Building your Capability for Change

Slides:



Advertisements
Similar presentations
Page 1 Capability Business Benefit Business Risk KEYBA Capabilities: Benefits V Risks Facilitation of Decision making Getting the right people together.
Advertisements

The Change Equation© Imaginist /7/2010 Introducing the INPACT Assessment Process The Change Equation How to manage complex change projects – and.
Introducing INPACT Integrated Process and Culture Transformation.
Capability Maturity Model (CMM) in SW design
Leadership Development Programme. Presenters today Brad Bamfield –
© Imaginist 2011 THE CHANGE EQUATION Building your Capability for Change Peter Duschinsky Managing Director, The Imaginist Company.
Organisational Change Management Services: Insight and Capabilities
Developing a Partner Reward Strategy – to build competitive advantage Peter Scott Consulting
From Conformance to Performance: Using Integrated Risk Management to achieve Organisational Health Ms Stacie Hall Comcover National Manager.
Building the case for change Workforce Academy. Building blocks of change establishing the case for change assessing readiness for change building sponsorship.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 3 Project Management for Strategic Goal Achievement.
Quality Assurance. Identified Benefits that the Core Skills Programme is expected to Deliver 1.Increased efficiency in the delivery of Core Skills Training.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
CSZ QUANTUM LEAP – Vic Falls Peter Doona Finance Director BAT Zimbabwe.
UKSMA 2005 Lessons Learnt from introducing IT Measurement Peter Thomas –
INPACT Integrated Process and Culture Transformation Find out how our INPACT consultants could save you £000s.
Using the CMMI in small Organisations Stephen Fletcher PAS Ltd, UK.
Kathy Corbiere Service Delivery and Performance Commission
© Project One Consulting Limited All rights reserved. 0 Introduction to Project One Slides.
Introducing INPACT Integrated Process and Culture Transformation.
Leadership Development Information Pack For Managers 2016 Hampshire Workforce Development, Corporate Shared Services.
CHANGE READINESS ASSESSMENT Measuring stakeholder engagement and attitude to change.
Leading Nottingham Programme update to ACOS 7 September 2010 Angela Probert Director of HR and Organisational Transformation Contributions from Lisa Sharples.
Creating Positive Culture through Leadership (Recovery Orientation) Jennifer Black.
The Denison Organizational Culture Model & Link to Performance
Monitoring & Evaluation Capacity Strengthening Workshop WORKSHOP INTRODUCTION AND OVERVIEW.
2 What’s in this presentation? We are seeking the board’s approval and advice on beginning a programme of work on culture and leadership across our trust.
Project Management Finals Lesson 1 - Principles - Techniques - Tools.
DevOps: Critical Success Factors in Accelerating Adoption
Winning for customers!.
How to manage complex change projects – and succeed!
Strategic Management Lecture 5 - Analysing Resources, Capabilities and Core Competences: Stakeholder Analysis, Organisational Purpose and Organisational.
5 steps to align your talent strategy to the organisational strategy
SAMPLE Drive Engagement Through Interdepartmental Collaboration
Project Human Resource Management
BANKING INFORMATION SYSTEMS
IT Governance at the SCO
THE CONCEPTUAL FRAMEWORK
Identify the Risk of Not Doing BA
Building the foundations for innovation
Presentation By: Rick Hutchins Date: Feb 3 and 4, 2011.
Implementing the NHS KSF Action Planning and Surgery Session
Software Engineering (CSI 321)
Ulrich’s model of HR.
Collective Impact Fall 2017.
Analyst’s introduction to post-merger integration in telecommunications
Collective Impact Fall 2017.
Chapter 16 Implementing HR Strategy: High-Performance Work Systems
Change Management.
TSMO Program Plan Development
NASSCOM India Leadership Forum 2008
Managing Change and Other Keys to Successful Implementation
Eurostat Quality Management (in the ESS context)
Wellingtone PMO Practitioner
in Construction Industry
Where is Your Organization on the Accessibility Maturity Scale
YOSELP 13th and 14th November 2012
Transforming organisations through an
High Performance Work Systems (HPWS)
SAIs FIGHTING CORRUPTION – INTOSAINT STRATEGY
NASSCOM India Leadership Forum 2008
Creating High-Performance Work Systems
TOTAL QUALITY MANAGEMENT
Scotland’s Digital Health and Care Strategy
Building your Capability for Change
Creating High-Performance Work Systems
Anna Gaughan Centre for Local Governance 26th March 2008
Experienced Headteacher Development Programme
Presentation transcript:

