Cherrill Spencer, SLAC Member of ATF2 Magnet Team

Slides:



Advertisements
Similar presentations
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
Advertisements

IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
FD support status N.Geffroy, G.Gaillard, B.Bolzon, A.Jeremie (and discussion with T.Kume)
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
ATF2 Magnets ATF2 Magnets 21 Mar 2007Cherrill Spencer, SLAC. Progress & Plans: ATF2 Magnets 1 Progress Report & Future Plans for the ATF2 FD Quads, FF&FD.
Supports and Movers for ATF2 Magnets R. Sugahara KEK France and Japan Collaboration Meeting Feb , 2006.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
Options for Final Focusing Quadrupoles Michele Modena CERN TE-MSC Many thanks for the contributions of: J. Garcia Perez, H. Gerwig, C. Lopez, C. Petrone,
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
F James T Volk June Permanent Magnets for Linear Colliders James T Volk Fermilab.
BPM support and beam pipe length FD support status A.Jeremie.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
rd ATF2 project meeting Permanent Magnet Updates Y. Iwashita, M. Ichikawa, Y. Tajima, M.Kumada, C.M. Spencer Kyoto University, NIRS, SLAC Contents:
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
ATF2 Magnets Results of the Field Measurements of three ATF2 DEA Dipoles by Single Stretched Wire and Hall Probe at IHEP over past 2 months: updated report.
ATF2 Magnets ATF2 Magnets 7 Oct 08,ATF2 weekly meeting Cherrill Spencer Report ATF2 FD Quads: Mech Msts 1 Report on the mechanical measurements of ATF2.
CLIC Permanent Magnet Quadrupole Engineering Development of second family member Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 07/11/2012.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
19 Dec 2007Water manifolds for FD magnets 1 Installation Questions abut the cooling water manifolds for the FD quads& sextupoles. Questions for Araki,
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
ATF2Quad Fab & Measurement Status Cherrill Spencer 01/31/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads By Cherrill Spencer, SLAC,
ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 1 Information on Alignment Issues for ATF2 magnets: for.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Meeting December Andrea JEREMIE1 France/ATF2 kick-off meeting in Annecy October participants from 3 regions! LAPP/Annecy in.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
New Magnet Design for FCC- ee Attilio Milanese, CERN 26 Oct presented by Frank Zimmermann.
Alignment and stability session
S-BPM Support Issues to be discussed with LAPP and KNU
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Summary FD Support System
Idea for the low field dipoles near to IP in 2mrad crossing
Expected hardware status and Priority of the commissioning task
High Gradient Magnet Design for SPring-8 Upgrade Plan
Procurement, Measurement and Installation of 2 Octupoles for ATF
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
Laboratories in Annecy working on Vibration Stabilization
ATF2: final doublet support
Arc magnet designs Attilio Milanese 13 Oct. 2016
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
CHEN, Fusan KANG, Wen November 5, 2017
Y. Iwashita, T. Mihara, S.Nakamura,
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy
Y. Iwashita, T. Mihara, S.Nakamura,
Brief Status Report on Fabrication of ATF2 Quads
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
IP configuration session
Fusan Chen, Wen Kang, Mei Yang*
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Presentation transcript:

Cherrill Spencer, SLAC Member of ATF2 Magnet Team Summary of “Magnet, Mover & Alignment” Session and IP Layout Session at 3rd ATF2 Project Meeting, 19th December 2006 at KEK Original talks can be read at http://ilcagenda.cern.ch/conferenceDisplay.py?confId=1295 Cherrill Spencer, SLAC Member of ATF2 Magnet Team BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Summary of “Magnet, Mover & Alignment” Session, 19 Dec 06 Five speakers dealing with new ATF2 magnet production; measurements of new ATF2 quadrupoles; design of ATF2 magnet supports; compatibility of path of laser light from laser wire system with various ATF2 magnets new adjustable permanent magnet that could be tested in the ATF2 beam line BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Lawrence Deacon (Royal Holloway) Compatibility of path of laser light from laser wire system with ATF2 magnets Lawrence Deacon (Royal Holloway) Question is: where is best to put the detector that detects the laser wire system laser photons? Depends on which style of detector is chosen; size of detector; how much interference with nearby magnets-do they have to be modified? Two “best” locations: Before QD6 and after BH5 After QD6 and before QF5 BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Compatibility of path of laser light with ATF2 magnets, page 2/3 Placing detector before QD6 has several disadvantages. Placing detector after QD6 – have to put a beampipe for the laser photons in a gap between two QD6 poletips. Depending on outer diameter (OD) of this pipe we might have to shorten the thickness of some bolts to left of pipe. What happens to signal if OD is restricted to 20mm ? Green circles show laser beam positions as enters and leaves QD6, if detector placed after QD6. BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Compatibility of path of laser light with ATF2 magnets, page 3/3 Using a simulated Compton scattered photon spectrum, Deacon modelled the laser wire signal at a detector in 2 different positions. Found that the difference in signal between the 2 locations is not great, after QD6 has some advantages New QEA quads being made- some could have smaller bolt heads used, so could better accommodate the laser beampipe Deacon will continue to work on this BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Proposed Design of Supports that go under ATF2 magnets, pg 1/5 Ryuhei Sugahara (KEK) designing magnet support system that sits on floor and has several components: concrete block, position adjuster; magnet movers or other supporting devices Have 27 quads, 3 dipoles and 3 sextupoles needing this support system. Quads and sextupoles have old FFTB movers under them, some modification needed to make movers work with ATF2 beam line parameters BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Not scaled ! PROPOSED ATF2 MAGNET SUPPORT SYSTEM, by Sugahara (KEK) 24 were made last year 3+1 have been ordered 27 have been ordered 24 out of 29 arrived at KEK 190 as grout 24 will be ordered soon PROPOSED ATF2 MAGNET SUPPORT SYSTEM, by Sugahara (KEK) 610 BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout drawing P3

FFTB Mover-needs to be modified for ATF2 29mm thick steel plate FFTB Mover-needs to be modified for ATF2 Need permission of SLAC group to make 16mm dia. holes at the center of the T-plate New system of plates that go between mover shafts and magnet T-plate (not scaled) This end of screw-bolt will be free to move +/- 2mm in x,y,z BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout P12

Y. Iwashita, M. Ichikawa, Y. Tajima, M.Kumada, C.M. Spencer New adjustable permanent magnet that could be tested in the ATF2. pg 1/5 Y. Iwashita, M. Ichikawa, Y. Tajima, M.Kumada, C.M. Spencer From Kyoto University, NIRS, SLAC, been working on adjustable permanent magnets for about 4 years. Two adjustable prototypes been designed, fabricated and extensively measured at SLAC and Kyoto University Various possibilities for use at the ILC BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Adjustable Permanent Magnet Quadrupole (NEOMAX38AH) BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Gradient is high at ON region. SWL = 4cm SWL = 8cm Gradient is high at ON region. Magnet gaps of the inner ring affects the distribution. BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Octupole components tolerable? Side by Side Quad- for use in ILC where incoming and outgoing beams are very close. Beams into/out of page at red and blue circles Strength can be reduced by opening the gap. Both Defocussing 70T/m @ ø30mm Octupole components tolerable? BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Possible octupole PM design. Is a two-piece configuration so can be split and installed in beamline. Maybe could be used for the ILC tail-folding octupoles-with r=0.7cm BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Status report on magnetic field measurements of QEA-magnets, pg 1/8 Mika Masuzawa (KEK) been measuring 24 QEA quads that are in FF of ATF2. Compared KEK results with IHEP measurements New data since last report: skew sextupole component BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

