e9) Fill 3482: Time in stable beams: 11h58m Peak luminosity: 6.45e28 cm-2s-1 Integrated luminosity: 1.5 nb-1 23-10-2013 LHC status

Wednesday 23rd January – early morning Just past midnight, remaining BLM thresholds around IR7 adjusted Thanks to Eduardo Dry run new ALFA RP sequence 00:55 injecting probes Now switched to full injection scheme 338p_338Pb Struggle with injection Beam in SPS (tails, orbit…) Beam dumped over injecting Injection sequencer issues… 05:13 Lost RB.81 to QPS trigger MPE clear to pre-cycle – analysis offline 07:05 Injecting probes 23-10-2013 LHC status

BLM threshold increases BLMs protecting Q9 BLMQI.09R7.B1E10_MQ BLMQI.09R7.B1E21_MQ BLMQI.09R7.B1E22_MQ BLMQI.09L7.B2I10_MQ BLMQI.09L7.B2I21_MQ BLMQI.09L7.B2I22_MQ BLMs protecting Q11 BLMQI.11L7.B2I10_MQ BLMQI.11L7.B1E30_MQ BLMQI.11R7.B2E10_MQ BLMQI.11R7.B1I30_MQ BLMs protecting Q17. BLMQI.17L7.B2I10_MQ BLMQI.17L7.B2I20_MQ BLMQI.17R7.B1E10_MQ BLMQI.17R7.B1E20_MQ BLMs protecting Q15 BLMQI.15L7.B2I10_MQ BLMQI.15L7.B2I20_MQ BLMQI.15R7.B1E10_MQ BLMQI.15R7.B1E20_MQ The monitor names in bold red were increased yesterday. The monitors in black bold were increased this morning and the rest of the monitors late last night. Eduardo Nebot Del Busto 23-10-2013 LHC status

Cogging – symptoms/cures/understanding 3 frequency trims Beam loss spike and dump on third trim Last trim split in 2 yesterday Pragmatic cures: Raise beam loss thresholds Slow frequency shifts down (frequency ramp rate, trim size) Reduced number of bunches Worked nicely yesterday 23-10-2013 LHC status

Orbit evolution during cogging and re-phasing. 23-10-2013 LHC status

Cogging understanding Trim to go to the last frequency value (789684 for both beams) is sent by the sequencer, and immediately after the command "lock both frequencies on beam 1" is executed while the frequency trim is still on going. At this moment that the synthesizer of B2 jumps to the frequency of B1 non-adiabatically - B1 frequency is still moving… 23-10-2013 LHC status

Sequence adjusted accordingly Cogging Sequence adjusted accordingly 23-10-2013 LHC status

Usual plots 23-10-2013 LHC status

Various MB for ALICE – +40 hours from yesterday midday Wire scanners not to be used until checked in tunnel V/d Meer scans next week Mon/Tue Access requests: Wire scanner, J.Emery, point 4, 2 hours. Collimators UJ33, test position sensors, M. di Castro, A.Masi, 20 minutes. “Train”, B.Feral, D. Paulic, PM56/UL55, 1 h during working hours BGI, M.Sapinski, R4, ½ h 23/01/2013 LHC 8:30 meeting