Day 2 Summary K. Thome NASA WGCV Plenary # 44

Slides:



Advertisements
Similar presentations
Working Group on Calibration and Validation CEOS-WGCV Activity Report Albrecht von Bargen DLR Agenda Item 7 CEOS-SIT Workshop # 39 EUMETSAT, Darmstadt.
Advertisements

Incoming Themes for 2017 Frank Kelly, USGS
Analysis Ready Data LSI-VC – Adam Lewis Co-chair
Future directions of CEOS WGCV: Incoming chair perspective
CEOS Carbon Strategy – WGClimate Actions
Committee on Earth Observation Satellites
LSI-VC Jenn Lacey, USGS, LSI-VC Co-Lead CEOS SIT-33
Action Item Review for WGCV-44
Action Item Review for WGCV-43
Committee on Earth Observation Satellites
CEOS Plenary 2018 Astrid – Christina Koch, European Commission
WGCV Work Plan Actions K. . Thome NASA WGCV Plenary # 43
A WGCV / WGISS process blue print
Status of Carbon Action Items
Analysis ready data: definition document
WGCV Overview K. Thome WGISS#45 / WGCV#43
Agency Report Geoscience Australia
GSICS/WGCV Linkages K. Thome NASA WGCV Plenary # 44
WGCV Chair’s Report K. Thome NASA WGCV Plenary # 44
Site classifications, definitions, and updates to Landnet
Day 3 Summary K. Thome NASA WGCV Plenary # 43
WGCV-32 Action Item Review
Session 2: Analysis Ready Data
Action Item Status / CEOS Work Plan Status
WGISS-WGCV Joint Activity Standardisation and Best Practices
WGCV-43 meeting overview, goals, and agenda approval
CARD4L Product Alignment Assessment
Carbon Actions for WGCV
Day 3 Summary K. Thome NASA WGCV Plenary # 44
WGCV-44 meeting overview, goals, and agenda approval
CEOS Analysis Ready Data for Land (CARD4L) Framework Recap
Carbon Actions for WGCV
Proposed WGCV CARD4L assessment process
National REMOTE SENSING Validation Workshop
WGCV-GSICS interactions
WGCV Chair’s Report K. Thome NASA/GSFC WGCV 42
Communicating Terminology and definitions
Atmospheric Composition SG report
Review of Chair Priorities
Recent activities of OCR-VC
LSI-VC Work Plan Updates
LSI-VC-3 Session 23, 24 CARD4L Overview and Specifications Objectives
Committee on Earth Observation Satellites
Closure of WGCV actions (CV-01; CV-09; CV-13; CV-16)
WGCV business - Future meetings and vice chair
Prepared at the Joint Meeting For SDCG for GFOI / GEOGLAM / LSI-VC
WGCV Work Plan Actions K. Thome NASA WGCV Plenary # 44
Technical aspects of the GIRO work: inputs from GRWG
Update on CEOS Pre-Launch Calibration Workshop
Uncertainties for Analysis Ready Data
Lunar Calibration Workshop Wrap up, next steps and list of actions
SIT Chair Introduction
SAR Subgroup Report Bruce Chapman (NASA-JPL) CEOS – WGCV Plenary #44
Future Near-term Plans
DEM update and discussion
Summary of WGCV/WGISS interactions from WGCV-43
Day 2 Summary K. Thome NASA WGCV Plenary # 42 May 16-19, 2017.
Implementation Update
RadCalNet/Landnet process for adding new sites
WGCV-42 meeting overview, goals, and agenda approval
LSI-VC CEOS Work Plan Tasks
Communication with WGCV/ MWSG
A Broader CEOS ARD Strategy
Session 2: CEOS Analysis Ready Data for Land (10:50 – 11:00)
WGCV CARD4L Peer Review Medhavy Thankappan WGCV-45 July 15-19, 2019.
WGCV Chair’s Report C. Ong CSIRO WGCV Plenary # 45
FDA-12: Inventory of space data product formats used by CEOS agencies
WGCV-45 meeting overview, goals, and agenda approval
CEOS Analysis Ready Data Strategy
DEM related topics K. Thome NASA WGCV Plenary # 45 CSIRO, Perth
Presentation transcript:

Day 2 Summary K. Thome NASA WGCV Plenary # 44 EUMETSAT, Darmstadt, Germany August 28-31, 2018

Key points from Day 2 Overview of EUMETSAT cal/val activities are impressive, comprehensive and quantitative GSICS/WGCV links are strong at the subgroup levels Reference solar spectrum activities Lunar calibration efforts TIR standards Microwave collaborations are being formalized MTF activities on WGCV side need to find a home within GSICS L1 interoperability efforts Is a large topic area to address fully There are long term benefits to the CEOS community from WGCV examining this fully There are also short term needs of CEOS that WGCV needs to recognize pointing to providing results sooner than later

Key points from Day 2 Virtual constellations Impressive array of people at EUMETSAT in leadership roles within VCs that took the time to meet with WGCV Identified several tasks happening with the VCs and WGCV subgroups that have natural connections between the organizations Agreed that forced collaborations are not as productive as ones occurring using existing efforts on one or both sides Repeating the exercise of VC presentations would be useful and future interactions can become more focused on details on how each of the groups is benefiting or has benefited directly from the support of the other NEED a rep POC to LSI VC Header

Key points from Day 2 CARD4L and LSI-VC One topic was overlooked in the discussion: LSI-VC would appreciate WGCV identifying a point of contact within WGCV to identify a POC for CARD4L PFS Product Alignment Assessment process Presentation of examples of ARD and CARD4L Still remains concern, confusion, difficulties of what is specifically meant by the term “Analysis Ready Data” Largest concern is the possible lack of quantitative assessment of and traceability to the at sensor radiance (often called Level 1) CARD4L product assessment process makes sense at a high level view

Key points from Day 2 CARD4L and LSI-VC CARD4L product assessment process makes sense at a high level view Still some issues with the details of the process Details on who is doing what and with what resources is lacking It is possible to develop a “peer review” process of a CARD4L product assuming that the current LSI-VC CARD4L is the evaluation criteria It is imperative that WGCV work with LSI-VC to iterate on the definitions and criteria within their product family specifications A reasonable first draft of a review process was described and will be forwarded to LSI-VC for discussions

CARD4L evaluation process WGCV-44-07 An initial draft of a CARD4L peer review process will be provided to LSI-VC that clarifies the term “peer review” and makes clear that the process is for evaluation and approval of CARD4L products and does not carry WGCV’s (or its subgroups’) endorsement of the product or their validation but rather that the products meet the CARD4L PFS Thome Sept. 5, 2018

CARD4L evaluation process WGCV-44-08 A WGCV POC for the CARD4L PFS Product Alignment Assessment process will be identified and provided to LSI-VC Thome Sept. 12, 2018

CARD4L evaluation process WGCV-44-09 WGCV shall provide LSI-VC and the CEOS CEO with a two-page description of WGCV’s willingness to assist in completing CARD4L Product Alignment Assessments, describe what the assistance would entail, how it interact with LSI in the PAA process, and identify any necessary POCs Thome Sept. 12, 2018

Revised Agenda items Work Plan discussion will follow this Day 2 summary NASA agency report will be at the end of the morning collection of reports ROSCOSMOS and USGS talks will lead the agency talks in the afternoon ACSG subgroup report at 15:15 Projected adjournment this evening is now 6 pm unless there are cancellations of an agency report

Many thanks to our hosts at EUMETSAT for arranging a spectacular German feast after a long day of WGCVing