BRIAN KLATT MISSION ASSURANCE MANAGER

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
Mission Success Starts With Safety GSFC Electrostatic Discharge (ESD) Control Program Are you plugged in? Jeannette Plante, Program Manager, Code 300.
G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Code 300: Workmanship Name:Jeannette Plante Title:Project Lead Office:Bldg 15, Rm 213.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST LAT ProjectACD CDR January 7 and 8, Section 9 – Safety & Mission Assurance GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Safety.
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) MISSION ASSURANCE ACTIVITIES Brian Klatt September 10-11,
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
ITAR Restricted Data THEMIS Power Subsystem CDR Peer Review 6/14/04 Probe and Probe Carrier Harness Dave Manges (301)
Idaho RISE System Reliability and Designing to Reduce Failure ENGR Sept 2005.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Project and Independent Review Activity R. Foster September.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
Reliability Assessments Scope Per paragraph of the MAR and PAIP “ When necessary/prudent or when agreed upon with the GSFC Project Office, Glast.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 1 GLAST Large Area Telescope: Performance & Safety Assurance WBS: 4.1.A.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
SWEA Product Assurance SWEA Peer Review March 28-29, 2011 IRAP, Toulouse.
EFW DFB Systems Assurance
EFW DFB Systems Assurance
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS Mission Assurance
ISUAL Product Assurance
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
University of California - Berkeley
Instrument Preliminary Design Review (I-PDR) September 28th, 2005
Peer Review Agenda (Suggested).
CRaTER Pre-Environmental Review (I-PER) SYSTEM SAFETY Brian Klatt
HMI Mission Assurance Manager
Lessons Learned and Earned Value Management System Assessment
Systems Engineering Bob Goeke.
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Instrument Preliminary Design Review (I-PDR) June 27th, 2005
Presentation transcript:

BRIAN KLATT MISSION ASSURANCE MANAGER

Performance Assurance GENERAL PERFORMANANCE ASSURANCE IMPLEMENTATION PLAN LRO MAR Model PAIP CRaTER PAIP is 32-01204, Rev. F - Approved by GSFC PAIP applies equally to BU, MIT, and Aerospace Corp. 11/19/2018 Performance Assurance

Performance Assurance QUALITY ASSURANCE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FLOW-DOWN IMPLEMENTED THROUGH: SUBCONTRACT (CDRLs) PAIP PURCHASE ORDERS 11/19/2018 Performance Assurance

Performance Assurance SYSTEM SAFETY NO CHANGES HAZARD ANALYSIS REPORTS UPDATED AND SUBMITTED - see 32-04015 Hazard Verification and tracking is 32-04014 11/19/2018 Performance Assurance

Performance Assurance RELIABILITY Failure Modes and Effects Analysis Prepared (see 32-04009) Part Stress Analysis Prepared (see 32-04010) Derating per EEE-INST-002 Reliability Assessment (see 32-04003)  Probability of Mission Success Ps = 96.5 % 11/19/2018 Performance Assurance

Performance Assurance 11/19/2018 Performance Assurance

Performance Assurance SOFTWARE ASSURANCE NO CHANGES - -NO SOFTWARE 11/19/2018 Performance Assurance

Performance Assurance DESIGN REVIEWS Formal Reviews Preliminary Design Review (IPDR) - held at MIT on 9/28/05 5 RFAS: 4 closed, 1 in-work at MIT & GSFC  Critical Design Review (ICDR) - held at MIT on 6/27/06 Peer Reviews Mechanical peer review held at MIT on 5/5/06 17 Comments in process at MIT Electrical peer review held at GSFC on 5/22/06 15 Comments with responses to initiators 11/19/2018 Performance Assurance

Performance Assurance DESIGN VERIFICATION Performance and Environmental Verification Plan - see 32-01206 Performance Verification - Comprehensive Performance Testing (CPT) is performed during extremes and at completion of Environmental Verification Environmental Test Matrix - see 32-01206.01 11/19/2018 Performance Assurance

WORKMANSHIP and ELECTRONIC PACKAGING WORKMANSHIP - Recertification scheduled for late August Staking and Conformal Coating Soldered Electrical Connections Crimping, Cables, Harnesses, and Wiring Electrostatic Discharge (ESD) Avoidance PRINTED CIRCUIT BOARDS Coupons submitted for Engineering PCBs. Coupons passed but comments have prompted redesign for flight hardware. 11/19/2018 Performance Assurance

MATERIALS and PROCESSES Changed from AL 7075-T651 to Al 7075-T73 Fasteners were bought to NASA Directive 541-PG-8072.1.2 Processes  Conversion Coating is Alodine only 11/19/2018 Performance Assurance

Performance Assurance EEE PARTS PART SELECTION, SCREENING, QUALIFCATION and DERATING is per EEE-INST-002 ALERTS Review ALERTS and NASA Advisories monthly - report to GSFC 11/19/2018 Performance Assurance

CONTAMINATION CONTROL Contamination Control Plan is CRaTER document number 32-01203 CRaTER Contamination Sensitivity - quite insensitive Detector is not hermetically sealed and has .001 aluminum bond wires (purge) 11/19/2018 Performance Assurance

Performance Assurance 11/19/2018 Performance Assurance