Case studies used to calibrate recommendations Hazard environment Range of businesses Owned vs. leased space Different building types.

Slides:



Advertisements
Similar presentations
Consultative Leadership Workshop for the Development of the Strategic National Action Plan (SNAP) for Disaster Risk Reduction and Climate Change Adaptation.
Advertisements

Museum Presentation Intermuseum Conservation Association.
Disaster Preparedness at the Institutional Level Patricia Smith-Hunt Ohio University Libraries 3 rd December, 2004.
Practical Preparations Planning for Safety and Emergencies.
Lesson 9 Design & Construction of Food Premises & Equipment
Why Plan Ahead? Limit Susceptibility Limit Risk Contain Material Loss Contain Human Impact Limit Down-Time Ensure Longevity FEMA Fact: 80% of businesses.
Barhale Procedure for Site Establishment
Hurricane Sandy. Sandy was the second-largest Atlantic storm on record Storm surge reached over 13 feet in coastal areas of New York and New Jersey The.
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Emergency Preparedness and Response
Let’s watch a DVD… DVD Instructor Notes
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
A flood occurs... Any time a body of water rises to cover what is usually dry land.
Buildings and Structures 2 Fixed Installations Aim To provide students with information to allow them to recognise the types of fixed fire protection.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Chapter 10 Sanitary Facilities and Equipment
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
Bellevue Hospital Center & Hurricane Sandy 10/29/12.
Combatting Storm Surge Flooding in Lower Manhattan and its Effects on the NYC Subway Kayde Cox, Emily Jennings, Daniel Schwartz, and Sylvia Zaki, Queens.
1.  Consider: What are my Hazard Risks & consequences?  Awareness to storm and flood risks ◦ Winds ◦ Floods ◦ Nor’easter ◦ Snow/Ice Storms ◦ Hurricane.
Food warehousing Zahra Ali Definition of food warehouse Any food storage facility, storing large or nor so large amounts of food for either.
FALAR Part 3 – Post Construction  Compilation of  Maintenance records of fire protection/life safety equipment  Test records of fire protection/life.
Safe Facilities and Equipment
Mitigation and Community Sustainability Virginia Mitigation Summit, 2004.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
Fixture Standards. Layouts Fixtures WorkingStation FixtureAccessories Greeter’sArea EquipmentContents.
Session 16: Distribution of Geospatial Data 1 Distribution of Geospatial Data in the Public Environment Hazard Mapping and Modeling.
RBTC: Business Continuity 101 July 18, What is Business Continuity? Scenario Part 1 Why is BC important? What types of plans are needed? How do.
Part 2: Buildings as a System Lee F. Ball Jr., PhD
Pre-Sandy Modeling of Storm Surge Impacts on the NYC Metro Region’s Transportation Infrastructure: Validation by Sandy, and post-Sandy Resilience Issues.
Office of Risk Management Annual Conference. AGENDA  Remembering 2009  Types of Claims Handled by the Property Unit  What to do after a loss  How.
Disaster Recovery: Lessons from Katrina Gail Ann McCreary, CRM Mississippi Power Company.
Section B Inventory Process and Forms. General Inventory Actions %Getting Started Set inventory goals and objectives %Who District Program Manager Site.
School Emergency Response Training. Unit 1: Objectives  Describe the types of hazards most likely to affect your home and community.  Identify steps.
Important points and activities.  The objective is to secure life, property, information in the event of a disaster and to facilitate business continuity.
Laurel McGinley, PE Dewberry Consultants LLC Storm Preparedness & Hazard Mitigation for Post-Sandy Red Hook, Brooklyn, NY.
Section C Nonstructural Protective Measures
LESSONS FROM LOURDES FLOOD EXPERIENCE. Repeating the Past Major flooding occurred in April 2005 Major flooding occurred in April 2005 Lourdes remained.
1 CTC 450 Review Water Processes. 2 Objectives Understand the basics with respect to operation of waterworks.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
Safe Facilities and Pest Management
WHEN DISASTER STRIKES IDENTIFICATION AND PROTECTION OF VITAL RECORDS OCTOBER 2015.
Good Operating Practice. The importance of GOP General Listeria -specific GOP Specific food GOP These are in addition to the guidance available on the.
NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC.
Fox Construction Group has over 20 years experience in providing infrastructure, support services and construction throughout.
Why make a plan? Disasters change things. When an emergency happens you may have to decide what to do very quickly, while you are worrying about what.
Ready to Respond: Disaster Staffing Toolkit. Image Source:
Floors, walls, and ceilings: Materials must be smooth and durable for easier cleaning Must be regularly maintained 9-3 Interior Requirements for a Safe.
Climate Change Threat Sea-Level Rise 1. Potential Impacts from Sea-Level Rise How might our community be impacted by sea-level rise? 2.
Floods. Facts About Floods One of the most common hazards in the United States Some floods develop slowly Flash floods develop quickly Risks are greater.
World War I Veteran’s Camp in 1934, Lower Matecumbe Key (Islamorada area)
Let’s watch a DVD… DVD Instructor Notes
New Clifton Repair Shop
It’s all about the dpisd dr plan
Let’s watch a DVD… DVD Instructor Notes
"This document can not be used without Samsung's authorization"
Electrical Gas Plumbing Heating & Cooling
Chapter 10 Sanitary Facilities and Equipment
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Let’s watch a DVD… DVD Instructor Notes
1 Semester Project Design A Multi Story Office Building
Lesson Nine: Returning to Normal
Any time a body of water rises to cover what is usually dry land.
Recent Bond Accomplishments
Let’s watch a DVD… DVD Instructor Notes
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Disaster Preparedness
Building standards Mr. Da Silva.
Presentation transcript:

Case studies used to calibrate recommendations Hazard environment Range of businesses Owned vs. leased space Different building types

Methodology Red Hook Background Business operations Hurricane Sandy impacts Storm Preparedness Challenges Mitigation solutions

Small Artisan Fabricator: Flickinger Glass Works Mid-size Manufacturer: Linda Tool Café Restaurant: Ft. Defiance

Buildings Flooding Power loss Infrastructure (transportation) Staff access to business Erratic response time for services recovery Business Operations Document recovery Lack of back-up of key records IT and Telecommunications Super storm Sandy flood water receding from MTA R Line Tunnel

Business Operations: Small, artisan shop Custom repair and new glass fixture crafting using steel molds to specifications Staff of 8 to 16 based on business volume

Hazard Risks: Located on Upper New York Bay Near Buttermilk Channel Base Flood Elevation = +12 ft* Existing ground elev. +7 ft. Front door and rear doors and windows are not water-tight Industrial hanging doors between spaces increase risk * Base Flood Elevation based on FEMA post-Superstorm Sandy data

Hurricane Sandy Impacts Flood depth of about 3 ft. Business off-line for 4 – 6 weeks Operating equipment motors destroyed Business records destroyed Off-site back-up storage also destroyed Brackish water contaminated kiln lining brick

Storm Preparedness Challenges Prevent flooding of business space Includes flooding from adjacent businesses Difficulty in obtaining replacement parts for operational equipment Lost customer design archives Lost business records Staff availability via public transportation

Permanent Mitigation Solutions Elevate critical equipment such as kiln motors and polishing equipment Seal interior pass doors Scan and archive key customer designs using secure off-site provider

Temporary Mitigation Measures Evacuate critical office equipment, and small production equipment Install pre-fabricated ¾ plywood over door and window openings seal edges with spray foam Use jacks and block stands to elevate equipment Institute emergency communications e-blast

Business Operations: Mid-size manufacturer of machined metal parts Custom fabrication of finished metal parts/components Maintains International Standards Organizations (ISO) quality management certification Staff of 20 to 30 based on business volume

Hazard Risks: Business is a few blocks inland from the Upper New York Bay and Erie Basin; Base Flood Elevation = 12 ft* Existing ground elevation = + 6 ft. Two pedestrian doors and one overhead door Plant floor is 3.5 ft. above street level Office space located on mezzanine level * Base Flood Elevation based on FEMA post-Superstorm Sandy data

Hurricane Sandy Impacts Flood depth of about 3 ft. in loading dock bay Sewer line back flow contaminated mechanical room and locker/restroom area o Eleven months later still working to fulfill backlog orders High water mark in mechanical/electrical switchgear room

Storm Preparedness Challenges Prevent flood water from reaching production equipment Potential flood water damage to small tools and delicate measuring equipment Potential health hazards from sewer backflow Temperature and humidity control Staff availability via pubic transportation Linda Tool Production Floor

Permanent Mitigation Solutions Install backflow preventer valve Install watertight pedestrian doors Reorganize plant floor storage to elevate sensitive items Small tools and measuring equipment Stored at floor level

Temporary Mitigation Measures Install temporary flood barrier at loading bay door Install temporary flood barrier on plant floor around the loading bay Institute emergency communications programs Approx. Top of Temporary Flood Barrier

Business Operations: Neighborhood, locally owned and operated café and bar Staff of about 20 Open 7 days/week 10:00 AM to Midnight except Tuesday 10:00 AM to 3:00 PM Tuesdays

Hazard Risks: Basement flooding Through sidewalk entry Through basement wall masonry Water damage to ground floor Water rising from basement Seepage through door Sidewalk Hatch Door to Basement

Hurricane Sandy Impacts Basement flooding damaged critical equipment and inventory Ground floor flooding damaged equipment, furnishings and fixtures Power failure caused loss of refrigerated food Electric meters for other tenants also located in basement Electric Service Entrance in Basement Meters for Fort Defiance Café and Tenants in 2 nd & 3 rd Floors

Storm Preparedness Challenges Prevent basement flooding Prevent ground floor flooding of food prep and dining areas Moving large quantity of small items to higher ground; e.g. Food stuffs Wine bottles Dewatering flood water from basement Stairway from Sidewalk Hatch to Basement

Permanent Mitigation Solutions Clean and repoint basement walls Install flood door at front entry Ft. Defiance Basement Masonry Wall F. Defiance Front Entry door

Temporary Mitigation Measures Temporary flood barriers at openings Conduct plumbing survey and seal unused drains Disconnect and reloc ate critical equipment Evacuate critical supplies and inventory prior to severe storm event Temporary Mitigation Opportunity: Fabricate Temporary Flood Barrier to Fit Hatch Frame. Install Barrier and Seal Joints with Spray Foam.

Common challenges Flood damage to business assets Operating equipment Business records Staff availability/mobility Mass transit operations Information on recovery assistance Public sources Private sources Post Sandy Flooding of MTA Sunway Station

Special Challenges Leased SpaceSpace with Basement Authority/responsibility for mitigation Interior mitigation disruptive Shared risk with other tenantsExterior mitigation costly Flickinger Glassworks