Greenfield Solution Lease Solution Site Selection.

Slides:



Advertisements
Similar presentations
RETAINED SOIL WALL SYSTEM™
Advertisements

OUTLINE Definitions Examples of Landfills in the Valley
Subterranean Success: Geothermal Energy Powering Schools
New Construction: Small Office Prescriptive Path.
July 18, 2012 v4 The advantages of building with Third Line Healthy Walls.
Potential Second Access Currently we are working on approval access to 2 nd Avenue under CP tracks as shown in top left photo. Our entrance would be across.
Architectural Drawing
7 | Means of Egress (Life Safety Code)
Built Rite Industries Los angeles, CA & Savannah, GA Office Kit Presentation ©. Copyright of Built Rite Industries, LLC.
Energy Efficient Heating Ventilating and Air Conditioning.
ONE LIBERTY CENTER MICHAEL ROMESBURG STRUCTURAL OPTION APRIL 15, 2003 SENIOR THESIS THE PENNSYLVANIA STATE UNIVERSITY DEPARTMENT OF ARCHITECTURAL ENGINEERING.
This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over.
Basics of Fire Sprinkler Design
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
1. 2 Earthquake effects on health care facilities 2.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
Successful Build-to-Suits in the Real World. Introduction to Presenters Ted Anspacher, SIOR, Anspacher Commercial Real Estate Services Tim Gallagher,
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Constructions of Large-panel Buildings in Vilnius
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
eQuest Quick Energy Simulation Tool
“We may not be the biggest, but we want to be the best” For nearly 16 years we have been providing warehousing and transportation services to many valued.
Concrete Fooring & Roofing System
AIA LOGISTICS. Quality Management Policy 1.Delivery cargo on-time, with complete and safety 2.Staff improvement program and encourage to practice quality.
 1  Outline  putaway  pallet storage and retrieval  case retrieval  project.
Introduction Progression of Warehousing Decisions Why Use Warehouses?
Warehouse Layout Design Project
Overview Waffle Slab.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Council Rock High School South Brad Kirkham Structures Council Rock High School South Northampton Township Council Rock High School South Brad Kirkham.
American Cyber Logistics American Cyber Logistics Schneck Properties Of S.C. An overview of our facility and grounds.
CTC 422 Design of Steel Structures
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
OMSAN LOJİSTİK Day 2Day 1 Session 2 – Afternoon Process and Technology Alternatives Pallet Storage Case Picking - Manual - Mechanized Session 3.
8/15/2015 IENG 471 Facilities Planning 1 IENG Lecture 16 Warehouse Operations – Facility.
Racking In The Foodservice Warehouse W. Frank Dell CMC President DELLMART & Company 125 Hardesty Road Stamford, CT
  WAREHOUSING   DISTRIBUTION   LOGISTICS Consolidated Shipping Logistics Centre JEBEL ALI FREE ZONE, DUBAI, UAE.
Yantian Logistics Center Address Shenzhen Hongkai Export Supervised Warehouse Ltd. No.B 15# Block, Mingzhu Road, Yantian Port, Shenzhen.
Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Site # Former Motorola Facility Harvard, Illinois 900 Woodlands Parkway Vernon Hills, Illinois Office; Fax: Cell:
George Read Hall The University of Delaware
Construction Drawing Occupational Safety and Fundamentals
Construction Drawings
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Industrial Design Trends August 13, 2013 architecture | planning | interiors graphics | civil engineering.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
DESIGN & DETAILED ENGINEERING CONSULTANT
Logistics Management CHAPTER ELEVEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Sprinkler Loads on Trusses
Estimating and Scheduling CEE 492
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Independence Tube Corporation Member Spotlight 2016 Summer Conference.
Session 1: Identifying Construction Drawings and Drawing Components.
Auxiliary Services Requirement Space
The Design Team Carl James.
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
Pre-Contract Cost Control
Learn How To Utilize Different Transportation Method
4th Annual Construction Law Summit
The Bond Street Wharf Baltimore, Maryland
ActivRAC® Layout Considerations
INDUSTRIAL / COMMERCIAL Facility For Lease
Facilities and Layout Planning
Q:\Pictures\Industrial\NWQ\Crescent IV\Crescent IV - pic for flyer.jpg
Unit 47, Rosemount Park Drive, Rosemount Business Park, Ballycoolin, Dublin 15 To Let 25,006 sq. ft 2,323 sq. m High spec logistics facility with 11 meters.
Presentation transcript:

Greenfield Solution

Lease Solution

Site Selection

Success Is... Client is Pleased Operations Focus Operations Focus Profits

Site Selection

Additional Site Criteria Due Diligence –Soils Investigation –Environmental Report –Planning and Traffic –Authorities Entrances Circulation Building Orientation Turning Radius Rail Due Diligence –Soils Investigation –Environmental Report –Planning and Traffic –Authorities Entrances Circulation Building Orientation Turning Radius Rail

Lease Solution

10,000 sq. ft. or more

Types of Facilities

Concept Development The consultant can supply the broker/client: –Facility Planning –Right Sizing –Budgeting –Layout Assistance Sometimes the work is confidential –perhaps frustrating to vendors –element of trust The consultant can supply the broker/client: –Facility Planning –Right Sizing –Budgeting –Layout Assistance Sometimes the work is confidential –perhaps frustrating to vendors –element of trust

