5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Advertisements

RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Wednesday 5 th December until this morning 06:59 Stable beams fill #3375, L ~ 6.8e33 cm-2s-1. 10:40 Beam dump, trip of RD2.R5. Integrated L 72 pb-1 in.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday 3rd October - morning
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Machine Coordinators: G. Arduini, J. Wenninger
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Week 32 Started with luminosity production…
LHC Morning Meeting - G. Arduini
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Coordination: Gianluigi Arduini & Jan Uythoven
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
LHC Morning Meeting - G. Arduini
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Scrubbing progress - 10/12/2012
LHC Morning Meeting - G. Arduini
Friday 31st August & night
LHC Morning Meeting - G. Arduini
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Chromaticity can make a difference…
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
LHC Morning Meeting - G. Arduini
Wednesday 03/11 – The Plan Finish electron-cloud program:
LHC Morning Meeting - G. Arduini
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Wednesday 10/5 Cryo recovery until 18:30
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
LHC Morning Meeting - G. Arduini
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Saturday 3rd November - morning
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
LHC Morning Meeting - G. Arduini
Thursday – Morning Energy matching at injection with H CODs
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday :42 stable beams fill 3541
LHC - Week 38 Technical stop: Katy Foraz
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Tuesday Access…. QPS intervention at 09:00 in point 8 (quench heater exchange) QPS installation oscillo for the ISRM measurement EPC intervention in point.
Wednesday 26 October 2011.
Saturday 6th October 05:38 STABLE BEAMS # :06 OP dump
Wednesday morning Waiting for PS – problem on RF cavity.
Friday :47 stable beams fill 3273
Saturday 26 November 2011.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

LHC Morning Meeting - G. Arduini Thursday 4/10 08:27 Problem with PLC controlling 4.5 K cryogenics cold box in point 4 (US45). Lost sector 34 and RF. Access for: installation of additional solenoids in point 8 close to MKI8 CMS Abort gap monitor (BSRA-B1). Photomultiplier replaced. Fast aging not understood BRAN in point 8 CV checks in point 4 and 8 EL in point 6 (UPS replacement) RF (instrumentation checks) Confirmed that temperature measurement of current lead RCBXV2.R2 (400 K) measured on Tuesday 2/10 evening was spurious. Intervention by cryo yesterday did not reveal any problem. In the shadow some tests in preparation of MD3 17:45 cryo OK 19/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Thursday 4/10 18:45 Pre-cycle after resetting the sectors (trips of RQ6 in sector 21/34/67/78 due to a bad manipulation) 19:50 Injection. Steering of TI2 required. Increased Q’V at the end of the squeeze for B1 to try and suppress the instabilities at the end of the squeeze observed for several fills. 22:15 STABLE BEAMS#3130. Initial luminosity ~7.2x1033 cm-2s-1 22:35 Vacuum valves in undefined position in IR7 (B1). Beam dump. End of fill 3130 after 20 mins (~6 pb-1) 23:49-00:42 Access in point 7 for vacuum piquet. Replaced faulty power supply for valve control crate. 02:51 STABLE BEAMS#3131 Initial luminosity 6.5x1033 cm-2s-1 06:19 UFO in sector 23 (BLMQI.31L3.B1I10_MQ) at 138% of dump threshold End of fill #3131. 67 pb-1 in 4.5 h 08:16 Sector 81 trip RQ8.L1 (QPS) 19/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Vacuum (Fill 3130) J. Uythoven VGPB.192.5R8.R VGPB192.5R8.B Additional windings for the anti e-cloud solenoids added at MKI 8 between interconnect and tank. No significant difference observed 19/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Vacuum (Fill 3128) J. Uythoven VGPB.192.5R8.R (interconnect to Q5) VGPB158.5R8.C (MKID tank) Pressure rise stating after 7th injection (B2). 19/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Chromaticity b* BBQ-VB2 RSD1 [A] Sep-bump [A] 3128 3130 3131 19/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini #3130 After optimization ALICE at 4.25x1030 cm-2s-1 “Tuning” of the longitudinal blow-up in the PS to enhance satellites (S. Hancock) 19/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Pending EOF: Bunch length variation Operational Development Gated tune measurement with reduced damper gain on first 6 bunches Damper test at injection of the increased bandwidth with 50 ns beam Batch by batch blow-up (postponed to after MD3) TOTEM IN during Stable beams 19/11/2018 LHC Morning Meeting - G. Arduini