Quality Control Personnel Training

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

COMPANY MAINTENANCE MANUAL
Florida’s School Bus Safety Inspection Program
ISO in Histopathology Louise O’Callaghan MSc FAMLS
ARIZONA AUTHORIZED ADJUNCT INSTRUCTOR ORIENTATION PROGRAM
NE 127 – Codes, Standards, and Regulations American Welding Society INSTRUCTOR: Chattanooga State CC.
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
1 Synthetic Fibers in Precast Agenda What’s new Engineering & fiber performance Synthetic Fiber benefits –Rework reduction Green strength Crack control.
Amendments to the Specifications Discussion of Changes to the Concrete Materials Specifications.
 Define a Quality Assurance Program (QAP)  Review common terminology  Discuss the fundamentals of an acceptance program  Discuss the fundamentals.
1 Quality Control Program. 2 Objectives To know: To know: –How the QC Program is Doing –Effect of Specification Changes on the QC Program –Contractor.
ACF P&VP Meeting 18 th April, 2014 Yoshimitsu Nakajima MAEDA Corporation.
World Health Organization
Inspection, Quality, Variation, Statistical Control and Acceptance Criteria Dr. J.SUDHAKUMAR Assistant Professor Department of Civil Engg. NIT, CALICUT.
Concrete Quality Assurance: How Concrete is Specified and Supplied To Meet Construction Specifications Prepared By: Prof. Marcia C. Belcher Construction.
Radiopharmaceutical Production
Quality Assurance/Quality Control Policy
2002 FDOT/FTBA Construction Conference
03-0F2204 Sly Park Road UC (Replace) Prebid Outreach Meeting: CIP Structural Concrete Materials Specification Overview John Yang, P.E. Office of Structural.
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
READYMIX INDUSTRY There are two main components in asphalt concrete: 1) the asphalt cement, or glue, and 2) the aggregates.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
WELCOME N.C. DEPARTMENT OF TRANSPORTATION MATERIALS AND TESTS UNIT CONCRETE CERTIFICATION SCHOOL.
Authorization and Inspection of Cyclotron Facilities Staff Requirements.
Allen Hughes State Materials Office
Student Objectives: * You should know what the instructor expects from you to final grade You should be able to assess your level of knowledge for this.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
Important informations
Basic Principles of GMP
1 PTCS Training, Certification and Quality Assurance Equivalency November 4, 2003.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Standards, Training, and Certification in the Wastewater Industry Presented by: Bob Murphy, Sherwin Williams.
Module 2Slide 1 of 26 WHO - EDM Quality Management Basic Principles of GMP Part One.
Concrete Weight Coating Plant “Aladja”
Field Office Construction, Technical Assistance and Quality Assurance NEDC Construction Inspection for Field Office Activities USDA is an equal opportunity.
NCSLI 2007 Training Records from an Auditors Viewpoint Shawn Mason Boston Scientific.
CVL 2310 Concrete Technology Faculty of Applied Engineering and Urban Planning Civil Engineering Department Syllabus 2 nd Semester 2015/2016 Concrete Technology.
Project Materials Usage and Concerns. Project Materials and Acceptance QC/QA Specifications QC/QA Specifications Quality Control Plans Quality Control.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Maintenance Training Policy Changes
GOOD MANUFACTURING PRACTICE FOR BIOPROCESS ENGINEERING (ERT 425)
Concrete Surface Repair Technician
Clinical Engineering Lecture (3).
QC Document Update Todd Shields, INDOT.
Re-Classing Existing Diving Systems
ACPA QCAST PLANT CERTIFICATION
UTILITY VAULTS: THE PRECAST ADVANTAGE
Construction Management
Chip Seal Quality Assurance Guide
Navigating FDOT Specifications and Standards
Raw Materials For Precast Concete Pipe and Box Culverts
QC Personnel Responsibilities
Precast Concrete Pipe and Box Culvert Equipment Calibration
DOT Panel Discussion Quality Acceptance Programs & Inspection Guidelines
What is the UL QFCP? FCIA Webinar Presenters:
CDE Transportation Unit
2018 Revisions to NYCDOB Code
Good Laboratory Practices
UNDERSTANDING FOR STANDARD
Emulsion Task Force Meeting
CONCRETE MIX DESIGN PRACTICE OF ETHIOPIA AND ITS APPLICATION ON CONSTRUCTION SITES Presented by: Adiamseged Eyassu WORKSHOP ON CONCRETE CONSTRUCTION PRACTICES.
Quality Assurance for Emulsified Asphalt Surface Treatments
Concrete Surface Repair Technician
Steps towards Certification
Prime Factors for Successful Preservation Treatments
Alabama & Georgia DOT Perspectives
Fiber Reinforced Polymer Systems
Presentation transcript:

Quality Control Personnel Training Training Requirements Quality Control Personnel Training

QC Personnel Training: Know Where to Find the Rules FDOT Section 105 FDOT Materials Manual Section 6.2 (RCP) Section 6.3 (Precast Box Culverts) RCP and RCB Specs Section 449 Section 410

