Division of Mining & Reclamation

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Legislative & Regulatory Update Mine Drainage Task Force Symposium Jason Bostic West Virginia Coal Association March 29, 2011.
Legislative / Regulatory Update Jason D. Bostic West Virginia Coal Association March 30, 2010.
Office of Surface Mining Reclamation and Enforcement
Surface Mining Control Reclamation Act Michael Dashefsky Period: 4 Bodas.
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Coal Mining Activities Mark A. Taylor Huntington District Corps of Engineers.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.
SEACC v. USACOE A Case Study for the Env. & Nat. Resources Section November 19, 2008.
MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING, MONITORING, AND RECLAIMING OPERATIONS MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING,
BUILDING STRONG ® Mitigation in a Modern World or 33 CFR 332 and You Presented by Jayson M Hudson To the Texas Association of Environmental Professionals.
Definition of Solid Waste Final Rule Public Meeting Charlotte Mooney Office of Resource Conservation and Recovery U.S. Environmental Protection Agency.
Deborah M. Smith United States Magistrate Judge District of Alaska LAWS AND LAW ENFORCEMENT RELATED TO FRESHWATER ECOSYSTEMS Second Asian Judges Symposium.
Reclamation Plan Project Purpose: To Satisfy Syar’s Reclamation Obligation under SMARA for the Healdsburg Terraces (Basalt, Phase I, Phase II and No Name.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
1 Massachusetts Wetlands Regulations and the MCP Rachel Freed Mass. Department of Environmental Protection Wetlands and Waterways Program Northeast Regional.
Spectra Energy Partners Texas Eastern Transmission, LP Ohio Pipeline Energy Network Project (OPEN) Clean Water Act Section 401 Water Quality Certification.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
Wetlands Mitigation Policy Sudbury Wetlands Administration Bylaw April 27, 2015.
Connecticut Department of Transportation Bureau of Policy & Planning.
Section 404 of the Clean Water Act 404(b)(1) Guidelines Field Exercise
SURFACE MINING CONTROL AND RECLAMATION ACT OF 1977 Rosemary Newsome.
Bob Evans, Director Lexington Field Office Office of Surface Mining Reclamation & Enforcement.
Office of Surface Mining Reclamation and Enforcement MissionEnsure that coal mines are operated in a manner that protects citizens and the environment.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
Carrin Williams.  Purity of Waters Act  To assure supplies of clean drinking water  Clean Streams Law  To protect the streams from pollution.
US Army Corps of Engineers BUILDING STRONG ® 2012 Changes to Stream Mitigation Procedures and Guidelines Mike Moxey USACE, Mobile District IRT Chair May.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Non-Zoning Wetlands Bylaw Public Hearing January 15, 2009
Section 404 Permits Update
1 BLM’s Hydraulic Fracturing Revised Proposed Rule 2013 Virginia Governor’s Conference on Energy Richmond, VA October 16, 2013 Presented by: Luke D. Johnson,
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
Wetlands and Waterways Permits Ken Franklin Statewide Permits Program Coordinator Geo-Environmental, ODOT.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
CEQA 101  CA Legislature passed CEQA in 1970; signed by Governor Reagan  CEQA statutes are found in Public Resources Code sections et seq.  The.
U.S. Department of Education Office of Special Education Programs Discipline.
Restoration and Regulation Discussion
Aggregate Advisory Board
Mountaintop Mining/Valley Fills in Appalachia
Restoration and Regulation Discussion
Flood Damage Prevention Code Update
Restoration and Regulation Discussion
FDA’s IDE Decisions and Communications
Coal Mining Activities
Mining and Reclamation Advisory Board
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Coal Mining Activities
Michigan Dept. of Environmental Quality Water Resources Division
Surface Mining Control and Reclamation Act of 1977 (Simon K)
Lake Erie HABs Workshop
Department of Environmental Quality
Prime Contractor Performance
Waters of the U.S. Updates and Changes
Public Lands Act Regulations Update
Exceptional and Natural Events Rulemaking
TRTR Briefing September 2013
Pipeline Planning and Construction: Environmental Considerations
EPA Region IV and ADEM NPDES Permit Coordination
Restoration and Regulation Discussion
High Rock Lake TMDL Development
Restoration and Regulation Discussion
Status of Exceptional Events Implementation Guidance
Initial Licensure Process, Survey Types & Licensure Action
Presentation transcript:

Division of Mining & Reclamation Thomas Clarke Director

New Regulatory Direction June 11, 2009 MOU EPA Army Corps of Engineers Interior Department

EPA & NPDES Permit Review AL Translators Rationale Pages Narrative Standard Permit Guidance Precipitation Induced Outlets Substantially Complete Outlets Aquatic Ecosystem Protection Plans (AEPPs) Permitting Efficiency Internal Training/Communication Training for Applicants

