DAQ Architecture Design of Daya Bay Reactor Neutrino Experiment

Slides:



Advertisements
Similar presentations
Sander Klous on behalf of the ATLAS Collaboration Real-Time May /5/20101.
Advertisements

Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
2 July 2003Paul Dauncey - DAQ1 Progress on CALICE DAQ Paul Dauncey Imperial College London, UK.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
Trigger-less and reconfigurable data acquisition system for J-PET
E. Pasqualucci Software needed (H8) DAQ-1 –BE installed ROD emulator Beam crate readout process Crate controller and message system –Inherited by tile-cal.
Large Scale and Performance Tests of the ATLAS Online Software CERN ATLAS TDAQ Online Software System D.Burckhart-Chromek, I.Alexandrov, A.Amorim, E.Badescu,
2/10/2000 CHEP2000 Padova Italy The BaBar Online Databases George Zioulas SLAC For the BaBar Computing Group.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
1 Alice DAQ Configuration DB
Independent front-end read out subsystems for 17 detectors in three underground sites. All electronics modules of each subsystem are reside in one VME.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
Designing a Scalable Enterprise Project Management Architecture Ken Toole Platform Test Manager MS Project Microsoft Corporation.
Control in ATLAS TDAQ Dietrich Liko on behalf of the ATLAS TDAQ Group.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
The Readout Electronics for Upgrading of BESIII End-capTOF Chunyan Yin University of Science and Technology of China University of Science and Technology.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Databases in CMS Conditions DB workshop 8 th /9 th December 2003 Frank Glege.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
News on GEM Readout with the SRS, DATE & AMORE
,,,,, The Daya Bay Reactor Neutrino Experiment Liangjian Wen On behalf of the Daya Bay Collaboration Institute of High Energy Physics Daya Bay Detectors.
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
The Daya Bay Reactor Neutrino Experiment R. D. McKeown Caltech On Behalf of the Daya Bay Collaboration CIPANP 2009.
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
CDMS Computing Project Don Holmgren Other FNAL project members (all PPD): Project Manager: Dan Bauer Electronics: Mike Crisler Analysis: Erik Ramberg Engineering:
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
Daya Bay Reactor Neutrino Experiment On behalf of the DayaBay collaboration Virginia Polytechnic Institute and State University Joseph ykHor YuenKeung,
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
New DAQ at H8 Speranza Falciano INFN Rome H8 Workshop 2-3 April 2001.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
Monitoring for the ALICE O 2 Project 11 February 2016.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Cofax Scalability Document Version Scaling Cofax in General The scalability of Cofax is directly related to the system software, hardware and network.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
TDAQ status and plans for 2008 Carlos Solans TileCal Valencia meeting 17th December 2007.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
IHEP Computing Center Site Report Shi, Jingyan Computing Center, IHEP.
Microsoft dynamics Axapta training institute Contact US: Magnific training
Slow Control and Run Initialization Byte-wise Environment
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Slow Control and Run Initialization Byte-wise Environment
Business System Development
INSIDE in-beam PET system assembly and test at INFN Torino
PC Farms & Central Data Recording
SLC5 VME ROD based test system for Pixel DAQ: Outlook for Spring 2014
DAQ for ATLAS SCT macro-assembly
Controlling a large CPU farm using industrial tools
The Software Framework available at the ATLAS ROD Crate
Online Software Status
Large CMS GEM with APV & SRS electronics
TDAQ commissioning and status Stephen Hillier, on behalf of TDAQ
John Harvey CERN EP/LBC July 24, 2001
System Management in a Windows based Control Environment
Mini Tower Preliminary Results
The Performance and Scalability of the back-end DAQ sub-system
Presentation transcript:

DAQ Architecture Design of Daya Bay Reactor Neutrino Experiment Lu Xiaoxu 2017 07 25

Background The Daya Bay Reactor Neutrino Experiment is a neutrino-oscillation experiment designed to measure the mixing angle θ13 using anti- neutrinos produced by the reactors of the Daya Bay Nuclear Power Plan and the Ling Ao NPP in Shenzhen, China. Default configuration of the Daya Bay Experiment

Requirements Run Control: configurable and flexible Run Mode: 6 modes---physics, electronics diagnosis, pedestal, AD calibration, water shield calibration, mineral oil monitoring Data Readout and Processing: suitable for different types of hardware, provide online processing and analyzing Throughput Requirements: up to 35 Mbytes/s for a total experimental hall throughput Other Common Requirements: hardware, electronic layout and software setup configurable; GUI; bookkeeping; good stability and robustness

Hardware Design All computers except a local control PC are placed in the surface computer room for more convenient management and maintenance.

Software Design Interaction diagram of online component For Software Design: The software is designed and developed based on the ATLAS TDAQ software and BESIII DAQ software. The data flow software is responsible for all the processing of physics data, including receiving and transporting the data to storage. The online software is responsible for all aspects of experimental and DAQ operations and controls during data-taking. For interaction diagram of online component: The Control makes use of the Information Sharing and of the Databases packages. Interaction diagram of online component

Software Design Data flow component diagram Deployment design diagram For Data Flow component diagram: Migrated from the ATLAS TDAQ backend data flow software and BESIII front readout software. For Deployment Design Diagram: Each ROS corresponds to a VME crate and the detector. The whole system is separated into three partitions for three experimental halls. Each partition includes all ROS of one hall, several EFDs and one SFO. Deployment design diagram

Conclusion Most servers and the surface network have been installed and are working well, and the first two ADS have been assembled. A 72-hour stability test with an approximate 1.5 kHz event rate and 2.3 kilobyte mean event size was successfully completed without any crashes. A DAQ software test for multiple VME crates is set up in laboratory. Based on the ATLAS TDAQ and BESIII DAQ, the architecture design of the Daya Bay DAQ was achieved. Preliminary test results show that the DAQ performed well and the architecture design meets current experimental requirements.

THANK YOU!