Middle Fork Project Project Description and Operations Maps

Slides:



Advertisements
Similar presentations
Middle Fork American River Project AQ 2 – Fish Population Technical Study Report Overview March 3, 2009.
Advertisements

Middle Fork Project AQ 6 – Fish Passage Technical Study February 3, 2009.
Placer County Water Agency Middle Fork American River Project AQ 11 – Water Quality Contingency Sampling Protocol (Contingency Study) February 3, 2009.
 1 Stormwater Management and Road Tunnel A “SMART” Solution Transportation Research Board Committee ADC60 Sustainable and Resilient Infrastructure Workshop.
Figure 1. Storage capacity of the Sierra Nevada snowpack in comparison to dams and reservoirs. Information from the California Department of Water Resouces.
Map Makeup Bellwork.
May Middle Fork Project Project Operations Overview May 2006 PCWA MAY 16, 2006 HANDOUT #4.
Feather River Drainage System Prepared for NERDS 2006 Pamela Cantrell, Ph.D.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Update on Proposed Project.
Vallecito Creek Drainage Area 1. Vallecito Creek Drainage Drainage Area - 96 sq. miles (61,440 acres) Length of Tributary Streams miles Residential.
1 Overview of South Yuba River Hydrology Bob Center Presented to FERC Academy on December 10, 2005.
Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting July 21, 2008.
Green River Topographic Map Activity
WUP: TOC = “Objective – Day 3”
June 26, PCWA - Middle Fork Project Project Operations
Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
July Middle Fork Project Additional Information Potential Project Betterments to be evaluated during Relicensing July 2006.
June 2006 Middle Fork Project Project Maintenance June 20, 2006.
Terrestrial Resources Working Group June 3, 2008.
S IERRA F OOTHILL C ONSERVANCY Yosemite-Mariposa IRWM Projects Kristen Boysen Conservation Project Manager.
Middle Fork Project AQ 12 - Attachment A California Red-legged Frog Site Assessment March 10, 2008.
Middle Fork Project Flow and Temperature Modeling (Status Report) November 4, 2008.
Stockholm Environment Institute Natural Heritage Institute CABY Watershed Modeling with WEAP CABY Planning Meeting May David Purkey and David Yates.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Smart grid in the Pacific Northwest – best practices from the largest demo project in.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting May 29, 2008.
Hydrology of the Snake River in Hells Canyon Wil Sarchet GIS in Water Resources.
Middle Fork Project Project Description April 25, 2006.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting April 8, 2008.
Shoshone-Paiute Tribes of the Duck Valley Indian Reservation Fish Stocking and Operations/Maintenance Project
Middle Fork Project Potential Project Betterments October 1, 2007.
Water Quality Control Commission June 8/9, In 2009, the Commission adopted a temporary modification for Segment 15 based on Water Effects Ratio.
La Grange Reservoir Turlock Lake Eastside Reservoir or Optional Canal West Satellite Reservoir Cattle Reservoir Turlock Lake South Pump Station Northwest.
I RRIGATION P ARKS H YDROELECTRIC E LECTRIC D RAINAGE.
Placer County Water Agency Middle Fork American River Project Plenary Meeting June 1, 2009 Handout #2.
Spokane River Basin Monitoring. Spokane Basin Monitoring.
PCWA MFP Operations Model All Models are Wrong But Some Models are Useful.
Middle Fork Project TERR 6 - Special-Status Bat Technical Study Plan Report Overview March 3, 2008.
Agenda 9:00 AM - 12:00 PM 12:00 PM Introductions
Water Supply Conditions February 28, 2014 Indian Valley & Sierra Valley.
Middle Fork Project AQ 3 – Macroinvertebrate and Aquatic Mollusk Technical Study Report Overview May 5, 2008.
What are topographic maps? 2-D map that uses contour lines to represent 3-D elevation Overhead view of elevation (as if we were flying over the landform.
Middle Fork Project AQ 11 – Water Quality Contingency Sampling Protocol (Contingency Study) September 8, 2008.
1 Placer County Water Agency Middle Fork American River Project Terrestrial Working Group November 6, 2007 TERR 1: Vegetation Communities and Wildlife.
River Systems and Watersheds. Rivers and Streams River systems are made up of tributaries of smaller streams that join along their course. Rivers and.
Middle Fork American River Project Recreation Resources Technical Working Group Meeting October 5, 2009.
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 2, 2009 Handout #5.
Green River Topographic Map Activity. 1.What is the contour interval?
Revision presentation. The drainage basin 1.the edge of highland surrounding a river. 2.An area from which all precipitation flows to a single stream.
Hydro Energy.
Warm Up 52 1) Describe some of the features you see on this map.
ISSUES RELATED TO THE FEDERAL RENEWABLE GOAL
Middle Fork Project AQ 11 – Water Quality Technical Study Plan Report Overview March 10, 2008.
Middle Fork Project Overview of 2008 Technical Study Plan Implementation April 21, 2008.
Middle Fork Project Entrainment Direct Sampling Approach (Contingency Study) September 8, 2008.
Upper Snake Reservoir Operations October 13, 2015
Green River Topographic Map Activity
Hire Toyota Innova in Delhi for Outstation Tour
Worksheets for lesson 10.
Alex Chan, rukundo gahigiro, ning zhang
Drought in Upper Colorado Basin
Gradient The land surrounding the river channel. Valley The middle section of the river. Upper Course The steepness of the river. Mid Course The part of.
River Systems and Watersheds
of the Colorado River Storage Project
Susitna Watana Hydroelectric Project
Tami Thompson - MBK Engineers
Middle Fork Project TERR 3 – Noxious Weed Technical Study Report Overview February 17, 2009.
Sacramento Municipal Utility District
Presentation transcript:

Middle Fork Project Project Description and Operations Maps June 2006 June 2006

MF Project Facilities June 2006

Middle Fork Project Profile Upper Diversion & Storage Facilities: Duncan Creek Diversion French Meadows & Hell Hole Reservoirs North & South Long Canyon Creek June 2006

Middle Fork Project Profile Conveyance and Generation Facilities June 2006

MF Project Facilities June 2006

Water Flow and Generation Pathway Middle Fork Project French Meadows Reservoir Duncan Diversion French Meadows pwrhse 400 cfs - 15 MW Middle Fork N, S Long Cyn Creek Hell Hole Reservoir Duncan Creek Hell Hole pwrhse 20 cfs - 1 MW Interbay Reservoir MF powerhouse 850 cfs - 122 MW Ralston powerhouse 920 cfs - 80 MW Rubicon River Afterbay Reservoir Oxbow powerhouse 1050 cfs - 6 MW Middle Fork June 2006