Upscaling Basic Sanitation for the Urban Poor (UBSUP)

Slides:



Advertisements
Similar presentations
Onsite Wastewater Treatment Systems Module 4:1. What is a Septic System? Module 4:2 Photo credit: MOEE.
Advertisements

Sanitation is Business
ClASS DEBRIEF SESSIONS PROVIDING EFFECTIVE FEEDBACK.
Giving Public Presentations of Risk Information Katherine A. McComas, Ph.D. University of Maryland.
Assessment Literacy Series
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Water Services Trust Fund UBSUP & SafiSan Key Characteristics and Procedures Prepared by the UBSUP Team September UBSUP, SafiSan, plot & household.
WRITING THE ClASS REPORT
UBSUP : Area Assessment and Site Selection Prepared by the UBSUP Team July 2014 WATER SERVICES TRUST FUND (WSTF) 1 ‘’Good area assessment and selection.
Teaching Assistants Part A Supporting Teaching. Introduction  About me  Reflection on first morning –how is BUE different?  Discussion of TA role 
CHAPTER 2 Introduction to Manual Drawing. adzly anuar © Contents Drawing tools Drawing sheets and layout Lettering Lines Scale Abbreviations.
Water Services Trust Fund UBSUP Projects: The Project Task Team Composition and main Roles and Responsibilities 1 Project Task Team: Multi-stakeholder,
Water Services Trust Fund Tools for the County Resident Monitor The SafiSan Toolkit 1 posters, workshops, procedures, banners, programmes, pictures, pee,
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
The Sanitation Team Business Model Water Services Trust Fund.
1 WATER SERVICES TRUST FUND (WSTF) Up-Scaling Basic Sanitation for the Urban Poor (UBSUP) Incentives for Stakeholders The UPC Team 17 th July 2014 (Embu)
SafiSan Projects: Payments and Incentives for Toilet Emptying, Sludge transport and Treatment A step-by-step approach for WSPs Prepared by the UBSUP Team.
Prepared by the UBSUP Team Phases Approach of the UBSUP Programme & SafiSan Projects Other Subsequent Phases Phase 2 Phase 1.
Preparing Foundations for Cylinders & ASME Tanks
Upscaling Basic Sanitation for the Urban Poor Involvement of Stakeholders in the UBSUP Programme and its SafiSan Projects By the UBSUP Team 26 th - 27.
Water Services Trust Fund (WSTF) UBSUP & SafiSan Key Characteristics and Procedures Prepared by the UBSUP Team September UBSUP, SafiSan, plot &
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
SafiSan Training Programmes, Workshops & Activities Prepared by the UBSUP Team 1 WSP members of staff, Project Task Teams, DTF Operators, Artisans, Sanitation.
Septic System Construction and Location GET PUMPED!
1 WATER SERVICES TRUST FUND (WSTF) Up-Scaling Basic Sanitation for the Urban Poor (UBSUP) Finance & Business Models Prepared by the UBSUP Team.
UBSUP & SafiSan: Key Characteristics Prepared by the UBSUP Team 1 UBSUP, SafiSan, plot & household level sanitation, demand-driven approach, UDDTs, the.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Adult Student Match. You’re ready to get started!  You’ve completed RT’s orientation, training, interview and background check. Now it’s time to meet.
Development of Assessments Laura Mason Consultant.
SURVEYING FOR INSPECTORS. Course Content Introduction Chapter 1 – Chapter 1 – Field Equipment Chapter 2 – Chapter 2 – Location Survey Chapter 3 – Chapter.
Adult Student Match.
CONSTRUCTION OF A DTF DO’s and DON’Ts.
Detailed planning for fish farm construction Once the site has been selected, then initiation of planning begins. There are two main related components.
Sanitation is Business
Homeowner Responsibility
The Sanitation Team Business Model
What is an on-lot sewage system?
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Accountability Court Certification and Peer Review
PLEASE DELETE THIS SLIDE WHEN YOUR PRESENTATION IS COMPLETE
UBSUP Technical Options
Decentralised Treatment Facility (DTF)
Water Services Trust Fund
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Septic System Construction and Location
BANK MARKETING STRATEGIES
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Resource 1. Evaluation Planning Template
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Water Sector Trust Fund
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
BANK MARKETING STRATEGIES
PLEASE DELETE THIS SLIDE WHEN YOUR PRESENTATION IS COMPLETE
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Report Writing Effective reporting that gets results!
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Competency: Create site plan drawings
Determining Eligibility
Driver Diagrams.
Homeowner Responsibility
Session 5.3. Team Presentations
Summing up and next steps
SETTING OUT OF THE DTF MODULES.
International Module W505 Control of Hazardous Substances
DTM Field Companion for Location Assessment Sectoral Questions
DTM Field Companion for Location Assessment Sectoral Questions
5b. Presentation for Reviewing Photos
Presentation transcript:

Upscaling Basic Sanitation for the Urban Poor (UBSUP) DTF Site Selection Site Surveying 11/18/2018

Objective: You are able to collect data required to prepare the final design 11/18/2018

Content Questions you might to ask yourself: What is the context of this session? How is this tool used? May I try it with my colleagues? 11/18/2018

What is the context of this session? The UBSUP SafiSan Toolkit all info can be found in your manual 11/18/2018

How is this tool used? The tool consists of 3 parts: A template layout plan to capture required information Templates of tables to note required data A step-by-step instruction which data to be collected, and how 11/18/2018

Step 1 – Boundaries of DTF site Mark corners (e.g. with metal rods) Take preferably GPS coordinates of cornerstones Note distances on the layout drawing Ensure sufficient distance (riparian) to water bodies as per NEMA 11/18/2018

Step 2 – Raster levelling Define a fix and suitable benchmark (should also be used during construction, visible from the entire site to avoid transfers) Mark location of BM on layout drawing and permanently at site Take levels according to a fix raster with 20-30 points Note levels with a clear reference to the location at provided template Reference Point Level (m) B.M. 0.000 A1 A2 A3 ... „Levelling“ is explained in the next session 11/18/2018

Step 3 – Arrangement of modules Draw modules: e.g. treatment of FS and UDDT matter on a new layout plan Consider space for manoeuvring of exhauster trucks Ensure proper arrangement of pipes and inspection boxes Don´t forget proper arrangement of bypass pipes 11/18/2018

Step 4 – Levelling at particular locations Take levels at the following locations Level of the final effluent discharge point (flooding level) Ground levels where different treatment modules will be located Existing ground level where the RB will be located Existing ground level at gate Note levels in table template with clear reference Reference Point Level (m) B.M. 0.000 Outlet VFCW CA ABR ... Required to check whether pumping required 11/18/2018

Step 5 – Measurement of distances Take distances between the treatment modules that are arranged in series: VFCW outlet to final discharge point Outlet of ABR-BT to VFCW ST outlet to ABR inlet Outlet of RB/BT to ST inlet Note distances on layout plan and in table Reference Distance (m) A B C D Pipe slopes will lead to required levels of modules 11/18/2018

Step 6 – Determination of soil conditions Establish soil conditions at all locations where excavation is required Particularly for ST and ABR (underground) But also all modules (foundation) Note levels in table template with clear reference Reference Point Soil conditions RB/BT ST ABR VFCW SDRB CA House Soil conditions determine excavation cost in BoQ 11/18/2018

May I try it with my colleagues? We will have a field trip to a potential site where you can apply the tool For this purpose you will get 5 empty title blocks and several table templates to be filled Prior to that, you will learn how a levelling machine is used Field Trip & Group Exercise “Site Surveying”: Please arrange required modules (RB/BT, ST, ABR, VFCW, SDRB, CA) on a title block within your DTF technical teams Discuss with other participants and trainers the layout Measure required dimensions and levels and fill into provided tables 11/18/2018

Do you have any questions, remarks or suggestions? 11/18/2018