How To Use “The Facility Which Must Not Be Named” To Optimize CEBAF Performance (Energy Reach, Availability, and Weeks-Of-Operation) S. Benson, D. Douglas.

Slides:



Advertisements
Similar presentations
The JLab IR/UV FEL Driver D. Douglas for the JLab FEL anarcho-syndicalist commune.
Advertisements

Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Driver Accelerator Design D. Douglas, G. Krafft, R. Li, L. Merminga, B. Yunn.
Does the short pulse mode need energy recovery? Rep. rateBeam 5GeV 100MHz 500MWAbsolutely 10MHz 50MW Maybe 1MHz 5MW 100kHz.
Aperture Considerations in the FEL Upgrade Accepted design process –generate design  known –set aperture = N  + W N typically 4 to 6 W is “beam handling.
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Low Emittance RF Gun Developments for PAL-XFEL
Design Requirements/Issues Source/Injector Performance -successful run of 135 pC -DC photocathode gun: cathode lifetime >600 C; GaAs wafer > 2 kC Delivery.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
BIA’s Director Review, September Accelerator Improvements FY11-16 Fulvia Pilat.
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Y. R. Roblin Hall A beamline and accelerator status.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
ICFA Workshop on Future Light Source, FLS2012 M. Shimada A), T. Miyajima A), N. Nakamura A), Y. Kobayashi A), K. Harada A), S. Sakanaka A), R. Hajima B)
12 GeV CEBAF Transverse Emittance Evolution Todd Satogata / Center for Advanced Studies of Accelerators May WEBD1.
T. Atkinson*, A. Matveenko, A. Bondarenko, Y. Petenev Helmholtz-Zentrum Berlin für Materialien und Energie The Femto-Science Factory: A Multi-turn ERL.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Svb[General files ‘01/Presentations]PAC 10 kW laser input.ppt Operated by the Southeastern Universities Research Association for the U.S. Dept. of Energy.
Preservation of Magnetized Beam Quality in a Non-Isochronous Bend
Seesion1 summary Unwanted Beam Workshop (UBW 2012) Dark Current Issues for Energy Recovery Linacs.
SRF Operating Experience at JLab
Beam Commissioning Adam Bartnik.
CALIFES A proposed electron beam test facility at CERN
LDRD Brainstorming Session
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Sara Thorin, MAX IV Laboratory
Data-Driven Machine Retuning
Plans of XFELO in Future ERL Facilities
Options and Recommendations for TL and Dumps
LERF Operation of a High Current, Low–Energy Research Facility for Nuclear and Accelerator Research Stephen Benson Staytreat, July 17, 2015.
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Planning the Experiment
Hosting Orsay Walid KAABI
Overview of LERF Status, Plans and Goals
Objectives for experimental proposal (from Francois):
Joint Accelerator Research JGU & HZB
JLEIC R&D Review: Other R&D
Electron Polarization In MEIC
LCLS-II-HE FEL Facility Overview
CEBAF Injector Overview
Accelerator status after the 12 GeV upgrade
Cost Optimization Models for SRF Linacs
The Cornell High Brightness Injector
Operations Department
LCLS-II-HE FEL Facility Overview
Electron Source Configuration
ERL accelerator review. Parameters for a Compton source
Operations Department
VUV/Soft X-ray Oscillators
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
ERL EIC Workshop | Jefferson Laboratory | November 2, 2018
Injector Setup for G0 and HAPPEX & Lessons Learned
ERL Director’s Review Main Linac
Common Beam Dynamics Issues - PERLE/JLEIC Cooler
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
JLEIC Reaching 140 GeV CM Energy: Concept and Luminosity Estimate
12 Steps to a Cooler Design
HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting
Andrew Hutton Concept suggested independently by Haipeng Wang
JLEIC Main Parameters with Strong Electron Cooling
Comments to the Report of the Community Review of EIC Accelerator R&D for the Office of Nuclear Physics, February 13, 2017 (60 pages) By Haipeng Wang,
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

How To Use “The Facility Which Must Not Be Named” To Optimize CEBAF Performance (Energy Reach, Availability, and Weeks-Of-Operation) S. Benson, D. Douglas (scribe, reporter, and sacrificial lamb…), K. Jordan, R. Legg, T. Powers, M. Spata, and C. Tennant

Machine Layout

Motivation Unique facility world record beam (ERL) and light (FEL) powers two distinct accelerators – the only ERLs (with IR Demo) to exceed RF drive breakeven same technology/hardware base as CEBAF 120M$ investment of taxpayer dollars – mostly from DoD (ONR) and Commonwealth of Virginia – almost completely unutilized Low operational costs beam time cost/hour << (<<<<…) CEBAF Can run intermittently with reliable startup and recovery key point: when its on the air, keep it on the air very robust over short time scales: when run on a regular basis, can shut down and turn back on very quickly ~5 min to high power beam & light from controlled access