June 11 MOU - DOI Short Term Actions Clarify the Stream Buffer Zone Rule Re-Evaluate/Strengthen Oversight of State programs Take action to be able to correct defects in state-issued permits

June 11 MOU – Longer Term Actions Stream Buffer Zone Rulemaking AOC Rulemaking or Guidance

Actions Under the June 11 MOU November, 2009 – OSM announces More effective oversight initiatives Stream Protection Measures rulemaking

More Effective Oversight/Permit Defects 11/15/2010 Director’s Memo 11/16/2010 OK Informal Review Decision Finalized 1/31/2011 REG 8 REG 23 INE 35

INE 35 – Permit Defects Ten Day Notice Policy – 30 CFR 842.11 TDNs are issued where there is reason to believe a violation exists A Permit Defect is now considered to be a type of violation – can be any Procedural deficiency in a state-issued permit Substantive deficiency in a state-issued permit

INE 35 – Permit Defects Examples of permit defects include: Failure to follow procedural requirements Failure to make any required written finding Lack of information, tests, or plans required by the state program to support a finding or action taken Approval of designs, mining, or reclamation practices that are inconsistent with the state program Error in the analysis of technical or other information or plans

INE 35 – Permit Defects TDN Process Citizens’ complaint or other information gives OSM reason to believe a violation exists State responds within 10 days, unless extended If OSM judges State response to be inappropriate, OSM is to conduct a federal inspection A federal violation can be issued if a “violation” is found in the federal inspection

INE 35 – Permit Defects What previous practices are changed? A violation is something on the ground, performance standards, permit conditions, etc. Complaints to OSM are not another way to challenge a permit decision, instead of using State appeals processes OSM will take oversight of individual permit decisions, as opposed to broader programatic permitting issues

INE 35 – Permit Defects Potential Ramifications A problem in State permit files results in a federal violation for a mine operator, with direction to submit a permit revision as a remedial measure OSM is willing to use Part 733 program takeover process on an individual permit specific basis No more exclusive state regulatory jurisdiction “Concurrent” federal jurisdiction over permitting TDN process and federal second-guessing can be invoked at the same time as a State permit appeal

INE 35 – Permit Defects No Deadline for OSM to Invoke the TDN and 733 Processes After Permit Issuance OSM Could Use this in the Same Manner as EPA Uses the Section 404(c) Veto For CWA Section 404 Permits Does OSM have its Eyes on the Spruce Surface Mining Permit? After OSM Finishes the New Stream Protection Rule, Will Every Permit Have “Defects” to be Remedied Through TDNs and Part 733?

Stream Protection Process - EIS No opportunity to comment – Ch. 1 Limited time to comment Ch. 2 – 4 Comments not heeded Quality criticized by all State cooperating agencies disenchanted Draft rules have already been written Preferred alternative causes severe impacts in Appalachia, may be contrary to SMCRA

Stream Protection Concepts Material Damage A federal definition Will include biological aspects Quantification methods to be used for MD/CHIA assessments Corrective action thresholds to identify trends and require action before MD reached Codification of OSM AMD Policy

Stream Protection Concepts Mining Through Streams Demonstration that mining through streams can not be avoided Restoration of both form and function Bonding of stream restoration projects Sequencing of mine throughs - form/function must be restored before next mine through occurs Public comment re-opened if restoration fails and operator desires to continue

Stream Protection Concepts Stream Buffer Zone Mining prohibited within 100 ft of streams unless applicant demonstrates activity will not preclude stream use and cause MD Fill placement: Comparable to 2008 Rule Enhancement measures for fish/wildlife habitat Minor structures exempted (culverts, crossings, etc)

Stream Protection Concepts Prohibition of any activity that would Alter the character of a stream with a biological community by dewatering it Cause adverse impacts to the stream’s biological community Operators must ensure base flow and recharge capacity to keep perennial segments perennial and intermittent segments intermittent

Stream Protection Concepts Definition of AOC +/- 15% of pre-mining elevation Digital terrain model of pre-mining landforms Documentation

Stream Protection Concepts Excess Spoil - Fill minimization plans to include iterative calculations max volume returned to mined area min volume in fill raise backfill above original elevation while maintaining stability safety factors buried stream length minimized No change in peak flow demonstration (SWROA)

Stream Protection Concepts Excess Spoil Construction in compacted lifts; i.e. durable rock fills eliminated Flat decks no longer allowed Use BTCAs to keep water out of fill and out of ponds Construction of aquatards within fill or backfill

Stream Protection Concepts Reforestation If forest is pre-mining land use, 80% must be a forestry-related postmining land use Incorporate principles of FRA Excess Spoil Fills will be forested Salvage and redistribute duff, other organic litter, and vegetative material