QC Personnel Training FDOT Section 105 – Contractor Quality Control General Requirements 105-5.11 Precast Concrete Drainage, Precast Box Culvert, Precast Concrete Pipe, Fiber Reinforced Concrete Pipe, Flexible Pipe, and Incidental Precast Manufacturing Facilities Quality Control Personnel

QC Personnel Training Requirements 105-5.11.1.1 Level I Quality Control Inspectors: Ensure that the Level I Inspectors have completed a minimum of a 12-hour, Department approved, Level I Quality Control Inspector training course in the respective work area. As an exception to this, ensure Flexible Pipe Level I Quality Control Inspectors have completed a minimum of an 8-hour, Department approved, Level I Quality Control Flexible Pipe Inspector training course.

QC Personnel Training Requirements 105-5.11.1.2 Level II Quality Control Inspectors: Ensure that Level II Inspectors have completed Department approved Level I Quality Control Inspector training and a minimum of a 5-hour, Department approved, Level II Quality Control Inspector training course in the respective work areas.

QC Personnel Training Requirements 105-5.11.1.3 Plant Quality Control Manager: Ensure that Quality Control Manager has completed Department approved Level II Quality Control Inspector training and has a minimum of 2 years construction related experience in the specific work area.

QC Personnel Training Requirements 105-5.11.1.4 Additional Requirements for Quality Control Personnel of Precast Concrete Drainage and Precast Concrete Box Culvert Manufacturing Facilities Note that these QC training aspects will not be covered in this course. It is the responsibility of the individual companies to comply with these requirements outside of this training course.

Additional QC Personnel Training 105-5.11.1.4.1 Testing Personnel: Ensure the personnel performing plastic property tests have ACI Concrete Field Testing Technician-Grade I certification. Ensure the personnel performing laboratory compressive strength testing have ACI Concrete Laboratory Testing Technician-Grade 1 certification or ACI Concrete Strength Testing Technician certification.

ACI Field Testing Certification for Concrete Box Culvert Production Note that inspectors of the steel-reinforced concrete pipe and dry-cast concrete box culverts are not required to have ACI Field Testing Technician, Grade I certification. ACI Concrete Laboratory Testing Technical Grade 1 certification is required for wet cast and dry cast production of box culverts.

Additional QC Personnel Training 105-5.11.1.4.2: Batch Plant Operator: Ensure the concrete batch plant operator is qualified as a CTQP Concrete Batch Plant Operator. As an alternative to CTQP qualification, the Department will accept the completion of a minimum of a 6-hour, Department approved, Batch Plant Operator training course.

Batch Plant Operator Qualification Note that the State Materials Office has stated that steel reinforced concrete pipe manufacturing plants and dry-cast concrete box culvert plants do not need the batch plant operator qualification.

State Materials Manual Concrete Pipe Quality Control Box Culverts

FDOT Materials Manual Section 6. 2 (Vol. II) for RCP and Section 6 FDOT Materials Manual Section 6.2 (Vol. II) for RCP and Section 6.3 (Vol. II) for Precast RCB describe the QC Personnel Training Requirements

FDOT Materials Manual Section 6. 2 FDOT Materials Manual Section 6.2.8 Training Reinforced Concrete Pipe (RCP) The applicants shall attend a Department accredited Pipe training course and receive a passing grade on the final examination for the course. Ensure that the Plant’s quality control plan includes training certification copies for their qualified quality control personnel. The State Materials Office maintains the list of the accredited Pipe training courses.

FDOT Materials Manual Section 6. 3 FDOT Materials Manual Section 6.3.8 Training Reinforced Concrete Box Culvert (RCB) The applicants shall attend a Department accredited precast concrete training course and receive a passing grade on the final examination for the course. Ensure that the Plant’s quality control plan includes training certification copies for their qualified quality control personnel. The State Materials Office maintains the list of the accredited precast concrete courses.

Re-Qualification The Level I and II qualifications will expire at the end of five years, during which, the inspectors have the choice of attending the course and retaking the examination or only they take the examination to be re-qualified for an additional five years.

Concrete Pipe University (CPU) Florida Training Agenda Level I and Level II Training Level I and Level II Exam / Certification You Will Be Certified Level II QC Technicians You Must Complete the Course and Pass the Exam We Will Help You Achieve That Goal!

Concrete Pipe University (CPU) Florida QC Personnel Training Course intended to be used as a guide Familiarize with QC documents and procedures Not a substitute for contract documents Always read and understand the specification requirements of the contract documents for your jobs

Agenda Cement and Pozzolans Aggregates FDOT Rules for QC Staff QC Personnel Responsibilities Navigating FDOT Specs / Standards Material Certifications Equipment Calibrations Cement and Pozzolans Aggregates

Agenda (Continued) Admixtures Steel Reinforcement Concrete Mix Properties Concrete Batching Pre-Pour Operations Materials Storage and Handling Post-Pour Inspections

Agenda (Continued) Advanced Mix Design Concrete Consolidation Concrete Curing Repair and Finishing QC Testing