Metrology Improves Pointing at 12m ALMA Telescopes

Slides:



Advertisements
Similar presentations
Lecture 20 Dimitar Stefanov. Microprocessor control of Powered Wheelchairs Flexible control; speed synchronization of both driving wheels, flexible control.
Advertisements

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
Chapter 10 Control Loop Troubleshooting. Overall Course Objectives Develop the skills necessary to function as an industrial process control engineer.
Calibration Ron Maddalena NRAO – Green Bank November 2012.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Loop Shaping Professor Walter W. Olson
DVAC CONCEPT DESCRIPTION: OFFSET GREGORIAN DISH — DVAC-1 PRIME FOCUS DISH — DVAC-2 卢雨 (Yu Lu), Vice Joint Lab. for Radio.
TCS3 Servo System Proposed Design. Why Model? Meet Resolution Requirements What Resolution Encoder to use? Velocity Configuration PID Values Wind Loading.
Collaboration Meeting at UCI, April 7-9, 2005 ANITA Navigation and Orientation Kurt Liewer.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Green Bank Laser Rangefinders.
Michael Bair Director of Pressure Metrology Fluke Calibration
Chapter One Characteristics of Instrumentation بسم الله الرحمن الرحيم.
Classification of Instruments :
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
Applied Control Systems Robotics & Robotic Control
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Instrumentation K. Constantikes.
Respected Professor Kihyeon Cho
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review GBT Precision Telescope Control System Kim Constantikes 4/8-9/03.
July 13, 2006, Starsplitters of Wyalusing 1 TPoint What the is Bisque doing now?
A Mathematical Analysis of a Sun Tracking Circuit for Photovoltaic Systems Dr. S. Louvros and Prof. S. Kaplanis T.E.I. of Patra, Greece.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Antennas in Radio Astronomy Peter Napier.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
The Telescope (pointing) Pointing background Current pointing errors. Some problems with pointing. Can we point during the painting project. For more info:
DVP Testing Neil Roddis Apr 15, SPDO Why is test and verification so important for SKA dishes? Capital cost: design for low cost of a few thousand.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Abstract The goal of our project is the continued restoration of the 8.5 meter dish at the Fick observatory in Boone, IA. Before restoration began, the.
Atmospheric phase correction at the Plateau de Bure interferometer IRAM interferometry school 2006 Aris Karastergiou.
Measurements Measurements and errors : - Here, the goal is to have some understanding of the operation and behavior of electrical test instruments. Also,
December 3-4, Green Bank GBT PTCS In Progress Review Thermal Focus and Pointing Corrections K. Constantikes.
Contents: 1. Introduction 2. Gyroscope specifications 3. Drift rate compensation 4. Orientation error correction 5. Results 6. Gyroscope and odometers.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
January 6, 2005 URSI Nation Radio Science Meeting, Boulder, CO. Pointing and Focusing the GBT K. T. Constantikes NRAO Green Bank.
1Ben ConstanceCTF3 working meeting – 09/01/2012 Known issues Inconsistency between BPMs and BPIs Response of BPIs is non-linear along the pulse Note –
By : Avr & Svr engineering college, Nandyal.. Concept : We all are familiar with the Newton's corpuscular theory of light, that light is made up of small.
Information Warfare Technologies Inc. Calibration Techniques for Amplitude DF Systems AOC SYMPOSIUM OCTOBER 2005 Mr. Al Evans President Information Warfare.
Feedback Systems and Driving Clinton Matney AT Workshop 2016.
13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review Telescope Mount Concept Vertex RSI.
DVAC PROGRESS OFFSET GREGORIAN DISH (DVAC-1) 郑元鹏 (Yuanpeng Zheng ) Joint Lab. for Radio Astronomy and Technology MAY 29, 2012.
بسم الله الرحمن الرحيم وبه نستعين
ALMA ANTENNA KEY SPECIFICATIONS
MECH 373 Instrumentation and Measurement
Circular Pointing Scans
Physics 114: Exam 2 Review Weeks 7-9
Composite Mirror Applications, Inc
Error Budget Calculation
TYPES OF ERROR Types of static error Gross error/human error
Dead Reckoning, a location tracking app for Android™ smartphones Nisarg Patel Mentored by Adam Schofield and Michael Caporellie Introduction Results (cont.)
ESA’s Deep Space Antennas
Current GBT Performance
Statistics Presentation
Uncertainty (error) in praticals
Polarization Calibration
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Measurements Measurements and errors :
Atmospheric phase correction for ALMA
doc.: n Jeff Gilbert Atheros Communications
doc.: n Jeff Gilbert Atheros Communications
MAIN CONTRIBUTOR NOISES
AD5933 報告人:葉榮陞 指導教授:沈毓泰.
Measurements & Error Analysis
EC 217 MEASUREMENTS AND INSTRUMENTATION
Presentation transcript:

Metrology Improves Pointing at 12m ALMA Telescopes Green Bank, Sept 2016 Klaus Willmeroth

12m ALMA (US / NRAO) Radio Telescope Location: Chajnantor plateau, Chile Altitude 5000m Qty: 25 US 12m antennas built by VA 25 European 12m antennas several Japanese 12m and 7m antennas Green Bank, September 2016

ALMA Pointing Requirements Specification Design Achieved All sky, all time 2.0 arcsec rms Offset pointing 0.6 arcsec rms within 2 deg window from last calibration During sidereal tracking within 15 min from calibration Pointing errors calculated for 11 positions on the sky, weighted according to ALMA weighting factors All sky Nighttime 1.17 arcsec Daytime 2.13 arcsec worst case 1.76 arcsec average Offset pointing Nighttime 0.63 arcsec worst case 0.47 arcsec average Daytime 0.48 arcsec Design pointing errors already include usage of metrology All sky 0.81…1.45 arcsec Offset pointing 0.43…0.63 arcsec Errors as per NRAO Report ALMA-35.00.666.666-A-SPE Green Bank, September 2016

Difficulties All sky pointing Offset pointing Design / Components Rigid structure required Lowest natural frequency must be high enough to support high gain servo loops Impact of precision/quality of components (bearings, gearboxes, encoders, etc.) must be <<2 arcsec each Environmental impact Errors caused by wind and deformation due to temperature were larger than the specification allowed Usage of metrology was found to be necessary Offset pointing Structure and servo must be designed that wind error is <~0.3 arcsec rms Impact of precision/quality of components (bearings, gearboxes, encoders, etc.) on random error must be <<0.6 arcsec each Servo noise / tracking accuracy must be in the order of 0.2 arcsec w/o wind Green Bank, September 2016

Approach for Metrology A bad (i.e. structurally weak) telescope can’t be turned into a good one just by adding metrology! Use metrology for those pointing error contributions which – without compensation – would blow the error budget Sensors must … be of industry standard and appropriate for use on [outdoor] telescopes. Lab-type sensors cannot be used. work with required accuracy over full temperature range of telescope Use as little metrology as possible because Sensors have measurement errors which in the first place increase the pointing error Sensors which provide accuracy in the sub-arcsec range are not common. Calibration of sensor readout over temperature may be required. Implementation, testing and calibration doesn‘t come for free and takes time… Green Bank, September 2016

Metrology I Tiltmeter High accuracy dual axis tiltmeter installed in center of Az axis at level of Az bearing Tiltmeter measures change of Az axis tilt due to Temperature deformation of support cone Constant wind (gusts are too fast to react on) Changing tilt of foundation Tiltmeter behavior over full temperature range Output signals change slightly with temperature Determination of calibration curves output signal = f(temp) is required (per tiltmeter) Note: the constant tilt of the Az axis is measured by the tiltmeter but subtracted from the compensation. It is covered by the systematic error model. Metrology should not be required to remove such systematic errors. Green Bank, September 2016

Metrology II Linear Sensors Concept: measure tilt or expansion of one or both yoke arms, mainly caused by temperature gradients Sensors installed in the yoke arms One end of each sensor is mounted on a CFRP structure which is attached to the Az bearing Thus any displacements of the yoke arm relative to the bearing is measured Compensations Elevation errors (yoke arms extend at front or rear) Azimuth errors (left or right yoke arm extends) Yoke arms Green Bank, September 2016

Metrology III Temperature Sensors Temperature sensors at head part Sensors at the apex detect gradients in the support structure for the subreflector positioner Temperature gradients cause mis-pointing of subreflector The resulting deflection is taken into account when calculating the commanded position of the subreflector positioner (which anyway is required to compensate for misplacement of the S/R due to gravity) More temperature sensors More sensors are installed at different locations on the telescope They are monitored by ALMA but not used for pointing corrections Some telescopes have been equipped with up to 100 temperature sensors for detailed monitoring S/R Positioner support structure Green Bank, September 2016

Magnitude of Compensated Errors Specification 2.0 arcsec all-sky 0.6 arcsec offset pointing (2 deg radius, for 20 min) Error Budget Telescope would be in spec at nighttime (no temperature gradients) Wind error ~ 1 arcsec This is a problem only for offset pointing At least partial compensation is required to achieve 0.6 arcsec accuracy Temperature errors ~15 arcsec during daytime Measurements Sensor recording over 24h with the sun shining on the telescope Temperature variation ~12K Results confirm the calculations Individual compensations ~±5 arcsec Total compensation ~±8 arcsec Green Bank, September 2016

Conclusion Pointing of ALMA Telescopes is within specification Mechanical and servo system work and perform as expected Metrology… is turned on is able to keep impact of environmental effects (wind, temperature, sunshine, etc.) within intended limits is reliable. None of the sensors has been returned neither to VA nor (to our knowledge) to the sensor manufacturers. The result? ALMA is working and doing great science… Green Bank, September 2016