1 LIGO-D1201292-V3 LLO X-End CERX VEAX PVC – 6 x 10 PVC – 6 Cap ¾ QuickEdge 5/8 QuickEdge 6+ hole centered 24 up, 39 over.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Números.
Un percorso realizzato da Mario Malizia
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
PDAs Accept Context-Free Languages
/ /17 32/ / /
Reflection nurulquran.com.
Worksheets.
& dding ubtracting ractions.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Objectives: Generate and describe sequences. Vocabulary:
1 When you see… Find the zeros You think…. 2 To find the zeros...
We need a common denominator to add these fractions.
12.3 – Analyzing Data.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
7-3 Angles in Triangles Warm Up Problem of the Day Lesson Presentation
1 1  1 =.
7 7 = = = = = = 3.
Summative Math Test Algebra (28%) Geometry (29%)
2.11.
Multiples and Factors Lesson 4.1.
ASCII stands for American Standard Code for Information Interchange
The 5S numbers game..
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
The basics for simulations
Division- the bus stop method
Factoring Quadratics — ax² + bx + c Topic
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
Look at This PowerPoint for help on you times tables
Times tables By Chloe and Izzy.
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Sequence Quickies 1  ORB Education. Visit for the other resources in this pack.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Rickleton Primary School Calculation Policy
Subtraction: Adding UP
Preview Warm Up California Standards Lesson Presentation.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
Beat the Computer Drill Multiply 12s Becky Afghani, LBUSD Math Curriculum Office, 2004.
By: Jeffrey Bivin Lake Zurich High School Last Updated: October 11, 2005.
ANALYTICAL GEOMETRY ONE MARK QUESTIONS PREPARED BY:
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
& dding ubtracting ractions.
Maths Warm Up Term 1.
Physics for Scientists & Engineers, 3rd Edition
4.7 Complete the Square.
Practice Skip Counting 8.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
Introduction Embedded Universal Tools and Online Features 2.
Multiplication Facts Practice
Graeme Henchel Multiples Graeme Henchel
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
1 LIGO-D V2 LLO X-End CERX VEAX PVC – 6” x 10 PVC – 6” Cap ¾” QuickEdge 5/8” QuickEdge 6+” hole centered 24” up, 39” over.
1 LIGO-D V5 LLO Y-End CERY VEAY PVC – 6” x 10 PVC – 6” Cap ¾” QuickEdge 5/8” QuickEdge 6+” hole centered 24” up, 39” over.
Presentation transcript:

1 LIGO-D V3 LLO X-End CERX VEAX PVC – 6 x 10 PVC – 6 Cap ¾ QuickEdge 5/8 QuickEdge 6+ hole centered 24 up, 39 over

2 LIGO-D V3 VEAX LLO Existing Cable Piers Locations Corner Station Cargo Door Reference (0) Waterfalls Hole = 10.0 x 10.0 = 4.0 d Waterfall

Baskets Vertex BSC4 3 LIGO-D V3

4 VEAX LLO Existing Cable Piers Locations Corner Station Cargo Door Reference (0) Waterfall Hole = 10.0 x 10.0 = 4.0 d VE Pump 26 x 56.5 VAC ISCB4L 72 x ISC SUS

5 LIGO-D V3 VEAX Overlay NOTE: This drawing is NOT correct yet. It was made by mirroring the VEAY drawing D v1. Its ultimate purpose is to show the existing cable tray and piers relative to the as-built IFO. Things that can be done: (Note: Blue trace is (mostly) existing tray.) 1) Remove old cable tray and pier that interferes with dome parking. 2) Locate L1-ISC-XR1 farther away from existing pier for clearance. 3) Suggest joining basket around BSC to existing cable tray at waterfall. 4) Used removed pier to extend cable tray to L1-ISC-XR1. 5) Add cable tray to reach L1-SUS-YR1. 6) Remove parallel waterfall, move T to primary waterfall. Questions and comments: 1) Where does 11U Short Rack (D v11) go? (Ignore) 2) Where does L1-AOS-XR1 (if it needs to exist) go? (Does not exist) 3) What does pentagon-2 mean regarding tray removal? Is there tray across the beam tube from L1-SUS-XR1? (Ignore) 4) Is the called-out 10 height important for some reason? LLO height is 8. (OK) 5) What are the double doors in the note all about? (Ignore) 6) A door is missing from the garb room to the VEA. (Ignore) 7) The doors are missing from the mechanical room. (Ignore) 8) L1-VAC-XR1 is missing. (Shown) 9) All cabling that currently uses under-beam tray and the waterfall is missing. (Kurt) 10) The Photon Calibrator is missing. (Mounted to tube – part of OPLEV)) 11) VE Pumps are not shown. (Shown) 12) Size of ISCB4L is not specified. (72 x 48) Existing layoutNew layout 6

<< X-End Racks LIGO-D V3 6 CDS Electronics Room X-End (CERX) Rack Layout (L1-FAC-XC1)L1-FAC-XC1 CERX (L1-VDC-XC1)L1-VDC-XC1 (L1-VDC-XC2)L1-VDC-XC2 (L1-DAQ-XC1)L1-DAQ-XC1 (L1-SEI-XC1)L1-SEI-XC1 (L1-SUS-XC2)L1-SUS-XC2 (L1-ISC-XC1)L1-ISC-XC1 (L1-TCS-XC1)L1-TCS-XC1 AC Power Signals and Fiber DC Power It is 70 from the L1-FAC-XC1 Rack to the knee of the waterfall in the VEAX. The height of the cable trays is 8. (L1-SUS-XC1)L1-SUS-XC1

<< X-End Racks Suggested Phone Locations ( ) Phone Fire Alarm System 7 LIGO-D V3

<< X-End Racks LIGO-D V3 8 X-End