14 High Leys Drive, Ravenshead, NG15 9HQ

Slides:



Advertisements
Similar presentations
Doors. Design features Security Durability Thermal insulation Aesthetics Accessibilitycomfortable access for all »Access to letter box »Access for some.
Advertisements

New Homes Construction Overview To Code 4 Long Meadow, Diss Mark Hart Divisional Construction Director.
Competency: Draw Wall Sections
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Additions Concrete, Tile, etc Docks and Decks Foundations Kitchen and Bath Outdoor Features Timber Frame
Technical boclair academy Building Drawings.
Cellular construction
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
How to build a two storey house
Copyright © Texas Education Agency, All rights reserved. Architectural Design The Foundation Plan.
TUDOR HOMES AND BUILDINGS By Ginny Jenkins. Tudor Homes  From around 1890 – 1940 Tudor homes were popular and being widely built. Today they are not.
UNT in partnership with TEA. Copyright © . All rights reserved.
Framing the House. Platform Framing Platform framing.
Name ________________ Unit 6/P6 – Traditional Construction Most common foundation = strip Damp Proof Course 150mm above ground level External Walls are.
Orthographic Drawings
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Pros and Cons: Wooden Deck vs. Concrete Patio Before you decide whether to build a wooden deck or a concrete patio, just make sure that your site is low.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Drafting 2 (Arch) Quiz Review #4 Quiz Review. 1. What is the difference between a pier and column? Bearing capacity Soil impact Concrete block Reinforcing.
Backgrounds and Plaster
Foundations of Technology Construction
Prefabricated Timber Frame Construction
Timber Framed Buildings
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Passive Solar Home Design Project
Curriculum for Excellence
Construction Technology
Progress Charts.
International Building Materials and components
QMC Nottingham - Refurbishment works to Wards A23 & B50
Minuteman Vocational Technical Regional High School Progress
Framing the House                                                                                                                   
Backgrounds and plaster
20 Chestnut Drive, Mansfield
The Beehive House, Castledine Street, Loughborough
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Field House, Car Colston
The Hollies, Ravenshead
C.M. Scullion Associates Ltd
Building Drawings.
Minuteman Vocational Technical Regional High School Progress
Pier Foundations Piers Suspended floor Ground beam Next slide.
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
The Acorn Medical Practice, Wood Street, Mansfield
Value of contract: Length of contract: Contract start date:
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Foundations of Technology Construction
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
Minuteman Vocational Technical Regional High School Progress
PKL INVESTMENTS LTD Value of contract: Length of contract:
Poswillow Suite, Children's Dental Unit
Ashfield District Council Disabled Facilities Adaptations
Field House, Car Colston
Coppice Ridge, Fiskerton, Newark
Eaton MEDC, Sutton-In-Ashfield
Value of contract: Length of contract: Contract start date:
MSB High Value Tool Detailed Example August
Value of contract: Length of contract: Contract start date:
Presentation transcript:

14 High Leys Drive, Ravenshead, NG15 9HQ Value of contract: Length of contract: Contract start date: Completion date: £165,000 6 months June January Works/services provided: Excavation and installation of mass filled concrete foundations Large pre-cast concrete soakaway & underground drainage Beam & block pre-cast concrete floors Masonry walls; blockwork & feature brickwork ‘Mock Tudor’ timber framework & through coloured render finish Installation of New and Replacement of timber windows for UPVC Timber roof structure with feature trusses and ‘Douglas Fir’ soffit boarding Engineered timber flooring throughout the FF and porcelain tiles to the GF Detailed description of contract: Construction of Two Storey side extension in a ‘Mock Tudor Style’ to closely match the existing dwelling. The project included construction of a ground floor ‘single storey’ reception room with decked balcony at first floor level leading to the games room. The ground floor extension included Cinema, Gym, Utility room and enabled the creation of a larger open plan kitchen. Particular challenges to be overcome: Deliver materials to the to the side of the home with large vehicular plant; Concrete wagons, cranes and the like Construct the feature timber roof to achieve the desired aesthetic while lining through with the existing roof structure