Safe Rooms What you need to know.

Slides:



Advertisements
Similar presentations
Pre-Disaster Mitigation (PDM) Flood Mitigation Assistance (FMA) Repetitive Flood Claims (RFC) Severe Repetitive Loss (SRL) D. Casey Levy State Hazard.
Advertisements

Museum Presentation Intermuseum Conservation Association.
TEA Facilities Standards
Bud Jacksons Sportsmans Bar & Grill 2209 Adams Avenue As purchased in 2003 Built circa 1920 Legacy restaurant and bar facility Existing service area: 3,446.
East Hampton High School July 2013 – July 2014 Design Phases.
FEMAs Role in Tsunami Mitigation NOAA East-Gulf Coast Caribbean Tsunami Conference June 10, 2011 Sandra Knight, Deputy Federal Insurance and Mitigation.
Prepare + Prevent + Respond + Recover + Mitigate 1 Credit Resolution Initiative GOHSEPs focus is on proactively working with applicants to: – Identify.
Site Safety Plans PFN ME 35B.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
OSHA Office of Training and Education
7 | Means of Egress (Life Safety Code)
Understanding Active and Passive Floodproofing Options for Non-Residential Buildings in a Special Flood Hazard Area Course Number: SV003 Learning Units:
Determining the Occupant Load
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 10 Improvement Analysis.
Occupancy Classifications and Loads
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Oklahoma Safe Schools April Jackie Wright, Oklahoma STO April 29, 2014  Safe Schools 101  Play Video Overview Video.
Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Hazard Mitigation Planning I Session Name: Hazard Mitigation Planning I Coastal Hazards Management Course Signed by the President on October 30, 2000 Amends.
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
Treasure Island Development Project How Tsunamis Are Generated Most tsunamis are caused by earthquakes generated in a subduction zone (where oceanic plate.
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
JUNE FLOODS AND STORMS Preliminary Damage Assessment Brief
Counting Those Contributions The Match Matters!. Authority Sections 403(a), Essential Assistance and 502, Federal Emergency Assistance, of the Robert.
Emergency Action Plans
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
May 22, 2012 Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan ASFPM 2012 Annual Conference Timothy J. Trautman, P.E., CFM Flood Mitigation.
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
Skyscraper Construction
Wind Science and Engineering Texas Tech University In-Residence Shelters An Alternative to Evacuation presented to National Hurricane Conference New Orleans,
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
OSHA Office of Training and Education
Texas Department of Public Safety WHAT’S NEW IN MITIGATION BIG CHANGES in the FEMA HMA Grant Programs.
Engineering Design Issues for Essential Facilities and Shelters.
FEMA NFIP Community Rating System and Crediting Tsunami Mitigation Mike Mahoney, FEMA Mitigation.
NFPA Chapter 6 Chapter 6 is used to classify the occupancy and the hazard contents Proper classification is used to guide the implementation of.
Update Training Meeting
Natural Disaster and Weather-Related Preparedness What to Plan For This material was produced under grant number SH F-11 from the Occupational.
Engineering Design Issues for EOC’s, Hurricane Shelters and other Essential Facilities.
Prepare + Prevent + Respond + Recover + Mitigate Benefit Cost Analysis (BCA) 1.
Prepare + Prevent + Respond + Recover + Mitigate What is the match? 1.
Wendy Blackwell, State Hazard Mitigation Officer New Mexico Infrastructure Finance Conference October 29, 2014.
Unit 1 Community Capabilities
Server Virtualization: Navy Network Operations Centers
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
RCPG Project Update 2013 Whole Community Conference November 22, 2013.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
FEMA’s Coastal Mapping and Management Process. 2 2 Welcome  Background and Coastal study methodologies  Technical Opportunities  Management Opportunities.
Community Resiliency, Morganza to the Gulf and. Community Resiliency Resiliency is frequently defined as the capacity of human and natural/physical systems.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Mitigation can include structural and nonstructural efforts.
Oconee County Hazard Mitigation Plan Update Kickoff Meeting Brian Laughlin Hazard Mitigation Planner Georgia Emergency.
HAZUS-MH is a multi-hazard risk assessment and loss estimation software program developed by the Federal Emergency Management Agency (FEMA). (animate on.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
FUEL UP FOR A NEW DAY: SAFE ROOMS IN ALABAMA The Birmingham News Photo.
Linn & Benton Counties Mid-Valley. Mid-Valley LEPC  Today's Presentation: Mid-Valley LEPC – who we are! Grants – Why apply? Emergency Plans – What are.
Property Inspection & Analysis: The Improvements
Allowances, Unit Prices, and Alternates ACT
Sprinkler Loads on Trusses
Sprinkler Loads on Trusses Educational Presentation.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
MONROE COUNTY EMERGENCY MANAGEMENT
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
29 CFR NFPA Life Safety Code
Oklahoma Department of Emergency Management
Disaster Mitigation Mitigation reduces the impact of disasters by supporting protection and prevention activities, easing response, and speeding recovery.
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
Notice of Funding Opportunity FY 2017 HMA Programs
Presentation transcript:

Safe Rooms What you need to know

What is a Safe Room For the purposes of mitigation funded grants (Hazard Mitigation Grant Program – HMGP and Pre-Disaster Mitigation Grants – PDM) the term “safe room” only applies to: Extreme wind (combined tornado and hurricane) residential and non-residential safe rooms; Extreme wind (combined tornado and hurricane) community safe rooms; Tornado community safe rooms; and Hurricane community safe rooms According to FEMA program rules, PDM and HMGP funds are not available for general population shelters, including evacuation or recovery shelters.

Safe Rooms Safe rooms are structures that are constructed or existing structures that are hardened and designed to meet FEMA 320 and/or 361 standards, both meet or exceed the ICC-500 design standard. Safe rooms designed and constructed in accordance with the guidance presented in FEMA 320 and FEMA 361 provide “near-absolute protection” from extreme-wind events. Near-absolute protection means that, based on current knowledge of tornadoes and hurricanes, the occupants of a safe room built according to these standards will have a very high probability of being protected from injury or death.

Levels of Protection In Louisiana, safe rooms must be designed to withstand: Walls/doors/windows: 250 mph tornado – 15lb 2x4 at 100mph 200 mph hurricane – 9lb 2x4 at 100mph Roof: 250 mph tornado – 15lb 2x4 at 67mph 200 mph hurricane – 9lb 2x4 at 20mph ***Location determines the wind speed design factor; when designing a combined safe room – use the most restrictive design criteria.

Eligibility Considerations The safe room project must provide immediate life-safety protection in the target area of impact of a striking hurricane and/or tornado; The safe room project is constructed with criteria recognized by FEMA to afford near-absolute protection and verified by a licensed design professional. Project applications must include documentation to show that the project meets or exceeds the criteria as found in FEMA 320 and FEMA 361. The safe room project is not located in a flood hazard area where the flood waters have the potential to endanger occupants within the safe room.

Eligibility Considerations (cont’d) Allowable safe room project costs are those directly related to and necessary for the structural and building envelope protection, that provide protection to the population required to remain in the impact zone during an extreme wind event. The safe room is designed and sized only to the extent necessary for the limited population that must remain in the impact strike area during an extreme wind event. The safe room is also designed only to the extent necessary for the limited time period that a hurricane and/or tornado event is occurring.

Population Protected FEMA will only consider PDM and HMGP applications for safe room projects that identify the safe room population that must remain behind to face an imminent threat against either, or both, tornado or hurricane hazards. This is the population that the applicant will identify and quantify, so that the anticipated population and resulting size of the safe room can be verified during the grant application review process.

Occupancy Duration Safe rooms designed to the criteria as set forth in FEMA 361 are intended to provide life-safety protection to a specific population facing the immediate threat of impact from a land falling hurricane or from a tornado. According to FEMA 361: For Hurricanes: The at-risk population should be accommodated within the safe room for a minimum of 24 hours. For Tornadoes: The at-risk population should be accommodated within the safe room for a minimum of 2 hours.

Planning Considerations Applicants must demonstrate that the following components have been considered when determining eligible safe room population: population to be protected within the area at risk of impact by tornado and/or hurricane hazards; warning capabilities, logistics, and operations components that support basic safe room functions; travel times for the population to be protected to reach the safe room, such that people are not exposed to additional risk when moving to the protected area; hazard mitigation time of protection: 2 hours for tornado and 24 hours for hurricane; and relationship of the population to be protected by the safe room to State or local emergency evacuation requirements.

Safe Rooms Uses Dual-Use Single Use Stand-alone or interior safe room Optimal utility of space Must maintain readiness Little or no increase in facility maintenance Immediate return on investment Single Use Separate structure Simplified design Ready-to-use No other demands Increase facility maintenance Lower return on investment

Safe Room Types Internal Safe Room Shielded by surrounding structure Design as independent structure Allows access without going outside Cost may be reduce Stand-Alone Safe Rooms Can locate away from potential debris Not weaken by collapse of adjacent structure Design and materials not constrained by existing structure

Hurricane Community Safe Room The required square footage based on the number and type of occupants listed For Hurricane community safe rooms, Table 3-3 from FEMA 361: Each community safe room should be sized to accommodate a minimum of one wheelchair space for every 200 occupants or portion thereof.

Tornado Community Safe Room The required square footage based on the number and type of occupants listed For tornado community safe rooms, Table 3-1 from FEMA 361: Each community safe room should be sized to accommodate a minimum of one wheelchair space for every 200 occupants or portion thereof.

Residential Safe Room The required square footage based on the number and type of occupants listed For residential safe rooms, Table 3-5 from FEMA 361

Calculating Usable Area Gross floor area minus the area of obstructions such as columns, partitions and walls, fixed or movable objects, furniture, or other equipment and features placed in the safe room Especially important for multi-use safe rooms Most sub-applications do not contain floor plans with specific calculations for the exact usable area Should not include unused areas such as mechanical rooms or storage closets

Calculating Usable Area (cont’d) FEMA 361 provides an alternative method to calculate usable square footage: For areas with concentrated furnishing or fixed seating, reduce gross floor area by a minimum of 50% For areas with un-concentrated furnishing and without fixed seating, reduce gross floor area by a minimum of 35% For areas with open plan furnishing and without fixed seating, reduce gross floor area by a minimum of 15%

Siting Considerations Other hazards: Falling Debris Flooding Operational Issues Source of occupants Warning time Capability requirements (ADA requirements) Human factors

Flood Hazards Flood hazards MUST be considered when designing a safe room The safe room should be located outside of: Coastal High Hazard Areas (Zone VE) or other areas known to be subject to high-velocity wave action Areas seaward of the Limit of Moderate Wave Action (LiMWA) where mapped (Coastal A Zone) Floodways Areas subject to coastal storm surge inundation associated with a Category 5 hurricane See Section 3.6.1 of FEMA 361 for more detail information

Operations and Maintenance Plans All community safe rooms must submit an Operations and Maintenance plan This is especially important for large-scale safe rooms, where coordinated teams may be required to handle large populations Should identify teams members responsible for various roles Refer to Chapter 9 of 361-Emergency Management Considerations for plan considerations Signage identifying safe room

Operations and Maintenance Protect critical support systems to the same level as occupants Provide for special needs, if applicable Back up lighting Emergency provisions Communication equipment Standby power

Warning Time Tornado Safe Room Hurricane safe room Warning time are minimal, usually less than 15 minutes-travel time to safe room limited Safe room must be ready to use-warning time does not allow for hurricane shutter installation Hurricane safe room Warning time are hours to days Notice is sufficient for installing hurricane shutters prior to storm

Travel Time and Considerations Travel time and egress Tornado (per FEMA policy guidance documents): 5 minutes travel time recommended 0.5 mile radius 10 minutes to secure safe room Hurricane: No minimum recommended Some restrictions exist (see HMA Guidance) ADA may change access times Must meet fire code egress requirements

Cost Estimates Per FY11 HMA Unified Guidance, the detail cost estimate should include all anticipated costs, including: Design Materials Labor Equipment Sub contractor costs Cost estimates have a documented source, such as a registered engineer or architect. Safe Rooms grants are funded at a 75% federal funds and 25% non-federal funds.