What It Can’t (Yet – or Maybe Ever…?) Do Long term stability and reliability not spec’d to do this; it’s a “tune as you go” machine; it will drift and things will break and I dare you to fix this… ;) Recover quickly/reliably after long shutdown it gets lonely, wakes up slowly, and will be cranky until fully awake. And it will be mad that you stole its toys (even if you put them back) Be described by “conventional” models over entire parameter space inherently non-conservative (though it can be run without significant radiative loss) linear optics sometimes fails (CSR from [parasitic] compressions) Multi-pass acceleration with energy recovery it can do multi-pass acceleration (and has been encouraged to do so for years by Roger Carlini…), but can’t recover afterwards right now beam dumps onto chamber in 1st arc dipole => pulsed/low current could add line to extract “energy doubled” beam, (re)install dump…

Delivers beam to open area Provides appropriate beam/lattice properties for tuning/control extraction transport can be configured to cross over above cryo transfer line at west end of building

JLab FEL Accelerator Capabilities External target Internal Target Near Term Capability, Dec. 2013 Full Capability E (MeV) 80-320 80-610 80-165 80-310 Pmax (kW) 100 300 1650 3100 I (mA) 1.25-0.31 (100 kW/E) 3.75-0.5 (300 kW/E) 10 fbunch (MHz) 750/75 Qbunch (pC) 1.67-0.4/16.7-4 (I/fbunch) 5-0.67/50-6.7 (I/fbunch) 13.5/135 etransverse (mm-mrad) ~1/~3 ~2/~5 ~3/~10 elongitudinal (keV-psec) ~5/~15 ~10/~25 ~15/~50 Polarization No 500 mA @ 600 MeV (300 kW) up to 10 mA (or source limit) 750 MHz drive laser; single F100 12 GeV RF drive; three F100s

Vision: Meet Multiple Needs At Very Low Cost Technology test-bed hardware/software tests cost less & frees CEBAF beam up for users extremely flexible platform: system is easy – and designed – to modify to off-normal operation and recover/restore quickly; inexpensive to operate “extreme beam” – high power, bunch charge, etc Training tool Process validation procedure tests recovery/reliability tests (I dare you to make it long-term stable and reliable…!) in situ benchmarks and measurements: rapid system access/recovery “I want to run downstairs for 15 minutes and change ‘whatever’, and then run for another 2 hours” is okay! Leverage short term robustness to support invasive activities; use long-term sensitivity as opportunity for reliability studies

Arne Suggestions Tool development: qsUtility with viewer driven data, bringing Raytrace to completion Training operators scientists technicians RF stuff F100 microphonic analysis and suppression develop multi-cavity PZT algorithms liquid He levels and gradient

Committee (Collusion?) Brainstorming Diagnostic testing Development of new diagnostics Prototyping and tests with beam: diagnostics, cavities, magnets… Any main injector experiments (including at higher energy… can go to 175ish MeV) e.g. bubble chamber or any other low energy physics experiment optics modeling tests nonlinear compensation, non- conservative (non-Hamiltonian) modeling algorithm validation debugging RF testing microphonics beam loading collaboration with ODU – beam dynamics, RF testing, cavity testing (pull zone 3 and put in test cavities) test/commission refurbished modules catch rebuild issues before affecting CEBAF operations/availability cryo load balancing: FEL01-04 provide “ballast”…

Whimsical, Reach, and Somewhat Off-Topic/Off-Color Suggestions Isotope production: offload from CEBAF injector JLEIC R&D magnetized beam tests collimation tests halo characterization high current beam tests weird-ass cavity tests kicker cavities at high current CSR Shielding tests Testbed for positron production THz experiments – can make kW of THz… if there is an application LCLS-II cryomodule testing module and vertical slice test – offload from CMTF can test with 1 MHz beam… Lab leadership foul weather parking Lab leadership foul weather “shelter in place”...? Student (or CASA) bohemian district in labs/trailers…? Service to a broad range of uses/initiatives that have indirect benefit to CEBAF operations and/or institutional mission off-load demands from CEBAF and CEBAF-critical-path facility access free up CEBAF beam for users reduce demands on CMFT, test lab,… leverage lower cost/beam hour These include: Facility/beam time support for SBIR, Stewardship, Early Career,… programs

Summary Basic concept: use the “cheap system” to off-load beam time demands from the “expensive system” “Pre-release” tests for potentially invasive changes Test hardware, provide beam time, at low cost If it can be done in CEBAF using individual sub-systems and/or beam up to ~200 (400…) MeV, it can be done in the facility which must not be named

Summary - continued Can do the things that can be done on the ERLs more cheaply on them than in CEBAF The facility was *designed* for invasive operation: turn on, turn off, access, recover it was *not* designed for long-term stability operation, or to be shut down for long periods of time, or to change in an uncontrolled manner (undocumented part-swapping is problematic) Obvious applications: hardware testing software validation process development training

Issues, Open Questions, and Acknowledgments Startup overhead: machine has been off the air for some time and there will be a price to pay Knowledge base is diffusing away Configuration control: keeping people out of the “spare parts bin” We thank the organizers for the opportunity to discuss this topic, and Joe Gubeli, Todd Satogata, Jay Benesch and Yves Roblin for useful input/review