UCSB Testing Status Anthony Affolder

Slides:



Advertisements
Similar presentations
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Advertisements

Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective.
Slide 1PMG Jan CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues Perspective from a large scale production project Anthony Affolder.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Assumptions Electrical and optical hybrids not burnt-in prior to arrival.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1Module Testing Meeting Jan. 29, 2002CMS Module Testing Issues-Anthony Affolder CMS Module Testing Issues From a CDF Testing Experience Perspective.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
MODULE QUALIFICATION STATUS AT LIVERPOOL
CMS Module Testing & Quality Assurance
FNAL Production Experience
ROD assembly and test in US
APV Lectures APV FE Basic Building Blocks How Our Testing Works
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
Update of US Testing Status
UCSB Testing Status Anthony Affolder
APV Lectures APV FE Basic Building Blocks How Our Testing Works
UCSB Short-term Testing Plan
CMS Module Testing Issues
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
Recent TOB Developments
Hardware Needs (Near Term)
Module Failures on RODs
On behalf of the US TOB testing group
First Assembled Rod in US
US Testing Update Anthony Affolder (On behalf of the US testing group)
UCSB Short-term Testing Plan
Operations/Failure Analysis
UCSB Qualification Module Grading
Hybrid & Module Electrical Testing
US Hybrid/Module/Rod Testing Model
Anthony Affolder UC Santa Barbara
Electrical Testing at UCSB: Hybrids & Modules
US Module Testing Progress Report
Current Module LT Testing Capability
Operations/Failure Analysis
Current Module LT Capability
Operations/Failure Analysis
Hybrid & Module Testing Status
Recent TOB Developments
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Module Failures on Rods
US Module Testing Progress Report
Operations/Failure Analysis
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
FNAL Hybrid Testing Status
Presentation transcript:

UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing infrastructure Test results Module test equipment needs Module Testing Meeting March 7, 2003 UCSB Testing Status-Anthony Affolder

Current UCSB Testing Setup 3 ARC Controller + 5 new ARC FE 1 Hybrid testing (2 Hybrid clamshells) 2 Module testing (Module clamshell) LED system DEPP HV supply 1 DAQ system Module Burn-in (Vienna Box) See P. Gartung’s talk Status of testing equipment kept up to date at hep.ucsb.edu/cms/cmsUCSB.html Hybrid Clamshell ARC crate DEPP ARC Controller Module Clamshell LED Controller Module Testing Meeting March 7, 2003 UCSB Testing Status-Anthony Affolder

UCSB Recent Infrastructure Projects Hybrid holding plates Matches hybrid thermal cycling test stand Can bond and test with low noise in same holder Burn-in low voltage distribution crate LED indicators and fuse protection Crowbar HV protection circuit 12 each for FNAL/UCSB Module cold plate Attaches to current module holder Hybrid Clamshell Module Clamshell Module Testing Meeting March 7, 2003 UCSB Testing Status-Anthony Affolder

UCSB Testing Status-Anthony Affolder Testing Facilities Clean room adjacent to production area Room layout finished Currently in high bay with intentionally same layout Clean room will be finished in April High Bay (Ground floor) Rod assembly/burn-in Convenient access to loading dock Module Testing Meeting March 7, 2003 UCSB Testing Status-Anthony Affolder

UCSB Testing Status-Anthony Affolder Test Results (1) 5 hybrids tested on arrival All good, but fail current requirement given in the Procedures for Module Testing Digitization effects cause variations larger than ±20% Hybrid noise requirements should be changed Ni within 50% of average 0.3 < Ni < 1.5 Removes chance of chips with uniformly low/high noise from passing requirements See hep.ucsb.edu/cms/cmsUCSB.html for more complete description Module Testing Meeting March 7, 2003 UCSB Testing Status-Anthony Affolder

UCSB Testing Status-Anthony Affolder Test Results (2) 4 hybrids have had APV bonded to pitch adapters All channels are good Hybrid clamshells enable testing without large pickup effects at chip edges Hybrid isolated with plate and lid grounded Same requirements can be made for hybrids with or w/o PA bonded Module Testing Meeting March 7, 2003 UCSB Testing Status-Anthony Affolder

UCSB Testing Status-Anthony Affolder Gain Measurements (1) Multi-point gain added to ARCS 6.0 beta software Thanks to the Aachen group Tests are very quick and have advantages over pulse shape measurements More uniform More stable Gain linearities Gain variations Strongly suggest that test be all to all M800 production. Will be included TOB testing Make requirements on gain slope, offset and fit c2 Module Testing Meeting March 7, 2003 UCSB Testing Status-Anthony Affolder

UCSB Testing Status-Anthony Affolder Gain Measurements (2) 2 of 24 chips so far have no response with low injection values Only occurs in peak mode inverter on Caused by initialization defaults in ARCS tests VPSP set too low Thanks to T. Franke and M. Raymond for help VPSP setting will be modified in new release Removes all seen irregularities Module Testing Meeting March 7, 2003 UCSB Testing Status-Anthony Affolder

Current Estimated Testing Through-put Hybrid Arrival Testing 24 Hybrids per day Matches peak production (+ contingency) Requires dedicated tech Module Basic Test 2 ARC LED stands but only 1 hybrid-to-utri version D XX Modules per day Module Burn-in (Vienna Box) See P. Gartung’s talk for details Lack of hybrid-to-utri adapters limits testing through-put to 1 While burn-in test underway, no module testing possible Module Characterization test will be done at beginning/end of test cycles ARC After Burn-in Test Not clear how much ARC testing necessary after burn-in Depends on grounding/pickup issues LED is minimal test Time estimates do not include database entry. After finishing test equipment acquisition/integration, database will be first priority. Module Testing Meeting March 7, 2003 UCSB Testing Status-Anthony Affolder

UCSB Testing Status-Anthony Affolder Current Testing Needs Module Burn-in Will not begin large scale production without module burn-in capability Recent shipment to US meets most hardware needs Thanks to all involved Second Vienna cold box scheduled to arrive in early April hybrid-to-utri adapters and the Torino interlock box biggest needs See P. Gartung’s talk Module Testing IV scan, database input Hybrid Characterization Database input Hybrid thermal cycling box Lack hardware/software Tests will be performed by A. Honma’s group for M800 Will aid in manufacturing of test stand Rods Begin to assemble necessary infrastructure for rod assembly/ burn-in Xrod software package already compiled and running Module Testing Meeting March 7, 2003 UCSB Testing Status-Anthony Affolder