Project Overview Mission Introduction of J/V project team Project Overview Location and Site Goals for today AGENDA.

Slides:



Advertisements
Similar presentations
12-1 Chapter 12 Advanced EHR Functionality © 2012 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill.
Advertisements

Planning for a New Branch Library Council Said Yes, Now What?
Transforming Secondary Education in New Jersey Lucille E. Davy, Commissioner Willa Spicer, Deputy Commissioner Jay Doolan, Assistant Commissioner New Jersey.
Welcome to VetSuccess Orientation
1 DOE Safety Committee Handbook. 2 Effective Safety Committee! Make it work for you!
Emergent Care OASIS-C Contact: Cindy Skogen, RN (OEC) , or
VA Mission & Vision Mission Vision
NATIONAL HEALTH SERVICE CORPS 1. AGENDA 2 Overview of the National Health Service Corps Loan repayment program Scholarship program NHSC-approved sites.
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
ENDURANCE REDEFINED: ADAPTIVE SPORTS FOR VETERANS WITH DISABILITIES VA FACILITY NAME [MODIFY ON SLIDE MASTER] VA EASTERN COLORADO HEALTH CARE SYSTEM ADAPTIVE.
Retooling Transitional Housing
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
OHIOS COUNTY VETERANS SERVICE OFFICES PROVIDING ASSISTANCE TO VETERANS, SERVICE MEMBERS, AND THEIR FAMILIES 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Technology Ventures Clinic Eric Menkhus Director, Technology Ventures Clinic Associate Clinical Professor, Sandra Day OConnor College of Law.
Massachusetts Centralized Clinical Placement System© Clinical Faculty Introduction to the Online Orientation Massachusetts Department of Education A Presentation.
MDR-TB GLOBALLY AND IN THE REGION 2013 Dr Samiha Baghdadi Medical officer – STB WHO – EMRO Cairo March 2014.
Douglas P. Ruderman, LCSW-R Director, Bureau of Program Coordination and Support.
Statewide Medicaid Managed Care Update Beth Kidder Assistant Deputy Secretary for Medicaid Operations Presented to the Florida Commission for the Transportation.
Contractors Networking & Teaming Forum January 17, 2012
Veteran Service Organization ‘Officers Day’ December 3, 2010 Voluntary Service.
TULLIO ARENA EXPANSION & RENOVATION Project Information Meeting Thursday, August 26, :00 – 3:30 pm Please sign in on the attendance sheet.
Thank you to the 2015 Virginia Emergency Management Symposium Sponsors
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Activation Process Management - Electronic Checklist System
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
The Big Puzzle Evolving the Continuum of Care. Agenda Goal Pre Acute Care Intra Hospital Care Post Hospital Care Grading the Value of Post Acute Providers.
Surviving Survey and Re-certification. Rural Mississippi Mississippi Stats ◦116 Hospitals ◦154 RHC’s (MSDH website) ◦28 CAH’s (35miles or “necessary.
“Serving Those Who Have Served” VA Boston Healthcare System (VA BHS)
28 – 29 September 2011 Vedic Village Spa Resort Kolkata, India. Mohammad Dauod Khuram MD, MPH National Manager, Health Program Aga Khan Foundation, Afghanistan.
VA/DoD Sharing Agreement Database
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
LOS ANGELES COUNTY DEPARTMENT OF HEALTH SERVICES Harbor Master Plan Meeting June 22, 2011.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Annual 2009 VA/DoD Joint Venture Conference El Paso Joint Venture Wm. Beaumont Army Medical Center and El Paso VA Health Care System Dane Wirtemburg, EPVAHCS.
INDIANA DEPARTMENT OF ADMINISTRATION MEDICAID RATE SETTING LTC AUDITING SERVICES REQUEST FOR PROPOSAL on behalf of the Family and Social Services.
Anne Arundel County COOP Kick-Off Office of Emergency Management Jim Weed, Director
Pre-Proposal Conference NASA Langley Research Center October 26, 2009.
How to Build a Successful Incentive Fund Proposal February 22, 2006.
Component 1: Introduction to Health Care and Public Health in the U.S. Unit 2: Delivering Healthcare Government Health Care Services.
Massachusetts “Bridges” to Community. Agenda  Project Overview  Who is eligible?  What is the process  Questions & Feedback.
Hensel Phelps Technical Assistance Program (TAP)
1 Illinois Department of Human Services Division of Mental Health Presents March 11,2008 Illinois Mental Health Collaborative for Access and Choice and.
California State University, Sacramento Facilities Services May 19, 2008.
Process of Planning, Designing and Financing a Hospital
Guidance Training (F520) §483.75(o) Quality Assessment and Assurance.
VA Indian Health Service BCMA Effort Chris L. Tucker Director, Bar Code Resource Office VHA OIA, Health Informatics.
0 Presentation to: Providers, Trading Partners & Billing Firms Presented by: Sheldia Evans-Maddox Department of Community Health (DCH) Medical Assistance.
1 Division of Behavioral Health Policy and Planning Diversion Data Base (DDB) First, Second, & Third Quarters FY08 July 1, 2007 through March 31, 2008.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
VA / DoD JOINT VENTURE Wm Beaumont Army Medical Center El Paso VA Health Care System.
CM PRE-QUALIFICATION CONFERENCE – FEBRUARY 4, :30-3:00PM – JOHNSON CENTER ROOM G19 – GOLD ROOM CM Services for Construct Utilities Infrastructure.
Introduction to JCI Standards &
Terminal Development Program at Dallas/Fort Worth International Airport Briefing to the Fort Worth City Council June 8, 2010.
Teaming and Joint Ventures To “WIN” United States Department of Veterans Affairs Industry Day Palo Alto, CA October 1, 2015 VA Office of Small and Disadvantaged.
Windsor C-1 School District Planning 2017
Aerial of the full site facing northeast taken on March 1, 2016.
Department of Veterans Affairs (VA): Program in Rehabilitation Research ̶ Overview & Funding Opportunities Christopher A. Moore, Ph.D., Dean College of.
Proximity to Opportunity IAH New Terminal C North
Redevelopment Projects & Contracting Opportunities
October 2017 Mustang panther package b update
CAPITAL PROGRAM OVERVIEW
Contractor Open House and Diversity Networking Event
A Contractor and Supplier Workshop Schools Capital Improvement Program
CONVENTIONAL FACILITIES LCLS Office Space Procurement
TURNER ONLINE PREQUALIFICATION WORKSHOP for The Christine E. Lynn
Parkland Outpatient Clinic (OPC2)
Risk Adjustment User Group
Presentation transcript:

Project Overview Mission Introduction of J/V project team Project Overview Location and Site Goals for today AGENDA

VAs Mission ……, to care for him who shall have borne the battle, and for his widow and orphan, ….. --Abraham Lincoln

The Project Team

Introduction of Project Team Representatives from the Preconstruction and Procurement Team are located around the facility

Primary JV Point of Contact for All Subcontractors Eric B. Gass Purchasing Manager Director of Small Business Development

Project Overview Key Components –Inpatient Bed Facility for approx. 150 beds (spinal cord injury, medical/surgical, intensive care and behavioral health) –Freestanding Community Living Center, Outpatient Clinics Diagnostic and Treatment Center –Research Laboratories –Renovation of existing office building for admin offices and behavioral health clinics –Central Concourse for public functions, amenities and circulation –Central Energy/ utility plant –Advanced alternative energy features and sustainable design

Project Location The Department of Veterans Affairs (VA) will build a replacement hospital on the eastern edge of the University of Colorado Health and Science Campus (formerly the Fitzsimons Army Medical Center) in Aurora, Colorado.

Project Location

Primary JV Point of Contact for All Subcontractors Eric B. Gass Purchasing Manager Director of Small Business Development

Joint Venture Project Website Replacement Medical Center Facility Eastern Colorado Health Care System Preconstruction Timeline and Potential Package Development Phase I - 2 nd Quarter 2011 Division 1 – Surveying, Trailers, Demolition Division 2 – Civil, Site Prep, Site Utilities Division 7 – Waterproofing Division 8 – Curtain Wall Design Assist Division 15 – Underground Division 16 – Underground

Preconstruction Timeline and Potential Package Development Phase II - 3rd Quarter 2011 Division 3 – Foundations, Underground Structures, Slab on Grade, Core & Shell Structure Division 4 – Masonry Division 5 – Structural Steel Division 6 – Rough Carpentry Division 14 – Pneumatic Tubes, Elevators Division 15 – Equipment, Core & Shell, Fire Protection, Fire Proofing Division 16 – Equipment, Core & Shell Joint Venture Project Website Replacement Medical Center Facility Eastern Colorado Health Care System

Preconstruction Timeline and Potential Package Development Phase III - 4th Quarter 2011 Division 2 – Landscape, Hardscape Division 3 – Precast Division 5 – Canopies Division 7 – Roofing Division 8 – Core & Shell Doors/Frame/Hardware, Glass & Glazing Division 15 – Energy Systems & Equipment Joint Venture Project Website Replacement Medical Center Facility Eastern Colorado Health Care System

Preconstruction Timeline and Potential Package Development Phase IV - 1st Quarter 2012 All other trades including finishes, medical equipment, furnishings, signage, A/V, Communications, Millwork, etc… Joint Venture Project Website Replacement Medical Center Facility Eastern Colorado Health Care System

Q&A #1 Will the schedule be posted on the website? Answer: Yes, the project procurement timeline will be continually updated by the J/V

Q&A #2 Will there be help with Bonding? Answer: Yes, the J/V will not assist with bonding but will help identifying bonding assistance opportunities.

Q&A #3 How does subcontractor know if they are pre-qualified and able to bid the project? Answer: The J/V will notify each firm if they have successfully qualified to bid the project.

Q&A #4 Will there be one subcontractor per trade for all phases of the project? Answer: No, the J/V will diligently break up the packages and scopes of work to maximize participation.

Q&A #5 Will the bid package approximate sizes be posted on the website in advance to confirm with our sureties? Answer: There will be sufficient time in the bidding timeline to inform your surety of package size.

Q&A #6 Is the prequal package to be printed, filled out and mailed in to the J/V? Answer: Yes, mail to 7200 S. Alton Way, Greenwood Village 80112

Q&A #7 How can I confidentially disclose my companys financials? Answer: All financial information is kept confidential, but if necessary we can arrange for face to face disclosure.

Q&A #8 Do J/Vs need to prequal as a J/V? Answer: Yes, but due to the inherent questions associated with a J/Vs lack of financial or safety history each company will be evaluated on their independent qualifications.

Q&A #9 How will the retainage be dealt with on the project. (How long will it be held)? Answer: The retainage will be released in accordance with the project guidelines determined by the VA.

Q&A #10 If we dont qualify for one package will be permitted to requalify for additional packages. Answer: Yes, if areas of inadequacies are addressed prior to next package issuance.

Q&A #11 Ive already prequalified with Kiewit or Turner, do I need to requalify with the J/V? Answer: Yes, you must requalify specifically for the project with the Joint Venture.

Q&A #12 Which website to we refer to for all project updates? Answer: