Cross-Country Sit Ski Progress Report

Slides:



Advertisements
Similar presentations
A Clean Hand Device for Manual Wheelchairs March 4, 2004.
Advertisements

Program Management Office (PMO) Design
Develop an Information Strategy Plan
MVP-502 MVP-502 Wheelchairs Abound Store To Order Call:
Week 4 Deliverables Team Highlander. Patent 1-Motorized Walker Pat No Date 12/08/1992 A motorized walker includes a base upon which a person.
Team members Duc Le Ron Pahle Thanh Nguyen Khoa Tran Sponsor Edwards Vacuum Ltd. Advisor Dr. Dave Turcic.
EPICS Conceptual Review Template Notes:  Use the template as a guide to preparing your presentation….you may add, subtract, or rearrange as needed to.
ME104Q PAPER RIVER CHASM BRIDGE Team Boomerang Mechanical Engineering University of Rochester Executive Summary The premise of this experiment is built.
Understanding product feasibility and business planning.
CSULB Innovation Challenge How to Write a Business Plan November 1, 2013 and November 5, 2013.
Myoelectric Robotic Orthosis
Defining the project You have presented your project proposal and you have the go-ahead to start the project. Before you start you need to ensure everyone.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Applied Software Project Management
2011 Human Powered Vehicle Challenge 'Mjolnir' Team Members: Tad Bamford Ben Higgins Chris Schultz Aaron Stanton Neal Pang.
Cross-Country Sit Ski Cody Barnett Betsy Camp Josh Metzler Robbie Quesada Mark Scheel Alex Triplett Academic Advisor: Dr. Hormoz Zareh Industry Advisor:
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Cross-Country Sit Ski Progress Report Cody Barnett Betsy Camp Josh Metzler Robbie Quesada Mark Scheel Alex Triplett Academic Advisor: Dr. Hormoz Zareh.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
February 2016 Our School Report Cards and Accountability Determinations South Lewis Central School District.
Essential Question: What steps do I need to follow when writing my persuasive essay? 7 Steps to writing a Persuasive Essay.
TEAM ADAPTIVE REC Members Advisors Dale Calnek Jerel Hutapea Chang-Won Park Casey Radtke Academic: Dr. Sung Yi Industry: Jennifer Armbruster Todd Bauch.
Cross-Country Sit Ski Cody Barnett Betsy Camp Josh Metzler Robbie Quesada Mark Scheel Alex Triplett.
Turning Data into Action The GCS Journey. Where we started We had data everywhere It didn’t come with instructions We talked about data-based decision.
Presented By: Trevor Murphy Kellie Mahon Eddie Meaney
Ergonomic EEG Cart for Viasys Healthcare Monitor: Now mounted on a fully adjustable boom, the monitor can be seen at multiple angles resulting in less.
ACCESS for ELLs Score Changes
Process 4 Hours.
Quantum Leap Project Management
Nathaniel Watts, Justin Kibler, Angel Hambrecht, Maxine Laroche
Adjustable Single Weight Lifting Machine
Program Management Office (PMO) Design
The Four-legged Water Walker
Program Management Office (PMO) Design
Irish Survey of Student Engagement (ISSE) Results 2016
Program Review For School Counseling Programs
Your Personal Workout Coach
Instructional slide to Partner: REMOVE BEFORE PRESENTING TO CUSTOMER
PMI Chapter, IT Governance, Portfolio and Project Management in State Government Chris Cruz, Chief Information Officer, California Department of Food and.
Informative Speech.
EPICS Design Review Template Notes:
Design Process By Jennifer Berry
Program Management Office (PMO)
PDCA Problem Solving Guide
EPICS Conceptual Review Template Notes:
Campus Locator – Definition Phase (May04-04)
P17082 Biomechanical Elbow Model Detailed Design
Critical Changes to PMBOK6
Fahrig, R. SI Reorg Presentation: DCSI
FitSki Lorielle 11/30/2018.
FitSki Lorielle 11/30/2018.
Positioning/ alignment device for ophthalmic scanning laser systems
Program Management Office (PMO)
Program Management Office (PMO)
Professional Learning Update & Scorecard
[Insert State Name] State Assessments: What do families need to know?
CHAPTER 4 PROPOSAL.
CHAPTER 4 PROPOSAL.
CHANGING SPEAKERS Active Speaker Following Speaker
7 Steps to writing a Persuasive Essay
Marketing Management Indicator 1.03
University Template Sample Slides June 2017.
Lesson 10: IT Project and Program Management
IDEA Student Ratings of Instruction
Review the Problem of Practice.
Fahrig, R. SI Reorg Presentation: DCSI
Title (one line is best; two is OK)
ARM Posting Generation Walkthrough
Motor Cart with Dolly Hoist
7 Steps to writing a Persuasive Essay
Presentation transcript:

Cross-Country Sit Ski Progress Report Cody Barnett Betsy Camp Josh Metzler Robbie Quesada Mark Scheel Alex Triplett Academic Advisor: Dr. Hormoz Zareh Industry Advisor: Jennifer Armbruster Sponsor: PSU Inclusive Recreation

Agenda Introduction Mission Statement Final PDS External Search Internal Search Concept Selection User Survey Project Schedule

Introduction Inclusive Dept. of Campus Rec wants a cross-country sit ski Must accommodate various Body shapes Injury types Body shape: Height, size, weight Injury types: Levels of functionality. Mention that lower-level quadriplegics (quadriplegia is AKA tetraplegia) still have some arm functionality, but have probably lost some hand functionality. Maybe give a nod to the handcycling team, who alluded to this fact but didn’t really explain it. Adjustability will ensure that the highest number of people possible can use it.

Mission Statement The objective of the PSU Sit Ski Team is to design and build a cross-country sit ski for the PSU Inclusive Rec Department. The sit ski must accommodate varying user size, weight, and injury type. The product and supporting documentation will be delivered to Inclusive Rec in June of 2012. This is an actual statement, so it should be included verbatim. Otherwise, we should not have a “Mission Statement” slide. While this is displayed, I will say something like the below, instead of turning around and reading the slide: “Our mission is to design and build a sit ski with enough adjustability to address those aspects [mentioned in the previous slide] from user to user.”

Final PDS Seat back adjusts from 19” to 25” Seat back reclines from 90° to 120° Footrest adjustable Bottom of seat adjusts to 20° Restraints for T12 to C5 injuries Cost less than $1500

External Search Kiwi X-Country Ski Lightweight Adjustable footrest Fixed seat Loss of core strength Low to the ground This is the best available picture. Although small, we should include it so that the audience has some idea of what we’re talking about. Lightweight: May only be possible for fixed sit skis, makes final product more expensive

External Search Teton Nordic Sit Ski Telescoping footrest Molded seat is fitted Frames custom-built Does not mount to commercially available bindings Footrest: Only 1-D adjustability Molded seat: Glove Seating used by many sit ski manufacturers, does not allow for adjustability and costs several hundred dollars Want to use traditional skis

External Search Central Cross Country Footrest inadequate Restraints do not accommodate higher-level injuries Users have noted rubbing issues with seat material Footrest: Simple bar Restraints: Essentially just lap belts Material: Basic mesh, can cause sores

Internal Search Brainstorming Sessions Concept Designs

Internal Search Concept Designs Seat Frame Adjustability Restraints

Concept Selection Overall Design Selection Fundamental Design Low-Risk Design Improved Design Pros Simple design Robust frame Low-cost seat Cons Lack of adjustability Lack of strap points Expensive manufacturing Pros Simple design Some adjustability Bucket seat Cons Expensive seat & parts Low adjustability Pros Adjustability Strapping points Manufacturing ease Cons Heavy Manufacturing time

Concept Selection

User Survey User online survey Validate design decisions Utilize users’ experience and knowledge

Project Schedule PDS Internal Search External Search Detail Design Start Date Finish Date Design December 1 April 5 Manufacturing April 2 May 16 PDS Internal Search External Search Detail Design Testing May 17 May 31 Final Delivery June 8

Summary Introduction Mission Statement Final PDS External Search Internal Search Concept Selection User Survey Project Schedule

Questions ?