Building your Capability for Change THE CHANGE EQUATION Building your Capability for Change Peter Duschinsky Managing Director, The Imaginist Company

The Purpose of this presentation To: Examine what makes an organisation good at managing change Introduce the key models and tools in the Change Equation methodology Develop the concepts of: Change Readiness and Capability for Change Show how the Change Equation can be incorporated into your standard practices: at project level - to deliver consistently improved project outcomes at programme level – to deliver Capability for Change into the organisation as a key outcome

70% of projects fail to deliver the planned benefits

Internal Change Programmes fare no better The Harvard Business School tracked the impact of change efforts among the Fortune 100 and found that only 30% produced a positive bottom-line improvement… A survey of change programmes in 400 European organisations quoted by Prof. John Oakland, Emeritus Professor, Leeds University Business School found that: 90% of change programmes faced major implementation problems Only 30% delivered measurable business improvements A CIPD survey of 800 executives found that reorganisations failed to deliver real improvement in performance in 40% of cases

What makes an organisation good at managing change? Are there characteristics we can look out for? Strong, visible, empowering, leadership Clearly articulated and shared vision Attention paid to supporting core values High level of trust between managers and staff – decision-making devolved wherever possible People able to give priority to new initiatives – overload issue managed well Innovation encouraged and well managed Good communication between departments Collaboration with customers and suppliers Adherence to standard ways of doing things HR benefits and rewards aligned to business objectives

What makes an organisation good at managing change? Does your organisation have these characteristics? Then you are likely to have: High level of involvement and commitment Low resistance to change Resilience in the face of challenges Able to bring in changes rapidly and effectively in response to need Capability for Change

Capability for Change “Stock of capability - Attention and resources focused on people and processes, developing the organisation’s capability and resilience” (Rebecca Henderson, Harvard Business School) Resilience: “The attitudes, skills and strengths, that enable individuals, and teams to thrive within organisational change” (The Taylor Clarke Partnership) A Capability for Change is crucial if you want to respond to the accelerating pace of change and rising levels of business complexity But it erodes through natural entropy and neglect, so requires continual investment and maintenance Any Change / Transformation Programme needs this to be part of its core deliverables, but many don’t The Change Equation provides the tools you need

The Principles behind the Change Equation The Change Equation is based on 3 key contentions: Projects fail when the complexity of the project exceeds the capability of the organisation to cope The changes needed in a complex project cannot be achieved within its lifecycle A conventional ’command & control’ approach to management of complex change projects will not achieve consistently successful outcomes Let’s apply these…

Contention 1 “Projects fail when the complexity of the project exceeds the capability of the organisation to cope” Management typically: Underestimates the complexity of its projects Overestimates the capability of their organisation So if we want to be able to predict success or failure, we need to measure project complexity and organisational capability We do this by undertaking a Change Readiness Assessment

Change Readiness Assessment The Change Readiness Assessment (CRA) comprises: Stakeholder interviews, review of project documentation, analysis, senior management team workshop, report & recommendations It allows us to: identify the underlying causes of low and negative ROI on projects quantify the barriers to success predict the success or failure of projects deliver a Route Map and Action Plan to help clients gain ownership of the risks and improve performance Undertaking a CRA at the planning stage will improve a project’s outcomes Integrating CRA into your standard project planning process will deliver consistently improved project outcomes

Change Readiness Assessment We use a number of key models and tools We will come back to these… Organisational Culture Evolution model Process Management Capability Maturity model Capability/Complexity Indicator Exponential Complexity tool

