Summary on WG 2 LINAC Technology.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

Lutz Lilje DESY -MPY- XFEL Tuner Lorentz Force Detuning System Setup New Saclay design.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Tesla Meeting Frascati 27/05/03 C. Magne Cold BPM for TTF2 Tesla prototype - low beam impedance - cooling to 2K without strain - Low beam coupling impedance:
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Performance of magnetostrictive element at LHe environment 12th International Conference MIXDES 2005 Performance of magnetostrictive element at LHe environment.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
TESLA Linear Collider project overview and linac technology R. Brinkmann, DESY ITRP Meeting, RAL Jan. 28, 2004.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Progress report of the tilt monitor Daisuke OKAMOTO Tohoku University.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
S1G Experiment Schedule Plan
Status and plans for the 3.9 GHz section of XFEL
WP5 Elliptical cavities
Re-entrant BPM R&D for ILC Main Linac
Requirements for Efficient CW SRF Cryomodules
ILC-SCRF Test Facilities considerations
Power Couplers, HOM Couplers and Tuners for the XFEL
Power coupler at DESY & for XFEL
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Chris Adolphsen Sergei Nagaitsev
Main Linac EDR: Cavity & Cryomodule Discussion
Mechanical setups Lorentz Force Detuning System Setup
Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
High Gradient Cavities: Cost and Operational Considerations
CW Operation of XFEL Modules
Degradation and possible sources Statistic of resonators
Review of the European XFEL Linac System
CEPC RF Power Sources System
High gradients in TESLA nine-cell cavities
Nick Walker (DESY) EU GDE Meeting Oxford
Technical Issues Related to Superconducting Accelerator Modules
ERL Director’s Review Main Linac
Summary of the maximum SCRF voltage in XFEL
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Summary on WG 2 LINAC Technology

Discussion on Technical issues Definition of work package leaders Work package leaders will be contacted by L. Lilje next week Lutz Lilje DESY 19.11.2018

Program Danilo Barni Module, Tuner (20 min) AFTERNOON session (Coffe Break 16.00) Add. information available on request by: Leaks in tests - Detlef Reschke Cleanroom Quality control - Axel Matheisen Flange designs - Kirsten Zapfe Coupler Design and Processing - Terry Garvey / W.-D. Moeller HOM and Pickup - Wolf-Dietrich Moeller Experience Module Assembly Rolf Lange Active tuning - Lutz Lilje/Stefan Simrock Priority and effort estimation, definition of Work packages Presentation of itemized priority list - L.Lilje / D.Reschke (20 min) Discussion on estimation of the effort needed to address technical issues and priority ranking Definition of Work packages Discussion : Distribution of Work packages Preparation of the Summary MORNING session R&D Session 9.00-10.00 H. Padamsee DESY EP single cell cavity sent to Cornell - various treatments and results – (20min) H. Padamsee 550 RRR russian Nb single cell cavity high gradients results with thermometry– (20min) L. Lilje High gradients in TESLA nine-cell cavities – (20min) General Talk 10.00-11.20. (coffee break) Paolo Pierini - Design consideration for accelerator reliability (30 min) Cristian Magne Cold BPM - (30 min) Overview technical issues related to superconducting accelerating modules 11.20-12.00 Lutz Lilje String, Cavities, Coupler, HOM , Clean room assembly - (40 min) Lutz Lilje DESY 19.11.2018

L. Lilje High power test Piezo compensation Lutz Lilje DESY 19.11.2018

High Power Test of an EP nine-cell cavity Calib. Measurement HERA plant High Power Test of an EP nine-cell cavity 5 Hz, 500 us fill, 800us flat-top Feed-forward only No piezo compensation at the moment 33-35 MV/m with no interruption related to cavity-coupler-klystron since more than 130 hours 2 cryo problems at 95 and 130 hours resulting from connection to the HERA plant Cryo shutdown right now due to problem of impurities in He circuit (from HERA plant) (scheduled calibration measurement at 65 hours shown in the plot) Very low activity in the high power coupler, temperature levels o.k. for 5 Hz No field emission observable Lutz Lilje DESY 19.11.2018

