Vacuum Modules in LHC Septa V. Baglin (10/4/12) CERN TE-VSC, Geneva

Slides:



Advertisements
Similar presentations
Page 1 Jan Uythoven AB/BT, LBDS meeting 18 May 2004 Apertures LSS6 l Position MKQA l Vacuum chamber between Q4 and TCDS.
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Vacuum System Elements for BESSY II Vacuum Equipment All vacuum elements are produced at BINP in accordance to the European standards and satisfy the.
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
Beam Dumping System – Failure Scenarios Brennan Goddard, CERN AB/BT How the dump system can fail Catalogue of primary failures Failure classes and protection.
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
1 Pressure observations at TDI till fill 2158 V. Baglin (27/08/11) CERN TE-VSC, Geneva 1. 2.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
SPS Beam Loss System The SPS Beam-Loss System Hardware: Gianfranco Ferioli Software: Lars K. Jensen CERN SL/BI SL/OP Linkman: Antoine Ferrari.
The LHC injection systems located in points 2 and 8 are comprised of several elements common to the LHC ring and the downstream ends of the TI 2 and TI.
Training in Vacuum Technology for JUAS 2013 Students
Beam screens in IT phase 1
1 Vacuum – Much Ado about Nothing V. Baglin with inputs from P. Cruikshank CERN TE-VSC, Geneva Vincent Baglin LHC Performance Workshop - Chamonix 2011.
The Large Hadron Collider Contents: 1. The machine II. The beam III. The interaction regions IV. First LHC beam [R. Alemany] [CERN AB/OP] [Engineer In.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
DR to RTML ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
TOTEM Roman Pot Upgrade Project Pots design, tests and timeline production CERN 11 July 2013 D.Druzhkin (NIKIET, Moscow, Russia) 1 & 20th LTEX Meeting.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
1 TI 8 LHC SPS LSS6 IR2 TT41 LSS4 IR8 TI 2 TT60 TT40TT20 LSS2 LSS1 TT10 Mobile dump block (TED) Targets T2, T4, T6 Target T40.
LSS1 post LS2 F.M. Velotti, B. Goddard. Q-Dogleg in LSS1 The quadrupole misalignment in LSS1 was needed to dump horizontally wide beams (e.g. FT beam.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
MI/RR Status January 3, 2014 D. Capista. MI Preformance.
Wednesday 5 th December until this morning 06:59 Stable beams fill #3375, L ~ 6.8e33 cm-2s-1. 10:40 Beam dump, trip of RD2.R5. Integrated L 72 pb-1 in.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Hardware Commissioning Review BDI Equipment
a-C coatings beyond the ITs
Aperture measurements during LHC commissioning 2017
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
CERN – Zanon discussions
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Ultra-vacuum components and systems
Alignment of VSC components along LSS 1&5
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
LHC beam dump 7.56 TeV operation
SPS - EYETS 2016/17 Vacuum systems planning
Preliminary Y-chamber specifications – First draft
CLIC Damping ring beam transfer systems
LHC Beam Vacuum activities during YETS LS2
Septa requirements and suitable septa topologies for FCC
Electron cloud & vacuum pressure observations: 2011 proton run
SPS East Extraction bump inhibit during COLDEX operation
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
LHC INJECTION SEPTUM MSI (1/3)
TDI with large gaps V. Baglin (21/10/11) CERN TE-VSC, Geneva
TCTVB-VMTSA-TCDD area Xrays at 4L2
Discussion on the TDI impedance specifications
Friday 31st August & night
X-Rays made by P. Lepeule (TE/VSC) and J-M Dalin (EN/MME)
IR2 aperture measurements: results, actions and proposal
Typical NC in Warm Modules Following X-ray campaign
RESISTIVE HEAT LOAD FOR THE TDI = LHC injection beam stopper
LHC installation status
Summary first Scrubbing test 31/10/2010
X-rays in A4L2-A4R2 and A4L8 - A4R8 V. Baglin (19/11/11)
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
Project management Ray Veness.
Thursday 10:00 Fill 1986 in stable beams.
Vacuum Modules in LHC Experiments V. Baglin (26/3/12)
WP13 outsourcing: Hollow Electron Lens
Preliminary Results of MD wk46 V. Baglin, G. Bregliozzi, P. Chiggiato,
Presentation transcript:

Vacuum Modules in LHC Septa V. Baglin (10/4/12) CERN TE-VSC, Geneva LRFF - 10th April 2012

MSI in LSS2 Vacuum modules with RF insert 5 typical from LSS (VMAPA, VMAPB, VMZAF) 6 special for MSI and BTVSS area (VMSIA, O, P3, S, R_1, R_2)

MSI in LSS2: VMSIR 0002 Cu insert 3 micron Rh coating IP2

MSI in LSS2: VMSIR 0001 Cu insert 3 micron Rh coating IP2

MSI in LSS2: VMSIS Cu insert 3 micron Rh coating Step between MSIB and MSIA IP2

MSI in LSS2: VMSIP 0003 Cu insert 3 micron Rh coating IP2

MSI in LSS2: VMSIO Cu insert 3 micron Rh coating Recombination of B1 and injection Between MSIA and BTVSS IP2

MSI in LSS2: VMSIA Cu insert 3 micron Rh coating Accommodates BTVSS offsets IP2

MSI in LSS8 Vacuum modules with RF insert 5 typical from LSS (VMAPA, VMAPB, VMZAD) 6 special for MSI and BTVSS area (VMSIN, P2,Q, R3,R4, Z)

MSI in LSS8: VMSIR0004 Cu insert 3 micron Rh coating IP8

MSI in LSS8: VMSIR0003 Cu insert 3 micron Rh coating IP8

MSI in LSS8: VMSIQ Cu insert 3 micron Rh coating Step between MSIB and MSIA IP8

MSI in LSS8: VMSIP0002 Cu insert 3 micron Rh coating IP8

MSI in LSS8: VMSIN Cu insert 3 micron Rh coating Recombination of B1 and injection Between MSIA and BTVSS IP8

MSI in LSS8: VMSIZ Cu insert 3 micron Rh coating Accommodates BTVSS offsets IP8

MSD in LSS6 Vacuum modules with RF insert 18 special for MSD and TCDS area (VMSDO, P, Q, R, S, T, U)

MSD in LSS6: VMSDU Cu insert 3 micron Rh coating Extracted beam MSD Circulating beam Extraction chamber VCTYE

MSD in LSS6: VMSDT Cu insert 3 micron Rh coating For MSDC Extracted beam Circulating beam

MSD in LSS6: VMSDS Cu insert 3 micron Rh coating Transition MSDC-MSDB Extracted beam Circulating beam

MSD in LSS6: VMSDR Cu insert 3 micron Rh coating For MSDB Extracted beam Circulating beam

MSD in LSS6: VMSDQ Cu insert 3 micron Rh coating Transition MSDB-MSDA Extracted beam Circulating beam

MSD in LSS6: VMSDP Cu insert 3 micron Rh coating For MSDA Extracted beam Circulating beam

MSD in LSS6: VMSDO Cu insert 3 micron Rh coating Transition MSDA-TCDS MSDA entering flask ? => need design of a recombination insert (type VMSIN, O) ? TCDS MSDA