A.Kulikov SLAC MAC review October 2003

Slides:



Advertisements
Similar presentations
Recent observations of collective effects at KEKB H. Fukuma, J. W. Flanagan, S. Hiramatsu, T. Ieiri, H. Ikeda, T. Kawamoto, T. Mitsuhashi, M. Tobiyama,
Advertisements

RedOffice.com Presentation templates Slide No. 1 RFA Detector Data of Electron Cloud Build-up and Simulations Eric Wilkinson Mentor: Jim Crittenden Cornell.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
Electron Cloud Mitigation Studies at CesrTA Joseph Calvey 10/1/2009.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Electron cloud in Final Doublet IRENG07) ILC Interaction Region Engineering Design Workshop (IRENG07) September 17-21, 2007, SLAC Lanfa Wang.
AEC09, CERN Mauro Pivi, SLAC TiN chambers and SEY measurements in PEP-II M. Pivi J. Ng, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper, C. Spencer, B.
Electron cloud measurement in Cu/Al chambers with/without TiN coating at KEKB positron ring ILC DR Working Group Meeting Kyo Shibata (KEK)
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
2007/03/1-2 ECL2, CERN 1 SEY and Clearing Studies at KEKB Contents Contents Introduction Studies Beam duct with Ante-chambers Coatings with Low SEY Clearing.
Jan 2016 Solar Lunar Data.
Cui Xiaohao, Zhang Chuang,Bian Tianjian January 12,2016
Beam-beam limits: MD proposal
ILCDR08 10 July 2008 Plan of measuring cloud density in the solenoid field and in the quadrupole field K. Kanazawa (KEK)
First Look at Nonlinear Dynamics in the Electron Collider Ring
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
Q1 Jan Feb Mar ENTER TEXT HERE Notes

Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
2018 Flag Calendar Online Registration is open
Status and Plan for the PEP-II Lattices

CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
PEP-II Status and Plans e+e- Factories Workshop
Laboratory Directed Research and Development (LDRD) Proposal
Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16

Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
2018 Flag Calendar Online Registration is open
CesrTA Experimental Schedule and Priorities
Jan Sun Mon Tue Wed Thu Fri Sat
Electron cloud studies at CESR
Accelerator R&D Results from the B-factory
Electricity Cost and Use – FY 2016 and FY 2017

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com
Super-B Accelerator Overview

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
JLEIC Collider Rings’ Geometry Options (II)
Current Status of Ion Polarization Studies
Presentation transcript:

A.Kulikov SLAC MAC review October 2003 Electron Cloud Issues A.Kulikov SLAC MAC review October 2003

Electron multipacting in the LER straight sections. Feb. 2000 50 nTorr @ 1 A Feb. 2000 25 nTorr @ 1.1A Current, mA Current, mA Oct. 2003 5.5 nTorr @ 1.5 A Oct. 2003 1.2nTorr @ 1.5 A Current, mA Current, mA

Electrons in the HER. All HER holding vac. pumps HER distributed ion pumps

Electrons in the LER arcs VP4031 09_29_03 Elec4031 09-29-03 VP4031 (6-8)-Jul-01 Solenoid OFF VP4031 15-Aug-01 Solenoid ON 14-Aug-01

Electron multipacting and luminosity July 2000 29 sections ON 2-May-2000 Before 17:00: 10 sections of solenoids ON (Str. 12) After 18:15: 23 sections ON (Str. 12, Str. 4, Str. 8) The last section in the straights was energized 16-Mar-01 (54 total) Solenoids in the LER arcs: the first - 23-Apr-01, the last - 9-Feb-02

Positron beam sizes driven by the electron cloud effect 31-Jul-2000

Str. 12 solenoids effect on the beam sizes Str.12 solenoids effect on the beam sizes. All other solenoids in the ring are ON, single ring. Lifetime Horizontal beam size Vertical beam size ON OFF 1.46 A 450 mA 28-Aug-01

Solenoids Arc-3 effect on the beam sizes Solenoids Arc-3 effect on the beam sizes. All other solenoids are ON, single beam. Lifetime Horizontal beam size Vertical beam size 1.5 A ON OFF 0.5 A 28-Aug-01

Solenoid field scan (Bmax = 30Gauss) 4” round SS chamber, colliding beams Bunch pattern - by 3 LER current - (1.45 - 1.25) A Number of bunches - 1078

Summer 2003 improvements: Additional 50 Gauss solenoids for all straight sections drift chambers. Double the field at pumping T-s, transitions and small drift chambers for all LER straight sections. Additional solenoids for “no sexstupole” girders in all LER arcs.

50 Gauss solenoid section

Pumping T

Double the field at the pumping T-s

“No sextupole” chamber