The Structure Precast concrete walls Flat built-up membrane roof, R20 28 feet clear to underside of joists (depends on footprint of building) –4 to 5 pallets high 7 inch concrete floor with or without fibre reinforcing (loading) Sealed with a penetrating floor sealer Precast concrete walls Flat built-up membrane roof, R20 28 feet clear to underside of joists (depends on footprint of building) –4 to 5 pallets high 7 inch concrete floor with or without fibre reinforcing (loading) Sealed with a penetrating floor sealer

Concept Development

Shipping Doors All doors to be 9 ft. x 10 ft. Shelters or seals at doors Dock levelers to be electric, hydraulic rated at minimum 27,000 lbs. with 18 inch lip Wheel chocks Protective bollards each side of doors (typically on drive in doors only) Truck articulated lights at each door Optional – Truck restraints, back up lighting package, inflatable seals, power doors All doors to be 9 ft. x 10 ft. Shelters or seals at doors Dock levelers to be electric, hydraulic rated at minimum 27,000 lbs. with 18 inch lip Wheel chocks Protective bollards each side of doors (typically on drive in doors only) Truck articulated lights at each door Optional – Truck restraints, back up lighting package, inflatable seals, power doors

Dock Heights

The Building 20,000 sq. ft. up to 1,000,000 sq. ft. Travel depth becomes a factor, fire corridors (egress) Narrow Width or finger design - cross dock Large quantity of Doors Bay Size –38 ft. by 40 ft. Reach Trucks –30 ft. by 40 ft Turret Trucks First bay behind shipping to be 60 to 70 ft. deep (marshalling) 120 ft. from truck doors to end of asphalt Concrete dolly pads 15 ft. wide or concrete truck apron 65 ft. deep 20,000 sq. ft. up to 1,000,000 sq. ft. Travel depth becomes a factor, fire corridors (egress) Narrow Width or finger design - cross dock Large quantity of Doors Bay Size –38 ft. by 40 ft. Reach Trucks –30 ft. by 40 ft Turret Trucks First bay behind shipping to be 60 to 70 ft. deep (marshalling) 120 ft. from truck doors to end of asphalt Concrete dolly pads 15 ft. wide or concrete truck apron 65 ft. deep

The Building Interior Protective bollards at doors, electrical equipment, all water and gas pipes Lighting at 35 FTC based on open concept until Racking configuration is known Battery charging area with floor drain (possible acid neutralizer) and power distribution Finished office area as required Optional Items - Paint all interior walls, deck and structure, shippers office, Truckers washrooms and secure area etc. Protective bollards at doors, electrical equipment, all water and gas pipes Lighting at 35 FTC based on open concept until Racking configuration is known Battery charging area with floor drain (possible acid neutralizer) and power distribution Finished office area as required Optional Items - Paint all interior walls, deck and structure, shippers office, Truckers washrooms and secure area etc.

Mechanical, Electrical & Fire Protection Lighting – 35 FTC open concept unless racking layout available Battery Charging Area – power and panel to area Circulation Fans in Warehouse, usually 1 per 5,000 sq. ft. Unit Gas Fired Heaters most economical, however Infrared heating for dock doors often preferred ESFR Sprinkler system required for 28 ft. clear to u/s of deck Lighting – 35 FTC open concept unless racking layout available Battery Charging Area – power and panel to area Circulation Fans in Warehouse, usually 1 per 5,000 sq. ft. Unit Gas Fired Heaters most economical, however Infrared heating for dock doors often preferred ESFR Sprinkler system required for 28 ft. clear to u/s of deck

Quality Features of a Crossdock Fulfillment Centre Clear Span for facility – typically 80 ft. Infrared heating due to constant door opening Dry Sprinkler system – minimum temperature Palletized receipts inbound Less than pallet/case quantity outbound Possible in larger facilities –3 level pick towers or cross dock conveyor systems –quick response pick lanes Clear Span for facility – typically 80 ft. Infrared heating due to constant door opening Dry Sprinkler system – minimum temperature Palletized receipts inbound Less than pallet/case quantity outbound Possible in larger facilities –3 level pick towers or cross dock conveyor systems –quick response pick lanes

Facility Examples

Schedule by Method DESIGN/CONSTRUCTION MANAGEMENT, DESIGN/BUILD, or TURNKEY TENDERING CONSTRUCTION Time & Money Saved CONSTRUCTION DESIGN/GENERAL CONTRACT CONCEPT DESIGN DETAILED DESIGN CONCEPT DESIGN DETAILED DESIGN TENDERING

Benefits of Turnkey Costs estimated & guaranteed early in process Guaranteed delivery Non-adversarial approach between parties & owner Single point of contact Cost effective per functional square foot Fast-track potential Broader professional input early in process Costs estimated & guaranteed early in process Guaranteed delivery Non-adversarial approach between parties & owner Single point of contact Cost effective per functional square foot Fast-track potential Broader professional input early in process

Shameless Corporate Promotion TURNKEY MANAGER Facilities Programming & Plant Layout Logistics Management Transportation & Traffic Studies Cost/Benefit & Lifecycle Costing Project & Construction Management Services Information Technology MES Traditional Engineering Environmental & Civil Engineering GIFFELS

BUILDING SUCCESS INTO NEW FACILITIES YOU CAN MAKE A DIFFERENCE YOU WILL BE THE BIGGEST BENEFACTOR Thank You