Frequency stabilization at 35 MV/m Blue: With piezo Red: Without piezo Frequency detuning of ~1000 Hz compensated with resonant excitation of a mechanical cavity resonance at 230 Hz. NOTE: This is rather an demonstration of the capability of active tuning. Application in a real machine is probably difficult/impossible. Lutz Lilje DESY 19.11.2018

Hassan Padamsee RF Critical field of niobium ‘In-situ’ Bakeout Lutz Lilje DESY 19.11.2018

Lutz Lilje DESY 19.11.2018

Cornell Results Lutz Lilje DESY 19.11.2018

P. Pierini Reliability Bottom-up approach is more reasonable than Top-down (complexity generates wrong results) Lutz Lilje DESY 19.11.2018

Warning/2 Formal mathematical and statistical methods can be applied to measure and assess reliability characteristics of components, but the associated uncertainties are high, leading to reliability estimates with limited credibility “(...) the role of mathematical and statistical methods in reliability engineering is limited, and appreciation of the uncertainty is important in order to minimize the chances of performing inappropriate analysis and of generating misleading results. (…) practical engineering must take precedence in determining the causes of problems and their solutions” [PDT O’Connor] 11/19/2018 Lutz Lilje DESY

However… There exist design principles to achieve a reliable system: Derating: Operate components below max rating Redundancy: Provide more components with a given function Fault Tolerance: Component failure do not imply system failure Mathematical and statistical methods for reliability assessment teach us that the reliability of a complex system depends not only by the component specifications (MTBF/MTTR), but also, even more importantly, by the logical and functional connections (role of redundancies and spares) In other words, proper planning of redundancies allows building reliable systems out of moderately reliable components 11/19/2018 Lutz Lilje DESY

C. Magne Cold BPM design Dark current monitor Resolution needed for cavity dark current 100 nA? Lutz Lilje DESY 19.11.2018

Cold BPM for TTF2 Tesla prototype - low beam impedance cooling to 2K without strain - Low beam coupling impedance: reduces the beam break-up forces and minimizes the cryogenic heat-load due to resonances. - The (axial) geometry is favorable to cooling to 2K without strain. - The dimensions are small. - The design is adapted to UHV dust-free conditions. - The mechanics is relatively simple to machine (latheprecision of axial sym.) Ability to measure sum signal and dark current Lutz Lilje DESY 19.11.2018

Dark Current Monitor – laboratory test Fmono= 1.3 GHz Fdip = 2.6 GHz   An aluminium prototype has been fabricated to study the optimum antenna design. - Network analyser - testbench Alu prototype Electronics (analog): - One unit (refurbished) is avalaible - Need to build 1 (or 2?) more Lutz Lilje DESY 19.11.2018

Discussion on technical issues Leaks in tests - Detlef Reschke Flange designs - Kirsten Zapfe Cleanroom Quality control - Axel Matheisen Coupler Design and Processing - Terry Garvey / W.-D. Moeller HOM and Pickup - Wolf-Dietrich Moeller Experience Module Assembly Rolf Lange Active tuning - Lutz Lilje/Stefan Simrock TESLA MEETING 26-28 May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP

Work package list Lutz Lilje DESY 19.11.2018

Work group leader tasks Initiate decision-making process Make a detailed list/ programme as soon as possible Estimation of time required and effort to do this (money, manpower) List of open questions Prepare status report for end of August Report will be made available preferrable through EDMS (Instructions will be send by Axel Matheisen asap) Discussion during next TESLA Meeting Lutz Lilje DESY 19.11.2018

Thanks to all contributors for the very useful discussion and the will to take over the work !!!! Lutz Lilje DESY 19.11.2018