Western Electricity Coordinating Council Anchor Data Set (ADS) 10 year Database Building the 2028 ADS PCM Dataset Jamie Austin June 19, 2018 Western Electricity Coordinating Council
Western Electricity Coordinating Council Overview Status Updates on pending fixes Review of the 2028 ADS PCM Dispatch Western Electricity Coordinating Council
Western Electricity Coordinating Council Wheeling Rates Radha Soorya Western Electricity Coordinating Council
Western Electricity Coordinating Council On Peak Off Peak Area/Region_Name Export Hurdle rate in 2017 ADS ($/MW) (2016 dollar) Region Name Schedule 1 Schedule 2 Schedule 7 Schedule 8 Peak Hurdles Off-Peak Hurdles AB_AESO 2.14 AESO BC_BCHA 9.1 BCHA $ 6.20 $ 6.27 $ 6.27 7.11 BS_IPCO 2.67 IPCO BS_PACE 3.08 PACE $ 0.13 $ 6.22 $ 0.06 $ 2.96 $ 6.48 $ 3.08 CA_BANC 2.53 SMUD $ 0.20 $ 0.17 $ 1.66 $ 2.06 $ 2.43 CA_CFE 2.31 CFE CA_CISO 10.98 CISO CA_IID 3.32 IID $ 0.26 $ 2.27 $ 2.50 $ 2.82 CA_LDWP 5.84 LDWP $ 134.49 $ 0.33 $ 6.25 $ 9.00 $ 9.33 CA_TIDC TIDC NW_AVA AVA $ 5.77 $ 5.77 NW_BPAT 1.91 BPAT $ 0.59 $ 3.74 $ 4.46 NW_CHPD CHPD NW_DOPD DOPD NW_GCPD GCPD NW_NWMT 4.74 NWMT $ 0.23 $ 4.32 $ 4.33 $ 4.56 NW_PACW PACW NW_PGE PGE NW_PSEI PSEI $ 0.04 $ 0.01 $ 2.64 $ 1.98 $ 2.69 $ 2.03 NW_SCL SCL NW_TH_Malin TH NW_TPWR TPWR $ 0.82 $ 0.08 $ 2.99 $ 3.89 NW_WAUW WAUW RM_PSCO 3.09 PSCO $ 0.09 $ 2.20 $ 1.58 $ 1.88 $ 1.90 $ 1.80 RM_WACM 4.98 WACM SW_AZPS 3.95 AZPS $ 0.03 SW_EPE 4.16 EPE $ 0.10 $ 5.55 $ 3.17 $ 5.71 $ 3.33 SW_NVE 6.96 NVE $ 0.14 $ 1.00 $ 8.75 $ 0.57 $ 5.00 $ 9.89 SW_PNM PNM $ 0.05 $ 0.07 $ 4.83 $ 4.94 SW_SRP 2.02 SRP SW_TEPC 3.57 TEPC $ 0.12 $ 0.46 $ 6.52 $ 3.10 $ 7.10 $ 3.68 SW_TH_Mead SW_TH_PV SW_WALC WALC Western Electricity Coordinating Council
Branch Rating Mapping from PF to PCM Bhavana Katyal Western Electricity Coordinating Council
Branch Rating Mapping in GV 10.2.2 PSLF PCM Summer Normal MVA1 Summer – Rate A Summer Emergency MVA2 Summer – Rate B Summer Short Term Emergency - Summer Rate C = Summer Rate B Winter Normal MVA3 Winter – Rate A Winter Emergency MVA4 Winter – Rate B Winter Short Term Emergency Winter Rate C = Winter Rate B PCM Summer months: June 1st – Sep 30th PCM Winter months: Oct 1st – May 31st Western Electricity Coordinating Council
Additional Processing Required Region Area number in PF Winter Rating? (Yes/No) PF Rating Column Identifier (MVA1 - MVA8) Summer Normal PF Rating Column Identifier (MVA1 - MVA8) Summer Emergency Reference PF case for Summer ratings PF Rating Column Identifier (MVA1 - MVA8) Winter Normal PF Rating Column Identifier (MVA1 - MVA8) Winter Emergency Reference PF case for Winter ratings Note Comment NTTG 40 Yes MVA1 MVA2 2028 HS (GE PSLF) MVA3 MVA4 PACW and PGN 23 PACW exceptions use area 65 rule for those 60 some MVA4 zeros, Use MVA3 for MVA4 62 MVA1 -> MVA3 in PSLF MVA2 -> MVA4 in PSLF 2027-28 HW (GE PSLF) 65 23 2029 HS (GE PSLF) WestConnect All 8 ratings? All 8 ratings are provided. WAPA RM, WAPA UM, MT area use PSSE. Need to follow up. AESO Not provided Only 3 ratings provided irrespective of case - Summer Normal, Winter Normal, Winter Emergency BCHydro 50 52 No 2028 HW (GE PSLF) CIPB 30 CIPV TIDC BANC No Post Processing Needed in GV vr 10.2.2 Use Summer case for winter rating Use winter case for winter rating Western Electricity Coordinating Council
Western Electricity Coordinating Council Pending Data Fixes Yi Zhang, Jamie Austin, Tyler Butikofer, BK Ketineni, Stan Holland, and Jon Jensen Western Electricity Coordinating Council
Western Electricity Coordinating Council Pending Fixes Load fixes: PACE SPP IPC Other fixes for BTM-PV DG AAEE - Ron found 844 entries in the WECC 2028 HS power flow case, of which 7 were closed (~28 MW); Yi had confirmed all were AAEE. Western Electricity Coordinating Council
Hydro Mismatches & Wheeling Rates Update on reported hydro mismatches by Yi? NW Wheeling rates? Western Electricity Coordinating Council
Fix Generators with unknown sub-type Status of fixes by Ron Fix Generators with Unknown subtype, reported by Yi Western Electricity Coordinating Council
Western Electricity Coordinating Council CO2 Prices – Stan & BK Do we have the right CO2 prices in the model? Do we have the appropriate units outside of CA using the CA CO2 price? Western Electricity Coordinating Council
Western Electricity Coordinating Council AESO Co-Gen - Jon Implement monthly shapes Western Electricity Coordinating Council
Western Electricity Coordinating Council 2028 ADS PCM v3.5 Jamie Austin Western Electricity Coordinating Council
Western Electricity Coordinating Council
Western Electricity Coordinating Council Dumped Energy Western Electricity Coordinating Council
Western Electricity Coordinating Council Congested Paths Western Electricity Coordinating Council
Western Electricity Coordinating Council Congested Nomograms Western Electricity Coordinating Council
Generation Summary by Region Western Electricity Coordinating Council
Western Electricity Coordinating Council NW – CA Western Electricity Coordinating Council
Western Electricity Coordinating Council Southern CA Imports Western Electricity Coordinating Council
Western Electricity Coordinating Council IPP-DC Western Electricity Coordinating Council
Western Electricity Coordinating Council Canada to NW Western Electricity Coordinating Council
Western Electricity Coordinating Council TOT 2 Western Electricity Coordinating Council
Western Electricity Coordinating Council WY – UT: Path C, & Aeolus Western Electricity Coordinating Council
Western Electricity Coordinating Council Bridger West Western Electricity Coordinating Council
Western Electricity Coordinating Council Idaho - NW Western Electricity Coordinating Council
Western Electricity Coordinating Council MO-NW Western Electricity Coordinating Council
Northern – Southern California Western Electricity Coordinating Council