Thermal Compensation Installation at LHO

Slides:



Advertisements
Similar presentations
Hiro Yamamoto LLO April 3, 2014 LIGO-G Core Optics related loss hierarchy of aLIGO Hiro Yamamoto LIGO/Caltech Introduction Loss related to geometry.
Advertisements

LIGO Laboratory1 Thermal Compensation Experience in LIGO Phil Willems- Caltech Virgo/LSC Meeting, Cascina, May 2007 LIGO-G Z.
Thermal Compensation System – TCS Technical Presentation aLIGO NSF Review LIGO Livingston Observatory April LIGO-G v5.
LIGO-G W LIGO Scientific Collaboration Meeting – LLO March Summary of recent measurements of g factor changes induced by thermal loading.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
LIGO-G W Raab: Searching for Gravitational Waves w/ LIGO1 Why Has Duty Cycle Been Lower in Livingston.
Thermal Compensation NSF David Ottaway LIGO Laboratory MIT.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
Thermal Compensation Review David Ottaway LIGO Laboratory MIT.
LIGO-G W 2005 CLEO/QELS Joint Symposium on Gravitational Wave Detection 1 High-Power Stabilized Lasers and Optics of GW Detectors Rick Savage.
G D Tasks After S3 Commissioning Meeting, Oct 6., 2003 Peter Fritschel, Daniel Sigg.
1 G Mike Smith Gravitational Waves & Precision Measurements.
LIGO-G D 1 Advanced LIGO Optical & Mechanical Layout Status Dennis Coyne, LIGO Caltech LSC Meeting, 21 Mar 2006 Version -01: with a couple of.
G D Commissioning Report P Fritschel LSC meeting, LHO 15 Aug 2005.
1 The Status of Melody: An Interferometer Simulation Program Amber Bullington Stanford University Optics Working Group March 17, 2004 G D.
Status of LIGO Aspen January, 2005 Nergis Mavalvala LIGO-G D Commissioning and detector improvements for S4.
Thermal Compensation: The GEO and LIGO experience and requirements for advanced detectors Gregory Harry LIGO/MIT On behalf of the LIGO Science Collaboration.
LIGO-G W Detector Commissioning Meeting – March 7, H1 arm cavity g factor changes resulting from 1064 nm heating Rick S, Malik R, Keita.
Enhanced LIGO with squeezing: Lessons Learned for Advanced LIGO and beyond.
G D LSC Changes in Preparation of High Power Operations Commissioning Meeting, May 5, 2003 Peter Fritschel, Daniel Sigg, Matt Evans.
Matt Evans, LSC March 2003 (G E)1 Lock Acquisition in LIGO  Who am I? »Matt Evans »Caltech graduate  What is Lock Acquisition? »The process.
LIGO Laboratory1 Enhanced and Advanced LIGO TCS Aidan Brooks - Caltech Hannover LSC-VIRGO Meeting, October 2007 LIGO-G Z.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
G D Commissioning Progress and Plans Hanford Observatory LSC Meeting, March 21, 2005 Stefan Ballmer.
G TCS installation & results at LLO Update: Systems Telecon 8 th Jan 2014 Aidan Brooks (for the TCS Team) G v1.
LIGO LaboratoryLIGO-G R Coatings and Their Influence on Thermal Lensing and Compensation in LIGO Phil Willems Coating Workshop, March 21, 2008,
AdV Thermal Compensation System Viviana Fafone AdV/aLIGO joint technical meeting, February 4, 2004.
Hiro Yamamoto GWADW Girdwood, Alaska LIGO-G Beam Splitter in aLIGO Hiro Yamamoto LIGO/Caltech BS02 to BS05? larger BS? BS in aLIGO IFO for.
8/13/2004 Stefan Ballmer, MIT / LIGO Hanford G I 1 Thermal Compensation System Servo and required heating for H1 Stefan Ballmer Massachusetts.
TCS and IFO Properties Dave Ottaway For a lot of people !!!!!! LIGO Lab Kavli Institute for Astrophysics and Space Research, Massachusetts Institute of.
LIGO Laboratory1 Thermal Compensation in LIGO Phil Willems- Caltech Baton Rouge LSC Meeting, March 2007 LIGO-G Z.
G D LIGO Commissioning Update LSC Meeting, Nov. 11, 2003 Daniel Sigg.
AdV TCS overview (quick) V. Fafone and A. Rocchi.
LIGO- G R 40m weekly meeting, Jan 05, Explore demodulation phase for DDM on 40m RSE prototype Osamu Miyakawa, Caltech LIGO-G R.
Aidan Brooks, Peter Veitch, Jesper Munch
17/05/2010A. Rocchi - GWADW Kyoto2 Thermal effects: a brief introduction  In TM, optical power predominantly absorbed by the HR coating and converted.
Effects of as-built Mirrors - analysis using FFT - Hiro Yamamoto, Biplab Bhawal, Xiao Xu, Raghu Dodda (SLU)  LIGO I mirror phase map  FFT tools  Thermal.
G D LIGO Commissioning Update LSC Meeting, March 16, 2004 Peter Fritschel.
LIGO-G D1 Losses in LHO HR Surfaces W. Kells LIGO Laboratory, Caltech With assistance from: H. Radkins, V. Parameshwaraiah, D. Cook, L. Zhang,
Thermal Compensation System TCS V. Fafone for the TCS Subsystem.
Hartmann Wavefront Sensing for the Gingin Experiment Aidan Brooks, Peter Veitch, Jesper Munch Department of Physics, University of Adelaide LSC, LLO Mar.
LIGO-G d April 24, 2007 Auxiliary Optics System (AOS) Technical Breakout Presentation NSF Review of Advanced LIGO Project Mike Smith, Phil Willems.
Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer. at the Caltech 40m interferometer. Yoichi Aso*, Rana Adhikari,
Main Interferometer Subsystem
Thermal Compensation NSF
Daniel Sigg, Commissioning Meeting, 11/11/16
Auxiliary Optics System (AOS)
Aspen January, 2005 Nergis Mavalvala
Commissioning Progress and Plans
Summary of IFO Spatial Mode Workshop
Commissioning Update PAC 15, Dec. 11, 2003 Daniel Sigg.
Commissioning the LIGO detectors
Interferometer Design for bKAGRA Phase 1 and Beyond
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
Flat-Top Beam Profile Cavity Prototype: design and preliminary tests
Modeling of Advanced LIGO with Melody
Status of the LIGO Detectors
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
LIGO Scientific Collaboration
LIGO Interferometry CLEO/QELS Joint Symposium on Gravitational Wave Detection, Baltimore, May 24, 2005 Daniel Sigg.
P Fritschel LSC Meeting LLO, 22 March 2005
Improving LIGO’s stability and sensitivity: commissioning examples
LIGO Photon Calibrators
November 2006 ITM Heating Measurements at LLO
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1
ITM03; LHO ITMx Post O2 inspection LIGO-T v1
Presentation transcript:

Thermal Compensation Installation at LHO Dave Ottaway, Ken Mason, Stefan Ballmer- MIT Mike Smith, Phil Willems- Caltech Cheryl Vorvick, Gerardo Moreno, Daniel Sigg- LHO LSC Meeting, March 15-18 2004, LLO LIGO Laboratory

Initial LIGO Thermal Compensation Concept CO2 Laser ? ZnSe viewport Over-heat pattern: Inner radius = 4cm Outer radius =11cm Over-heat correction aperture Under-heat correction aperture Inhomogeneous correction aperture Imaging target onto the TM limits the effect of diffraction spreading Modeling suggests a centering tolerance of 10 mm required to maintain good correction LIGO Laboratory

Thermal Compensation Implementation LIGO Laboratory

Thermal Compensator Layout LIGO Laboratory

Thermal Compensation Projector Annulus Mask Central Heat Mask No Masks Intensity variations across annulus image due to small laser spot size Modeling suggests that this should not be an issue Projection optics work well AOM distortion above 3W causes intensity centroid shift (these images all taken at 1 Watt CO2 laser power exiting AOM) LIGO Laboratory

Thermal Compensation Controls LIGO Laboratory

PRM Results – Mode Images at AS Port (both ITMs heated) RF sidebands-------------------------------------------------------------------------------------------------->| no heating 30 mW 60 mW 90 mW RF sidebands--------------------------------------------------------------------->| Carrier 120 mW 150 mW 180 mW (thru unlocked IFO) LIGO Laboratory

PRM Results –Sideband Buildup Max buildup at ~90 mW TC TC increased in 30 mW steps IFO is sideband locked PRM with wavefront sensing LIGO Laboratory

PRM Optical Gain during heating Maximum gain at ~90 mW central heating Same heating optimizes RF sideband buildup Same heating makes RF sideband mode resemble carrier mode LIGO Laboratory

Full Interferometer Results Interferometer locked at 1 Watt 90 mW central heating applied to both ITMs Central heating reduced Maximum power with 45 mW heating ?? No change in AS_DC throughout LIGO Laboratory

Summary of Results State SPOB GSB -------------------------------------------------------------------------------- State 2 cold 85 7.0 State 2 hot (90 mW CO2) 152 12.5 State 2 max (tRM / (1 - rRM rM rITM))2 14 State 4 cold 160 13 State 4 warm (0.8W input) 190 16 State 4 hot (2.3W input, no TCS) 240 20 State 4 hot (0.8W input, 45mW CO2) 320 26.5 State 4 max (tRM / (1 - rRM rM))2 30 LIGO Laboratory

PRM Asymmetric Heating Maximum achieved with 120 mW on ITMy only SPOB build-up is the same gotten with common heating ITMx requires 200 mW to maximize SPOB to lower value; some asymmetry observed in mode structure LIGO Laboratory

PRM Asymmetric Heating – Optical Gain LIGO Laboratory

Issues to Resolve Errors/difficulties in installation reduce the viewport aperture- annulus heating not fully functional yet Different behavior of ITMx and ITMy Optimum compensation occurs with 90mW central heating, yet models predict less than half this Tests show 90% of CO2 laser power is absorbed by ITM Misalignment of CO2 laser beam cannot explain discrepancy LIGO Laboratory