Ensuring Fire Compliance An Action Plan Clive Reilly Checkmate Fire Solutions.

Slides:



Advertisements
Similar presentations
Passive Fire Protection Presentation
Advertisements

Loft Conversions - The building regulations Chris Wigley MD London Building Control Ltd
Annual Fire Door Inspection
Inspection & maintenance of fire doors – a credible action plan Presented by Clive Reilly Checkmate Fire Solutions Ltd.
Installing Doors & Frames Ref: Handout / Text M. S. Martin Sept
NGfL CYMRU GCaD FLOOR COVERINGS.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
Part of the BRE Trust Protecting People, Property and the Planet What have fire doors ever done for us? Ian Stewart Certification scheme manager June 2014.
Julian Vollans – The Noberne Group September 20 th 2012 DOORSETS + 3 RD PARTY ACCREDITATION = THE SAFE SOLUTION.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
Passive Fire Protection SEMINAR INTRODUCTION & OVERVIEW.
© Stroma Development Ltd 2013 | Version 1.1 Stroma – insulation Insulation Wall insulation Cavity wall insulation / Solid wall insulation Roof insulation.
Cooling Business Group 1 INSTALLATION Directions.
Concrete Pre Cast Panel By Peter Spence ID:
Unit 204: Common plumbing processes
FCIA EFC Maintenance Maintenance of Effective Compartmentation - Scott Rankin, Pyro- Stop, LLC FCIA 2004 Past President - Bill McHugh, FCIA Executive Director.
Residential Fire Sprinklers Building Codes Plan PreparationPlan Preparation The sprinkler contractor should be required to submit a set of complete, detailed.
SHE Code 4: Safety and Safe Use of Work Equipment
Presented by Edgar Furtado & David Vella FIREPLACE & FLUE REPLACEMENTS 1359 WHITE OAKS BLVD., OAKVILLE.
Rev: Section 1 Overview of Fall Protection.
Julian Vollans DipFD – Noberne Doors Ltd 26 th March 2013 FIRE DOORSETS & 3 RD PARTY ACCREDITATION.
Regulation 16B As referenced in Approved Document B 2006.
Part of the BRE Trust Protecting People, Property and the Planet ‘LPCB Red Book Listed Products and Passive Installer Schemes Answering the needs of the.
Residential Construction Residential Doors *Source: (1) Carpentry & Building Construction Feirer & Freirer.
Risk Assessment – An Essential Standard
RADIATION PROTECTION IN DIAGNOSTIC AND INTERVENTIONAL RADIOLOGY
Inspire Risk Management Limited Apartment Block Complexes “the associated issues and there links to insurance” Presented to Paul.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Software Quality Assurance Activities
International Fire Door Inspector Association Presents New Annual Fire Door Inspections NFPA 80 – 2007, 2010, 2013 Standard for Fire Doors and Other Opening.
Improving smoke control and protecting lives Air Sealing Industrial, Commercial, Institutional and Multi-Family Buildings to Improve Smoke Control.
Safe Operation of Storage Tanks: Decommissioning and Repair
New Intruder Alarm Standards An insurance view of the future A presentation for ASC by Barry Faiers Principal Security Surveyor, Allianz Cornhill Insurance.
Planning, Prevention and Maintenance: Passive Fire Protection and Evacuation Presented by - Peter Barker.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Cladding attachment.
Neil Cooper Fire Safety Residential Implementing the Changes.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Course of Study 5. Maintenance Management Assessing Maintenance Needs
Title The Future of Fire Risk Management Practical Fire Risk Assessment & the Future.
Personal Safety System 1. Do we have to have this equipment issued by Sept to be compliant with the new law ? The effective date of the law is.
Passive Fire Protection SEMINAR SUMMARY. Assess property protection needs.
Passive Fire Protection SEMINAR Summary Presented by Alan Oliver Checkmate Fire Solutions Ltd.
CCP Track Safety Update Geneva * STRC amendments *Developments with APDs *Track Inspections.
Certificate number: FS453/02 Application FS21 Firestop Panel is used to firestop mechanical and electrical services where they pass through fire rated.
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
Firefighter Emergency Escape Systems New York State Department of Labor Public Employee Safety and Health (PESH)
Outcome 4 (part 4) Install and test above ground systems Unit 209: Drainage systems.
Day 4 Part 2 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Fire Door Constructions. About Noberne Doors Ltd o John Wilson – Sales Manager for Noberne Doors Ltd o Noberne Doors Ltd –Manufacture bespoke High Performance.
New Energy Centre at Megawatt Park 15 April 2014.
Loft Conversions Bringing you the latest in sprayfoam insulation technology.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
VIEW SERIES with Sliding Door
Installation Walkthrough Image Guide
Fire Safety update Mike Kay, CEO &
Barrier Management Symposium
Title slide for use with Buildings work stream
Board Replacement for Floating Floors
Apartment Owners Network Fire Safety in Existing Apartment Blocks
FCC lifts Layout, characteristics etc.
GCSE Construction & The Built Environment
Temporary Works Co-ordination
Fire Door Inspections Qualified Training
Toolbox talk on fire risk assessment by Marc Cork
Emergency Lighting Design, Inspection and Maintenance Requirements
FIRE UPGRADES OF EXISTING BUILDINGS
British Woodworking Federation
Program Proposal to ITGC
Presentation transcript:

Ensuring Fire Compliance An Action Plan Clive Reilly Checkmate Fire Solutions

An Important Question Why are new buildings not always fire compliant?

Case Study

Fire Strategy The fire strategy addresses life safety under the Building Regulations, and the Regulatory Reform (Fire Safety) Order, but not fire risk assessments, which are the client's responsibility. It does not specifically address either property protection, or business disruption. Building insurers should be consulted over the proposals since their preferences are sometimes more onerous.

Ground Floor Kitchen Area

Lifts 1 st Floor 3 rd Floor

Fire Walls

Raised Floor Barriers

Ducts, Dampers, M&E

Protection of Structural Steel

The installation of a fire door is a complex procedure requiring a detailed understanding of the important role played by each component & therefore needs to be undertaken by someone with the correct training. (BWF-CERTIFIRE) Fire Doors Norman Macdonald, BRE Principal Consultant, checking upgraded fire doors at Ormskirk Hospital It is estimated by BWF Certifire that more than 80% of installed one hour fire doors will in reality not provide one hour fire rating

Door Gaps LocationDimension Door edge gapsRepresentative of those tested but as a guideline, a minimum of 2mm and a maximum of 4mm Alignment tolerances Leaves must not be proud of each other or from the door frame by more than 1mm Threshold10mm between bottom of leaf and top of floor covering

Fire Doors - Gaps

Hinge Intumescents ElementDimensions (mm)Location Bracket 40 x 35 x 25 with 3 mounting holes for minimum 25mm long steel screws 1 No per leaf in frame head – 100mm from closing edge Intumescent protection Leaf Edge Seals 2 No 15 x 4 Lorient Palusol 100P or Type 617 Fitted 5mm either side of the centre line of the leaf hanging edges and head Hinge Blades 1mm thick Interdens Under both blades Lipping 6 – 18 thick Hardwood min density 640 kg/m 3 All leaf edges

Fire Doors – Hinge Intumescents

Fire Doors – Protecting for the life of the building Pictures courtesy of Intastop Ltd

Ensuring Fire Compliance What can be done to ensure that fire compliance is built in?

Specification Talk to the experts. Be clear on what is required. Specify exactly what is required and issue as a part of the Tender process.

Ensure products are correctly installed

Select the right contractor

Permit to Work Specific to fire compartmentation. Provides a record of works. Informs the contractor of your requirements. Prompts an inspection of finished works before payment is made.

Ensure what is specified is installed PU foams tested as linear gap seals cannot be used to seal pipe or cable penetrations unless they have been tested in that end-use application Association for Specialist Fire Protection

Inspect the finished works

... on-site inspection & compliant handover

Quality Assurance CONFORMITY:We confirm that the products identified within the project specification have been installed in accordance with the manufacturers recommendations.

doing it the right way, first time around, will always be the most cost-effective course of action. (ASFP Red Book) Checkmate - providing practical fire & smoke containment solutions