Cost Estimates (cont’d) For safe room, eligible cost are those directly related to or necessary for the hazard mitigation purpose of immediate life safety resulting from structural and building envelope protection. FY11 HMA Unified Guidance, Part IX, Section C, Table 6 contains eligible and ineligible components of both residential and non-residential safe rooms.

Cost Estimates (cont’d) As an example, reinforced walls, moisture protection, electrical lighting, doors, and windows are all eligible cost - they relate directly to the life safety protection of the occupants Paint, acoustics, flooring (beyond subflooring), cabinets, and finishes are all ineligible cost - they do not provide life safety protection Lump-sum costs are not acceptable Contingency costs are not acceptable

Cost Estimates – What’s Eligible Design activities Site preparation and building construction Structural systems capable of resisting design wind-loads Protective envelope: walls, roof system and doors other hardening activities Functional components: lighting, ventilation, heating/cooling, toilets and hand washing facilities Operation and Maintenance Plan development Lump-sum costs are not acceptable Contingency costs are not acceptable

Costs Estimates – Not Eligible Project components not directly related to mitigation purpose Project components not consistent FEMA approved performance criteria Cost of functionality or outfitting of facility Operations and maintenance of safe room Cost associated with acquisition of land

Benefit Cost Analysis Many of the items covered today are the inputs for the BCA tool The following inputs are required to execute a BCA (documentation is required) Name, address, parish, and coordinates for safe room project Scope of Work Safe room project type Project useful life Cost Estimate

Benefit Cost Analysis (cont’d) Inputs: Maximum occupancy Gross area Usable area Safe room design wind speed Radius of the community that will use the safe Structure type occupants are currently using

Useful Tools Safe room assessment checklists (Appendix B.1) Evaluate existing facilities Identify potential mitigation actions Identify best available areas Safe room Designer Manual Assessment (Checklists Appendix B.2) Sample Plans and Procedures (Appendix C and D) Review Checklists

Appendix B – Assessment Checklist Provides a method of rapid visual screening of hurricane and tornado refuge areas Identify vulnerability to hazard forces Highlight type of vulnerabilities Provide means to rank a group of facilities Less vulnerable to most vulnerable

Application Summary Purpose Type, size, and location Target population Square feet per person Design details and construction materials Estimated design and construction cost Estimated design and construction schedule BCA

Resources Safe room guidance: Funding Safe Room Tools FEMA 320/361; ICC 500; ASCE 7 HMA Unified Guidance FEMA Safe Room Interim Policy Funding PDM,HMGP requirements under HMA Safe Room Tools Operations and maintenance plan FEMA 361, Appendix B Checklist FEMA 320 Prescriptive Plans 2

Examples of Safe Rooms

Examples of Dual Use Safe Rooms

Example of a Dual Use Safe Room

Examples Costs from Texas Cost to construct 15,000 sf @ $110/sf = $1,650,000 construction cost: $ 1,237,500 federal share 75% $ 412,500 non-federal share 25% Cost to construct 5,000 sf @ 110/sf = $550,000 construction cost: $ 412,500 federal share 75% $ 137,500 non-federal share 25%

Sample budget – FEMA 361 Site work and general requirements $47,000 Major structural system: footings, floors, columns, pilasters, beams, roof $206,000 Interior partitions $25,700 Doors and hardware $12,000 Painting, floor seal, exterior waterproofing $55,000 Roofing (EPDM) single ply $22,000 Toilet partitions and accessories (ADA) $6,600 Plumbing $8,800 Electrical $46,300 Mechanical $44,000 Total Construction Costs $473,400 Profit and Fees $47,300 Total Estimated Construction Costs $520,700 Unit Cost (per square foot [sf]) $145.00/sf

Questions

Additional Information For additional information or additional questions: Jeffrey Giering State Hazard Mitigation Officer jeffrey.giering@LA.GOV 225-267-2516