Minuteman Vocational Technical Regional High School Progress

Slides:



Advertisements
Similar presentations
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Advertisements

St. Mary’s Hospital For Children New Patient Pavilion Progress, March – June 2011 A CAMPAIGN FOR ST. MARY’S HEALTHCARE SYSTEM FOR CHILDREN.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Update on FCPS Construction/Renovation Projects August 2009.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
U.S. Customs and Border Protection Infrastructure Update Transportation Border Working Group October 27, 2010.
Skyscraper Construction
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
CAMPAN VALLEY RESIDENTIAL LAYOUT PROJECT PHOTOS-FEBRUARY 15 th 2015.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
CE 303: Introduction to Construction
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Introduction to a pit installation
World Trade Center 7 Building Performance Assessment.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Reading Structural Drawings
Foundation Plan Layout
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Building Plans.
Construction Drawings
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
The four basic types of structures are :
Orthographic Drawings
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
Estimating and Scheduling CEE 492
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
Building Committee Presentation March 03, MAIN ENTRANCE.
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
WBS Experiment Infrastructure: LArTF GPP Project Status Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 11/02/12.
Upon completion of this module, you will be able to:
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Foundations of Technology Construction
Bond Oversight Committee
APPLICATIONS OF TECHNOLOGY
The photo is showing the south side of the building and configuration of the exterior side of the windows. Page 1, 2, and 3 of the Pella Window Elevation.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Upcoming Activities Fun Fact Click here to view the live WEBCAM
Plan for the installation of the TAMU screen
“Building Better for the People of the World”
AARNA Progress Report-June 2017
INDOOR BASEBALL / SOFTBALL FACILITY
The photo is showing the south side of the building and configuration of the exterior side of the windows. Elevation designs describe the materials and.
Carleton College Summer 2018 Science and Campus Construction Plan
Progress Report 11/10/11.
Building Frame (Column & Beam)
Minuteman Vocational Technical Regional High School Progress
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
New White Lake Township Library
Foundations of Technology Construction
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Masonry Bearing Walls.
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Minuteman Vocational Technical Regional High School Progress February 12th, 2018 – March 19th, 2018

March 15th View of Area A & B - Interior Excavation & backfill of underground plumbing elements in progress.

March 15th View of Area G – Facing North-West Steel Erection and Decking & Detailing Complete.

March 15th View of Area G – Second Floor Construction of edge form and installation of reinforcing in preparation for concrete slab on deck placement.

March 15th View of Area E – Facing West Concrete Foundations Complete. Building foundations completed on March 6th. Area C Steel Erection in progress in the background.

February 26th View of Area E South – Facing North Decking & Detailing activities in progress. March 15th View of Area E South – Facing South Decking & Detailing activities in progress.

March 15th View of Area F – Facing West Steel Erection Complete. Decking & Detailing Substantially Complete.

February 26th View of Area C – Facing East Steel Erection in Lower Level of Theater in progress. Forming of electrical duct back in progress.

March 6th View of Area C – Facing East Steel Erection in progress with the setting of steel columns. March 15th View of Area C South – Facing East Steel Erection in progress with upper framing being set.

March 16th View of Area C – Facing South Steel Erection of theater low roof in progress. Two crane pick required due to size and weight of roof beams.

Excavation & Foundation Progress 3/19/18. Building Foundations were completed on 3/6/18

Steel Erection Progress 3/19/18

March Construction Schedule Look Ahead: Area A+B Continue excavation & backfill for underslab utilities. Commence roof parapet framing and wood blocking. Installation of Roof Drain bodies. Place concrete slab on deck on Level 2. Area G Installation of Roof Drain bodies Commence roof and exterior framing. Area E – Lower Continue decking & detailing of steel. Area C Continue/Complete steel erection Commence decking & detailing of steel