# of magnets measured, pg 2/8 Magnets were divided into two groups, a high current group and a low current group. “High current” magnets were measured with a 150 A maximum standardization current and “low current” magnets were measured with a 50 A maximum standardization current. Magnets were delivered to KEK in two shipments: 1st batch (150 A max. current): 11 magnets 2nd batch (150 A max. current): 2 magnets 2nd batch (50 A max. current): 11 magnets Total of 24 magnets have been measured at KEK. QEA04 (150A) stays at IHEP as a reference magnet. BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Compare Measurement Systems, pg 3/8 IHEP Rotating coil with mechanical bearing Align the measurement coil using the magnet bore KEK Rotating coil with air bearing Align the measurement coil using the alignment plate, just the same way as we will do in the actual alignment. BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Comparison of magnet strength measurements between IHEP and KEK (2nd batch), pg 4/8 Better correlation IHEP measurement improved. BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Problems with magnet & alignment plate 3 cases observed pg 5/8 Correct case Alignment base center Split line between the cores bore center Must be aligned. Chen Wan, Sun Xianjing confirmed this with the alignment scope with us, with QEA08 magnet. (1) Magnet bore is not aligned. How could this happen?? EDM process??? (2) Alignment base is not aligned. (3) (1)&(2) mixed. BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Measurement comparison between IHEP and KEK for sextupole skew component: good agreement 5e-4 Phase information needed for calculating the skew component. Sextupole phase with respect to the quadrupole phase was used. BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Sextupole components (normal and skew) plotted against magnet # BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Summary by Masuzawa, pg 8/8 24 magnets were measured at both IHEP and KEK. KEK data will be used for generating the excitation curves, though the IHEP measurement improved for magnets in the 2nd batch. Large offset in the magnetic field with respect to the mechanical center was measured. Alignment people should use the field measurements result when aligning the magnets in the beam line. Sextupole components seem to be small enough, or at least one can select good magnets for critical places in the beam line. Trim coil data were taken. Be careful when connecting the trim coils to the power supply. Bad news: 6 magnets in the 2nd batch were taken away by the ATF group. We only have 24 - 6 = 18 magnets left. BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

3 new dipoles B1,B2,B5 to be made: all one style. New Magnets Being Made for the ATF2: STATUS by Cherrill Spencer (SLAC) pg 1/10 29 new FF and extraction line quads (“QEA”) been made by IHEP, Beijing and measured at KEK. Mika Masuzawa will report on measurements in this session 3 new dipoles B1,B2,B5 to be made: all one style. 5 new sextupoles are needed: 3 in the FF: SD4, SF5 and SF6 and 2 in the “final doublet” (FD) (interleaved with final 2 quads): SF1 and SD0 2 new FD quads : QF1 and QD0 NEW skew quads (heard about at dinner last night!) BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

New Magnets Being Made for the ATF2: Philosophy & Constraints In general we are taking steps to minimize the cost of the new magnets and to produce them in timely way (goal: all new magnets at KEK by end October 2007) Using existing magnets Using existing magnet movers Modifying existing magnet designs Constraints on magnet sizes, apertures, coil ends, operating currents & voltages, from: Fit in with existing movers Beam height from floor of 1.2 m Interface with 2 different styles of BPMs Fit in with new power supply’s current & voltage BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Design of ATF2 dipole: 3D figure Thermal switch; one water circuit Bases for alignment tools Magnet can be split for installation in the beam line & precisely re-assembled Power terminals oriented to receive power cables from floor Overall length 72.6 cm BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Status of ATF2 B1,B2, B5 dipoles Since last project meeting (May 2006) New design modelled in POISSON to achieve small enough sextupole content; reviewed Detailed drawing package generated; reviewed Manufacturing specifications for coils, core & magnet assembly written 3 potential USA magnet vendors identified Statement of work written; pre-purchase order paperwork done Request for bids went out on 2nd January 2007, deadline: 19th January 2007. BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

