Testing Workshop on Survey and MM

Slides:



Advertisements
Similar presentations
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Advertisements

Manufacturing Systems Project Management. Behavioural Dynamics in Team Work Team: ‘two or more individuals associated in some joint action’ Team Dynamics:
Peter Spiller, IHEP, Protvino GSI, Peter Spiller IHEP FAIR in kind Contributions.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Day 1 Session 2/ Programme Objectives
Corporate Support Richard Brown, Business Director.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Progress report on the test facility project design and construction P. Schnizer and L. Serio on behalf of bldg. 180 test facility project team members.
REAL WORLD RESEARCH THIRD EDITION Chapter 8: Designs for Particular Purposes: Evaluation, Action and Change 1©2011 John Wiley & Sons Ltd.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
E-learning. E-Learning: Why? E-learning represents the ideal instrument to manage a widespread training in a developing EU common market and in the world.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Sketching Basic Kicker System Parameters W. Bartmann, T. Fowler, B. Goddard, T. Kramer.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Briefing to the Portfolio Committee on the Comparison on Procurement Methodologies 6 June 2006.
What is project management?
CISB444 - Strategic Information Systems Planning Chapter 3 : Developing an IS/IT Strategy: Establishing Effective Processes Part I.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
The integration of 420 m detectors into the LHC
Recommendations on Supports and Adjustment systems for ESS LINAC Components Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
Technology Team Callan, Kristen, Meghan, Valyssa, and Lukas.
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
The reading is 7.38 mm. The reading is 7.72 mm.
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Registered participants participants from outside Cern.
Summary of discussions
UNOPS Putting UNOPS competency framework into action – development of a leadership mindset Welcome and Intro.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
Status, Schedule and EVM for the test facility project
Day 1 Session 2/ Programme Objectives
2 Seas Monitoring and Evaluation approach INTERACT seminar – Evaluation Plan workshop Vienna, 12 November 2015.
STRAW TRACKER SYSTEM CAD STATUS :
Institution Name Our Team Setup
Other magnets procurement status:
Objectives of the Training
(Procurement, testing of magnets)
M.Jonker CTC MPO-WG status
Introduction to the Workshop
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Testing CERN Magnet – Test Station Interface
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
Actions that make a difference using employee survey results.
2008 Team Building Workshop
Summary of discussions
New User Interface for extracting statistical data from Eurostat databases Thom Werkhoven Dissemination Working Group – November 2005.
Los Angeles Trade Technical College Institutional Self Evaluation Report Presented to the Institutional Effectiveness and Student Success Committee.
Alignment of the first two magnet system modules of Wendelstein 7-X
Programme Management Board
Experimental equipment Edgar L. Black February 17, 2019
2008 Team Building Workshop
FEL-Beam-Dynamics Group
2008 Team Building Workshop
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Morbidity statistics Item 10 of the agenda
Industry Engagement Program Medical Diagnostic Imaging (MDI) Equipment
2008 Team Building Workshop
Investment and Financial Flows (I&FF) Assessment
Two-beam Test-stand Design and Construction Status
FCC study – Fire collaboration WP4 Status & Update
Knowledge-based Systems
East Hall under construction
Presentation transcript:

Testing SuperFRS@CERN: Workshop on Survey and MM Luigi Serio and Pierre Schnizer

Status of the SFRS magnets test facility Requirements and interfaces fixed Layout and integration finalized (minor adj still possible) Specifications established and procurements being launched Construction started for LLI

Motivation for the Workshop Bringing together people working on SFRS machine beam dynamics, magnets designer, magnetic measurements and alignment specialists for a final review of the requirements, assumptions, feasibility and efficient implementation of the MM program In particular: Review the magnetic measurements and alignment requirements justifications Identify the measurements needs and ‘wishes’ for the machine (shall and should) Review the foreseen measurement program to identify Limitations – if any Simplification – if possible Focus on the technical and technology aspect Project aspects to be sorted out by the project team if agreement reached on the above