Communication campaign

Slides:



Advertisements
Similar presentations
The Managing Authority –Keystone of the Control System
Advertisements

European Union Cohesion Policy
Presentation of the REA ex-post Audit processes
Characteristics of projects in EU research programmes
Communication campaign r. 2 Third parties & other sensitive relations Link with the projectLegal situations Carry out the projects (core tasks) 1. Beneficiary.
Communication Campaign 1 23 June 2014 Elisabeth Robino Head of Finance & Administration.
Communication campaign
Communication campaign FCH JU control system Elena Climent Vañó FCH JU Audit Manager.
Communication Campaign 1 Elisabeth Robino Head of Finance & Administration Nicolas Brahy Legal Adviser.
1 Financial Procedures in FP7 Projects Reporting and Audits Karolina Lis Research Assistant DCU, Finance Office
1 Emerging communities for collective innovation: ICT Operational tool and supporting methodologies for SME Associations 2010 January,
RELATIONSHIP BETWEEN THE MANAGING AUTHORITIES AND THE PAYING AGENCIES IN THE MANAGEMENT OF RURAL DEVELOPMENT PROGRAMMES Felix Lozano, Head of.
European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
AUDITING COHESION AND STRUCTURAL FUNDS IN SLOVENIA Nataša Prah Ljubljana, 
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Not legally binding FP7 Rules for Participation and Grant agreement FP7 Helpdesk 
EHEROES EC Grant Agreement Negotiations June 1, 2011 K.U.Leuven Research & Development Myriam Witvrouw.
FINANCIAL REPORTING Rules and Regulations
Contracts & Finance. A) Grant Agreement / between EC and VITO / relevant for all partners B) Consortium Agreement / between partners / relevant for EC.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Call ref.: FP ACC-SSA-2 (10/2004) Contract Negotiation - Sofia - Bulgaria 10 February, Mrs Marina ZANCHI DG Research Directorate N International.
TBTIMPACTS SIXTH FRAMEWORK PROGRAMME SPECIFIC TARGETED RESEARCH PROJECT Assessing impacts of TBT on multiple coastal uses TBTIMPACTS Contract no.: INCO-CT
Financial management Management and control systems Training for Programme Operators March 2012.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
Audit Certificates MariFish Steering Group Meeting 17 th January 2006 Rob Evans Defra Internal Audit.
RTD-A.3 Legal Unit – Myriam Gómez-Martelo 13/05/2005- University of Naples Not legally binding Sixth Framework Programme Rules and legal aspects FP6 CONTRACTS.
THE FP6 AUDIT CERTIFICATE: APPROACH AND PRACTICE IN THE RESEARCH DIRECTORATE GENERAL January 2005, Slovenia Mr Rudy Hautman External Audits Unit Research.
Ismar Financial and administrative procedures Nearest Kick-off meeting Bologna, 11 October 2006.
Basic principles of FP7 Grant Agreement Financial management and reporting.
Communication campaign Most common issues identified: analysis per cost category Antonio Requena Fernández FCH JU Financial Officer.
Megan Richards RTD FP6 Kick Off Meeting Priority 7 and 8 11 November 2004 Sixth Framework Programme MANAGING FP6 CONTRACTS.
SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) Kick-off Meeting June 8-10.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
P.Ignatiadis & Prof Vassilios Zacharopoulos ELKE TEI CRETE March 2011 FP7 Training Courses for TEI Crete 1 FP7 - FINANCIAL AND PROJECT MANAGEMENT.
Participation and dissemination Rules and Contracts FP6.
Reporting and payment claims Black Sea Basin ENPI CBC Programme Training for Grant Beneficiaries and Partners Bucharest 18 June 2014 Financial Unit.
Financial Guidelines FP6 – IST Directorate C 1 st Evaluation proposals co-ordinators Briefing 17 July 2003.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
VITAL KICK-OFF MEETING Financial aspects 7 th – 8 th April 2008 Veterinary Research Institute Brno, Czech Republic.
Sixth Framework Programme : Contracts è Legal Framework & General Principles è Contract Structure è Collective Approach l signature and entry.
EN EUROPEAN COMMISSION Budgetary Control Committee of European Parliament Budgetary Control Committee of European Parliament Brian Gray DG BUDGET Workshop.
DG Justice and Consumers Project Management Some points of attention JUST/2014/JCOO/AG/CRIM and JUST/2014/JCOO/AG/CIVI Kick-off meeting 26 January2016.
EN DG Regional Policy & DG Employment, Social Affairs & Equal Opportunities EUROPEAN COMMISSION Luxembourg, May 2007 Management and control arrangements.
ERA-NET Cofund under Horizon 2020 Jörg NIEHOFF DG Research & Innovation Dir. B – Innovation Union and European Research Area Unit B2 – Open Science and.
MATcHES Project Ruse, February 26, 2014 Nohelia Morales Martínez Project number: TEMPUS BG-TEMPUS-JPHES This project has been funded with.
Management of the Grant Agreement By Philippe Ruffio & Nathalie Hoste-Luxen Tempus project representatives’ meeting Brussels December 2011.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
WP8 Project management Milan Gocić University of Niš
Establishing good working relations
Simplified Cost Options: DG EMPL audit approach
Participation and dissemination Rules
The 6th Framework Programme
Chisinau, Republic of Moldova 2017
Structural Funds Financial Management and Control, Romania
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
Structural Funds Financial management and Control, Romania
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
Communication Campaign
Communication Campaign
Management Verifications & Sampling Methods
Communication campaign
ESF INFORMAL TWG Prague, 2-3 April 2009 Lump sums grants
Management Verifications & Sampling Methods
Technical and Financial Reporting
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
Financial and Administrative presentation on PARTICULATES project
FP7 Grant Agreement & reporting requirements
Good practices for risk assessment and control activities
Presentation transcript:

Communication campaign FCH JU control system Elena Climent Vañó FCH JU Internal Audit Manager

Agenda FCH JU control strategy: main features Ex-ante vs. Ex-post verifications CFS (ex-ante) vs. Financial Audit (ex-post) The processes 4.a. The ex-ante review process Actors / Contact points Key steps 4.b. The ex-post audit process Extrapolation 2

1. FCH JU control strategy – main features Focus of presentation ! Embraces the whole ‘Grant Management cycle’ Call planning Evaluation of proposals Negotiation and Signature of Grant Agreements Project implementation Covers two main aspects: Sound financial management (i.e. economy, effectiveness, efficiency) Legality and Regularity (i.e. in accordance with rules) Is a combination of ex-ante and ex-post verifications Actors: Internal: FCH JU Operations / Finance / Audit External: Independent experts (e.g. Mid Term Review) External auditors (CFS, Financial audits) Other bodies (Court of Auditors, OLAF, IAS) 3

2. Ex-ante vs. Ex-post verifications   'Ex-ante' 'Ex-post' When? Before the transaction is authorised After the transaction is authorised (up to 5 years after the end of the project) Frequency? Obligatory on all transactions Carry out on a sample basis How? Mainly desk review of documents On-the-spot checks at beneficiary's premises. What/Sources? Project periodic reports Mid term review Certificates methodology (CoM) / CoMav Certificates on Financial Statements – CFS Technical audits or reviews Financial audit Impact? Errors detected are corrected, by the beneficiary (new Form C) or by the JU (ineligible costs), before the transaction is approved. Errors detected are corrected after the transaction is approved and undue amounts are recovered Verifications (broad term comprising all types of reviews, controls, assessments….) Cost Eligibility: Costs charged to the project in accordance with FCH JU Grant Agreement FAQs: Certificates issued by external auditors (CFS/CoM/CoMav)  June 2012 4

‘Financial Audit’ (ex-post) 3. CFS vs. Financial Audit   ‘CFS’ (ex-ante) ‘Financial Audit’ (ex-post) Legal Basis Grant Agreement (article II.4.4) Grant Agreement (article II.22) When? If above thresholds Interim payments: JU contribution >= 325.000 € Final payments: JU contribution > 50.000 € Sample selected by FCH JU Representative Risk-based What? Objective: Costs & receipts declared in accordance with GA Scope: Agreed Upon Procedures Output: Independent report of factual findings (incl. ToR & table) Model (GA, Form D) Scope: Financial Audit Audit Report Model (agreed with audit firms) Who? Auditor selected by beneficiary Independent from the beneficiary Qualify to carry out statutory audits Special case: public bodies, secondary and higher education establishments and research organisations  Competent public officer (legal capacity & independent). FCH JU  Framework contract with 3 External Audit Firms  Conflict of Interest (‘CoI’) check PricewaterhouseCoopers (PwC) KPMG Littlejohn (POLARIS) Cost? Paid by beneficiary Declared by the beneficiary as eligible costs (*) Reimbursed by the JU at the corresponding funding rate Paid by FCH JU (*) Costs incurred for the CFS issued by the external auditors are eligible direct costs charged under the "Management" activity in the "Subcontracting" category. However the costs for the CFS established by the competent public officers can be treated as "Other direct costs" under the "Management" activity. Where it is the usual practice of the beneficiary to consider these costs as indirect costs, they cannot be charged as direct eligible costs. 5

