Undulator System Installation

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
Kathleen Ratcliffe LTU Installation October 30, LTU Installation Coordination Kathleen Ratcliffe.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
ELENA installation progress F. Butin / ELENA collaboration.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
CBETA Technical Review
Installation Global System
Some movement monitor systems at DESY
East Area Renovation Project team #6 Launch safety agreement
LUSI Coordination with LCLS
LCLS Undulator Undulator Controls Integration Network Status April 29, 2008.
From Design to Installation courtesy R. Folch S. Atieh TS / MME
Communication and Documentation Needs exemplified on WP 71
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
ARIEL Phase I Operations
LTU/Undulator Installation Status
Undulator Vacuum System
ELECTRICAL CIRCUITS AND CONSTRUCTIONS An electrical circuit is a network consisting of a closed loop, giving a return path for the current 2.
e-Beams Systems Update
Electron Beam Systems ETC and Methodology
Undulator Vacuum System
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
Extraction Michael Bevins May 17, 2007
LCLS Undulator System Production Management
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 23/01/2019.
Conventional Facilities Status
Shutdown Planning & Installation Schedule
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
DOE Review 7-9 February, 2006 Steve Lewis
Control System Overview Hamid Shoaee LCLS Control System Manager
Installation Status & Operational Readiness Process
Undulator Integration Test Status
Undulator Assembly and Installation Planning
LCLS e- Beams System Overview
Undulator Alignment Plan
Alignment Diagnostic System Status
LCLS e- Beams Systems Manager
Undulator Hall Power Dissipation
Presentation transcript:

Undulator System Installation Mike Zurawel January 22, 2008

CURRENT STATUS Undulator Hall Conventional Facilities Undulator System Instrumentation & Controls Assembly Schedule Safety

Undulator Hall Construction - Beneficial Occupancy Network & Monumentation

Conventional Facilities Electrical & Lighting Fire Sprinklers Ventilation System Compressed Air Cable Trays

Undulator System Girders Vacuum Components Quadrupoles HLS WPS Pedestals Undulator Girders Vacuum Components Quadrupoles HLS WPS

Instrumentation & Controls Cable Installation Alignment Diagnostic System - Wire Position Monitor - Hydrostatic Leveling System PPS System Instrument Racks - Installation - AC Wiring

Assembly - storage - transportation

Schedules - Assembly - Installation - Critical Path

Safety Issues Concerns Comments