Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Advertisements

Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Operation TCR 2 nd of July to 10 th of September 2001 More than 20 major events Events grouped by equipment group and zone affected.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
CRYOGENICS AND POWERING
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Cooling of NA62 vacuum system November 11 th, 2014 E. Harrouch, EN-MEF, on behalf of the NA62 Vacuum Team.
:30 meetingEBH 1  7:53 start VdM scans LHCb  8:18 beam dump: RF M2B1 crowbar (3 rd time within 24 hours)  Access for RF  Changed thyratron.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
First results from the study of the LHC cycle power consumption FCC I&O meeting 24 th June 2015 Davide Bozzini With the contribution of G. Burdet, B. Mouche,
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Eric Prebys/LARP 2/17/2016.  CERN has taken unprecedented steps to control information about this event, including altering the electronic LHC log to.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
André Augustinus P2 events & perturbations 07 May 2010 ALICE Technical Coordination Meeting.
Status of the machines over X-mas standby period, services required and plans for rapid start-up OP Group Meeting KH.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
S A Griffiths CM42 June 2015 Electrical & Control.
YETS & LS2 Works EN-EL / Power distribution
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
The LHC - Status Is COLD Is almost fully commissioned
Update on HW commissioning
the high-voltage network of CERN ToMORROW
Wednesday September 14th
Summary Friday h38: Ramp down and pre-cycle.
YETS & LS2 Works EN-EL / Power distribution
Status of the cryogenic system for B180
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
F Duval, on behalf of EN/EL
Monday 11/07: Recovery Plenty of accesses.
Cryo stop of P8 on 1st of November
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
Yesterday Issue of injection kicker not pulsing:
Summary of Week 13 G. Arduini, B. Holzer
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th January 9:30 Network routers restart, all went fine, but only just. 12:00 All power converters from the arcs on at standby 12:00 ELQA test.
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
(1 test missing on RQD/F)
Finally.... We had to wait a long time.... We had many problems....
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday 3rd September - morning
Saturday 3rd November - morning
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Friday 28 October 2011.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
P8 cryogenic PLC problems on
Thursday
Saturday 24 September 2011.
Saturday 2nd October BLM threshold follow-up - Bernd Dehning and Joerg Wenninger Following MPP approval, Bernd Dehning has increased the BLM thresholds.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Thursday 20th July - morning
Monday 27th August & night
Wednesday 14:30 Fill 2011 dumped.
Saturday 26 November 2011.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Cryogenic management of the LHC Run 2 dynamic heat loads
Mon 8/8 – Tue 9/8 Stable beams #2009
Presentation transcript:

Power cut 18kV cable for EMD404/E9 is heating 23:20:54 Fire alarms in building 958 (BE) where the breaker is situated Breaker trips, but brings down also 66kV transformer EHT7 EHT7 feeds North zone loop, SPS, LHC point 1 and further the LHC loop Internal auto transfer on CERN network repowering the busbar after some 10-20 seconds 29-05-10 LHC status

29-05-10 LHC status

29-05-10 LHC status

Effects of the power cut Prevessin, SPS, Meyrin, LHC1 and LHC loop saw power outage Cryo stop in all points but LHC6 Auto transfer kicks in after a few seconds and repower Only North Zone remains without power 29-05-10 LHC status

Knock on effects Fire alarms (various, false) & ODH RF safety valves – He release 03:08 Access in UX45 was given to cryo team accompanied by firemen to reset cryo crates and ODH alarms All experiments’ magnets tripped SPS, NA, PS, Booster all down hard controls, cooling (some leaks on turning back on), ventilation, MPS vacuum SVC (Booster back up and delivering beam to ISOLDE) 29-05-10 LHC status

Status 5 a.m. All cooling stations are back up and running Some fire detection units need attention in the LHC Cryo is recovering Network configuration is still in the back-up state, the faulty cable/breaker is still off (investigations will take place) It seems we can run the machines in this configuration (MP7 line can take 30MW and we were using ~26MW before the cut) 29-05-10 LHC status

LHC Power cut induced trip of all sectors occurred at 23:20:43. There was no beam in the machine. Ramp down from 3.5 TeV had just started The RB circuits were at 5786A when they tripped Power cut appear to last for ~ 10sec Valves in, pumps, gauges off restarted by piquet, valves still in 29-05-10 LHC status

LHC recovery Power cut caused 3 trips that require further investigation RB.A45 (MB.B21R4) : heater discharge RB.A81(MB.C32L1) : heater discharge MQ.25L1 : Only 1 of 2 heaters fired?! All Switches now closed and QPS reset for all circuits Awaiting cryo conditions and power permit from EPC EPC have ~20 circuits that need attention Access required for vacuum gauge on MKI8 MKI8 power supply access may be required Access system: LHC Access system is operational has one 48V power supply warning 29-05-10 LHC status

Cryogenics – summary 1/2 P18 P2 P4 QSCB compressor station for 4.5 K and QSCCB upper compressor station for cold compressors Full stop on whole installation Effected sector 12 P2 QSCCA compressor station for 4.5K fridge and full stop on whole installation Full stop on cold compressor station Effected sector 2-3 P4 QSCCA compressor station for upper compressor station for cold compressors Effected sector 3-4 29-05-10 LHC status

Cryogenics P4 QSCB compressor station for 4.5K fridge and QSCCB upper compressor station for cold compressor station Effect sector 4-5 P6 CS and CM for both sectors P8 QSCCB upper compressor station for cold compressor station Full stop for cold compressor station Effected sectors 7-8 and 8-1 At least 24 hours recovery. Should be back ~ midnight on Saturday. All other sectors in shadow of this sector. 29-05-10 LHC status