After several discussions decided to make bore aperture 50mm: Two old FFTB quads: 1.38Q17.72. are ready to have their poletips machined back to become QD0 & QF1 After several discussions decided to make bore aperture 50mm: quad bore diameter= 40 + 2x 3.5 + 2x 2 = 50 mm 3.5mm=Cu beampipe thickness; 1mm= free space have modelled in POISSON, see next slide for multipoles Solid steel core Water cooled coils, 24 turns of 0.255” sq hollow Cu conductor; 2 water circuits per coil. Predicted currents and voltages: QD0: 127.9 amps, 8.85 volts, ∆T= 1.77 degrees C QF1: 69.8 amps, 4.88 volts, ∆T= 0.53 degrees C STATUS: Identified machine shop with Electric Discharge Machine (EDM) that can machine back the poles (at LBNL), will send quads there in January 2007 BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Issue of fitting the 2 “FD” quads and 2 “FD” sextupoles on the “CLIC” table Was worked on in detail at a special meeting at LAPP in Annecy, France in October. A session this afternoon will deal with the IP configuration further. We concluded that all 4 magnets and their movers would fit on the CLIC table and the “QC3” mover assembly would have to be modified so that the center of the magnets’ bores would sit at 1.2 m off floor. CLIC table is 0.874m tall (same, special feet :on or off) BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Status of the 5 new ATF2 sextupoles Five new sextupoles are needed: 3 in the FF: SD4, SF5 and SF6 and 2 in the “final doublet” (interleaved with final 2 quads): SF1 and SD0. Considerations of available Z space and height of ATF2 beam lead us to make new and different designs for the FF and FD sextupoles. SF1 & SD0 constraints: will have (large) S-band BPMs attached to their core their bore should match the QD0/QF1 bore (= 50 mm) Cores can be somewhat longer than 90mm [am concerned about shortness of core relative to bore: fringe field effects] their cores need to fit in with sitting on a plate on top of an FFTB mover & must put center of bore at 1.2m from floor Current to be less than 50 amps, voltage less than 30 volts BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Status of the 5 new ATF2 sextupoles, continued: thoughts since meeting in red FF sextupoles: another new design needs to be made with these features: Bore to be same as adjacent QEA quads: 32 mm diameter (or maybe somewhat larger) Coil end shape to be compatible with a C-band BPM Core to be ~90mm long (OK with a 32 mm bore) Bottom of core to be flat, to sit directly on a “QMAG” mover T plate (or a flat-bottomed cradle will be designed). Distance between core bottom and bore center to be 295mm (or a spacer could be used to position center) Vertical distance between bottom of T plate (under a mover) and magnet bore center to be 541 mm. BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Idea for the FF and FD sextupoles Actual models will be developed in January 2007 and run in POISSON. Goal : all new magnets to be delivered to KEK by October 31st 2007. Proposed core shape- with flat bottom. Size would differ for the 2 styles Calculations indicate that coils can be designed to meet PS requirements and have desired integrated strengths. Proposed Core shape. Bore apertures: 50mm for SD0/SF1 32 mm for SD4,SF5,SF6 Since meeting: looking at re-using some SLC FF sextupoles. Issue: who decides who can take old SLC magnets, based on what criteria? BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Movement of old FFTB movers & outstanding issue Sending 24 less wide movers & their electronics and cables to KEK already Sending one wide mover and 3 less wide movers & their electronics and cables to LAPP (left on Jan 3rd) several month loan. Will eventually come to KEK. Need an adjustable stand under the dipoles- KEK wants SLAC to design and build, but who to pay? BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Summary of IP configuration session By Philip Bambade LAL-Orsay Covering talks by: T.Kume, R.Sugahara, B.Bolzon, A.Jérémie, D.Urner 3rd ATF2 project meeting KEK, 20 December 2006 BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

L = 4m Measure vertical coherency between two points 4m apart Measured ATF floor movement with 2 STS-2 seismometers: 0.008-50Hz Integrated Spectrum for L=0 Vertical Direction L = 4m Plot frequency at which good coherence was observed 10 Measure vertical coherency between two points 4m apart BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

CLIC TABLE BEHAVIOUR (Bolzon) BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

Proposal 1 for relative stability around IP: Rigid mount on floor using individual rigid mount for supporting interferometer and FD magnet Slide from Kume talk Confirm rigidity of interferometer body (Estimate effects of magnet originated vibration) Interferometer Final magnet (mount table) Interference fringes (Electron) beam Confirm rigidity of mount Rigid mount Rigid mount Floor BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout Confirm rigidity of floor (vibration coherence)

Proposal 1: advantages & disadvantages (Kume) Tolerant for coherent (slow <0.1~1Hz?) floor motion Simple & low cost Disadvantages Affected by incoherent (=fast >0.1~1Hz?) floor motion Affected by rigidity of mounts Affected by rigidity of interferometer body BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

A.Jérémie BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout

MONALISA : D. Urner BDS Mtg, 9 Jan 2007 Cherrill Spencer Summary of ATF2 3rd Mtg: Mag,Mover,Alignment & IP Layout