Koyo Torrington Seven Step

Slides:



Advertisements
Similar presentations
8D Corrective Action. 2 8D Problem Solving & Corrective Action: Initiate 8D Corrective Action D1 - Create Problem Solving Team D2 - Define the Problem.
Advertisements

Jidoka for Quality Improvement Lean en France, 20 May 2011 Yves Mérel, FCI Group Lean Director.
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Lean Six Sigma Knowledge of Lean 6σ Tools can help you in your daily work.
Chapter 8: Project Quality Management
 Backdrop – JIT foundation  Understanding your Business … KPI’s  Value Streams … ‘True North’  Lean Partnerships to drive cost improvement  Design.
Problem Management Overview
Overview of DMAIC A Systematic Framework for Problem Solving
Space and Airborne Systems NDIA/SEI CMMI Technology Conference Presented by N. Fleischer 1 Raytheon’s Six Sigma Process and Its Application for CMMI By.
A Comparative Analysis of SE to LSS (Lean Six Sigma) William “Bill” Fournier 15 May, 2012.
© 2007 Pearson Education Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 12 Statistically-Based Quality Improvement for Variables.
N By: Md Rezaul Huda Reza n
Cost of Quality - COQ MGMT-5060 Operations Management.
Fast Response Governance Drill Deep and Wide Abel Acuña January 27 th 2010.
Quality and Productivity Management Deming, TQM, and 6 Sigma.
Project Quality Management.  Define project quality management.  Describe quality planning and its relationship to project scope management.  Discuss.
John Lunardi John Lunardi Director, BCA Supplier Quality
Using Total Quality Management Tools to Improve the Quality of Crash Data John Woosley Louisiana State University.
ASIL, Inc. Proprietary Information1 Effective Provider Relationships Powered by ASIL, Inc. “Business Performance Management ”
UNIT 5.
IT Project Management, Third Edition Chapter 8 1 Chapter 5: Project Quality Management.
Version Corrective and Preventive Action
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
QSB Quality System Basics & Q7 tools in practice
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Analyze Wrap Up and Action Items
FMEA Training.
LESSON 4 Process Improvement – Lean
MODULE 5 Quality Monitoring
The DMAIC Method
Six Sigma.
Enterprise / Production System Interface Expand Internally/Externally
DRIVING IMPROVEMENTS Through Six MahindraSatyam
Causal Analysis & Resolution (CAR) Support Category
Lean Six Sigma DMAIC Improvement Story
ISO 14001: 2004 Environmental Management Review Presentation
Integration Management
CS 325: Software Engineering
Lean Six Sigma DMAIC Improvement Story
Global Supplier Quality Early Production Containment Training
Introduction to Materials Management
Lean Six Sigma DMAIC Improvement Story
Supplier Improvement Program Update
Company Name 2007 Quality Performance Review
GHSP Problem Solving Team Champion: Team Members: Team Mentor:
  Aptiv Global Supplier Quality Early Production Containment Training.
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
RISK REDUCTION PROCESS
Software Engineering I
Capability Maturity Model
SCAR Corrective Action Report Supplier Quality Assurance
DMAIC STANDARD WORK TEMPLATE
See the possibilities TM.
Failure Mode and Effect Analysis
DMAIC STANDARD WORK TEMPLATE
Chapter 10 Quality Improvement.
Global Supplier Quality Early Production Containment Training
Project Integration Management
Glossary Action Plan Advanced Product Quality Planning
Introduction of the new Canada Consumer Product Safety Act
Project Integration Management
Supplier Quality Review Training Material Nordin Mimouni – Supplier Quality Manager Rev. 1 – June 26th 2017.
Capability Maturity Model
Glossary Action Plan Advanced Product Quality Planning
Glossary Action Plan Advanced Product Quality Planning
Lean-Green belt six sigma program
Presentation transcript:

Koyo Torrington Seven Step Abel Acuña January 21th 2010

Top level Seven Step process Data Pareto Prioritize Scorecard Closure Paynter Solve

Development Process Koyo Seven Step Supplier process “Gain Control” Seven Step focuses supplier and SQD /SQA resources Utilize the data effectively Pareto high impact Establish supplier commitment to “Improve” The supplier is part of the Value Stream within Koyo’s manufacturing operations Standardize lessons learned Develop a close loop Read across commodity Eradicate defects Focus on prevention vs. detection in the process Sorting alone will not achieve a stable process Errors can occur and will escape Integrate into the APQP model Go back to the PFMEA and control plan and build on known risk factors

Development Process- Raise the bar Summary Build accountability It takes leadership at all levels Protect the supply chain, while your process is being stabilized Leverage value stream network SQD focus is to work with other functional areas to balance the “production cell” in the value stream Treat the supplier as if the Value Stream was within Koyo’s manufacturing plant We are dependent on our suppliers performance to quality and service

Supplier 2010 Performance DMR

Supplier – Name Quality Analysis Process Pareto

#1 Issue – Defect Pareto Level II

Root Cause Verification – Proof #1 Issue – Defect Root Cause Analysis - Issue Root Cause Verification – Proof Actions - Action Target Date Responsibility Effect Root Cause Analysis – i.e. Through Six Sigma analysis root cause was verified as rack condition, describe or show data to support that conclusion Actions – list the top 3 actions addressing the root cause, including timing and responsibility and anticipated EFFECT on PPM

#1 Issue – Defect Deployed CS1 Installed Level 2 Poka-yoke 2007 Forecast of C/A Impact Deployed CS1 Installed Level 2 Poka-yoke Establish Predictive Tool Maintenance Schedules The waterfall should PROJECT PPM performance as a result of the specific actions described on the previous slide

#2 Issue – Defect

Root Cause Verification – Proof #2 Issue – Defect Root Cause Analysis - Issue Root Cause Verification – Proof Actions - Action Target Date Responsibility Effect Root Cause Analysis – i.e. Through Six Sigma analysis root cause was verified as rack condition, describe or show data to support that conclusion Actions – list the top 3 actions addressing the root cause, including timing and responsibility and anticipated EFFECT on PPM

#2 Issue – Defect 2007 Forecast of C/A Impact The waterfall should PROJECT PPM performance as a result of the specific actions described on the previous slide

Overall Waterfall CS1 Containment Level 2 Poka-yokes New lever packaging The individual actions should be deducted from the baseline (in the month they occur) to achieve the projected overall PPM.

2007 Supplier Effectiveness Paynter Chart Corrective Action Implemented Corrective Action Not Effective Corrective Action Effective