Model: Form D updated June 2012 Content: 3 documents  completeness 3. CFS (ex-ante) Model: Form D updated June 2012 Content: 3 documents  completeness Independent report of factual findings (*) Signed by auditor Terms of reference Signed by beneficiary & auditor and appended to auditor’s report Table of procedures Completed by auditor and appended to auditor’s report The independent report of factual findings (*): Scope: Agreed procedures (no audit) on costs declared (Form C) Results: How? List of exceptions (e.g. no time records available, subcontracting not specified in Annex 1 GA, costs not allocated to project..) Impact: FCH JU uses this information to draw conclusions on eligibility of costs claimed and decide the amounts to be paid. 6

3. Financial audit (ex-post) Model: Model audit report agreed with the 3 external audit firms Content: Auditor’s opinion (*) Summary of audit adjustments Analysis per cost category: Work performed Audit findings Systematic errors  for ‘extrapolation’ Other information (e.g. internal controls, differences with CFS ) The Auditor’s opinion (*): Scope: Audit ‘In our opinion, except for…, the audited financial statements (i.e. Form C) are prepared , in all material aspects, in accordance with the grant agreement (i.e. properly reflect eligible costs, receipts (if any) and interest (if applicable) as well as apply the proper funding rates’) Results: How? Opinion + Summary of audit adjustments Impact: FCH JU endorses audit results & recover undue amounts (if any) 7

The Processes 4.a Ex-ante review process 4.b Ex-post audit process 8

4.a. The ex-ante review process (1 of 2) Actors Beneficiaries Coordinator FCH JU (Project Manager & Financial Officer) Contact points Consortium: coordinator FCH JU: Project Manager 9

4.a.The ex-ante review process (2 of 2) Key steps (deadlines): Coordinator submits periodic report to FCH JU (+ 60 days of end reporting period) Technical report (via ‘SESAM’) Financial report (via ‘FORCE’ + paper original signed) CFS (compliant with Form D), if applicable FCH JU completeness check FCH JU sends ‘Acknowledgment of receipt - AoR’ letter to coordinator FCH JU analysis of report FCH JU requests for clarifications, if any (on-going amendments ) (suspension of time limit) Coordinator submits requested clarifications Respect deadline Clarity/completeness of replies FCH JU analysis of submitted clarifications FCH JU approval of report & payment via coordinator (within 105 days of ‘AoR’ letter (minus suspension period)) 10

4.b. The ex-post audit process (1 of 4) Actors Beneficiary Audit Firm Audit coordinator: PwC (NL), KPMG (DE), Littlejohn(UK) Local audit firm FCH JU: Ex-post audit team Project Manager/ Financial Officer/ Audit Manager Contact points Beneficiary: contact person (to be) appointed Audit Firm: audit coordinator is the single contact point with FCH JU FCH JU: Project Manager 11

4.b.The ex-post audit process (2 of 4) Key steps: FCH JU sends Announcement Letter (A/L) to beneficiary Beneficiary appoints a contact person and communicate to audit firm Audit firm contacts beneficiary to agree on date fieldwork & documents Start of audit fieldwork Timely preparation of clear documents is key for an efficient audit Execution of audit fieldwork Exit meeting ‘beneficiary – auditor’ to discuss audit findings Reporting Draft audit report Beneficiary’s comments on Draft Report Pre-final & Final audit report FCH JU sends ‘Letter of conclusion’ to beneficiary FCH JU endorses final audit report (i.e. adjustments on costs declared) FCH JU implements audit results: Impact on FCH JU contribution Liquidated damages (art. II. 24) & financial penalties (art II.25) Extrapolation (if applicable) 12

4.b. The ex-post audit process (3 of 4) Extrapolation: What? Only errors of ‘systematic’ nature Why? Non-audited cost claims may suffer from similar errors that need to be corrected But beneficiary can justify why other cost claims are NOT affected by the systematic error To reduce administrative burden on beneficiary & JU if new audit. How? Beneficiary’s calculation based on 1 of the 3 methods: Method 1: precise recalculation of the costs affected by the systematic error in each of the non-audited cost claim ( + supporting documentation) Method 2: adjustment of the individual cost category affected by the systematic error by the application of a flat rate proposed by the FCH JU. Example: Method 3: application of an overall flat rate correction to the total costs proposed by the FCH JU. Example:  Methods 2 and 3: other flat rates to those proposed by the JU are also possible  new audit paid by benef. 13

4.b. The ex-post audit process (4 of 4) Extrapolation: Actors FCH JU: proposes flat rates Beneficiary: recalculates (Method 1) or confirms flat rates (Methods 2 or 3) Audit firm: ‘desk review’ of beneficiary’s calculation Information to be provided by the beneficiary and timing: Projects not concerned by extrapolation (if applicable) Method 1 (recalculations + supporting docs) / If methods 2 or 3 (confirm flat rates) The adjusting Form C (through FORCE and by post mail) When? Within 30 calendar days of the date of the ‘Letter of Conclusion’ 14