Contention 2 “The changes needed in a complex project cannot be achieved within its lifecycle” The actions needed to achieve and embed behaviour change usually have to be linked to a wider programme Building these into a Change (or Transformation) Programme will enable the development of an organisation’s Capability for Change The Change Equation principles provide the framework The CRA Route Maps and Action Plans provide the content

Contention 3 “A conventional ’command & control’ approach to management of complex change projects will not achieve consistently successful outcomes” Conventional change management interventions attempt to impose change…so people give up, fall back on ‘what’s in it for me’ and the change project fails   In a complex project, newly emergent ways of working and new forms of organisation need to be recognised, nurtured and embedded You need to employ project and programme managers with the right skill-sets to achieve this

Integrating the Change Equation into standard practice Audit Undertake CRAs on selected projects Stakeholder face-to-face interviews Analyse Identify and quantify key common barriers Adapt methodology, terminology Integrate CRA into standard project management practice Change Equation principles into programme architecture Implement Employ project and programme managers with right skill-sets Consistent improvement in project outcomes Capability for Change

Change Readiness Assessment: Models and tools Organisational Culture Evolution model Process Management Capability Maturity model Capability/Complexity Indicator Exponential Complexity tool

Change Readiness Assessment: Models and tools Process Management Capability Maturity model Capability/Complexity Indicator Exponential Complexity tool Organisational Culture Evolution model

Assessing an Organisation’s Culture 1 2 3 4 5 6 7 8 9 Levels of organisational culture ORGANISATION ‘External’ Focus: The organisation’s needs and direction Systems and processes Efficiency THE INDIVIDUAL ‘Internal’ Focus: Culture People’s perceptions, attitudes, motivations, aspirations Effectiveness Point of balance

Organisational Culture Evolution Model EXTERNAL INTERNAL Structuralist 2 1 Pragmatist/Anarchic 3 Dialectic Aligned 4 5 Pragmatist/Aligned 6 Empiricist Imaginist 7 9 Pragmatist/Empowered 8 Systemist

Organisational Culture Evolution Model EXTERNAL INTERNAL 8 Systemist Imaginist 7 6 Empiricist 5 Pragmatist/Aligned 9 Pragmatist/Empowered 1 Pragmatist/Anarchic Structuralist 2 3 Dialectic Aligned 4

Organisational Culture Evolution Model EXTERNAL INTERNAL 8 Systemist Imaginist 7 6 Empiricist 5 Pragmatist/Aligned 9 Pragmatist/Empowered 3 Dialectic Aligned 4 1 Pragmatist/Anarchic Structuralist 2

Organisational Culture Evolution Model EXTERNAL INTERNAL 8 Systemist Imaginist 7 6 Empiricist 5 Pragmatist/Aligned 9 Pragmatist/Empowered Structuralist 2 Aligned 4 1 Pragmatist/Anarchic 3 Dialectic 3 Rationalist

Organisational Culture Evolution Model EXTERNAL INTERNAL 8 Systemist Imaginist 7 6 Empiricist 5 Pragmatist/Aligned 9 Pragmatist/Empowered Structuralist 2 Aligned 4 1 Pragmatist/Anarchic 3 Dialectic

Organisational Culture Evolution Model EXTERNAL INTERNAL 8 Systemist Imaginist 7 6 Empiricist 5 Pragmatist/Aligned 9 Pragmatist/Empowered Structuralist 2 1 Pragmatist/Anarchic 3 Dialectic 4 Aligned

Organisational Culture Evolution Model Where are you now? Organisational Culture Evolution Model EXTERNAL INTERNAL 8 Systemist Imaginist 7 6 Empiricist 9 Pragmatist/Empowered Structuralist 2 1 Pragmatist/Anarchic 3 Dialectic Aligned 4 5 Pragmatist/Aligned

Where do you need to be? Where are you now? 8 7 Systemist Imaginist 4 EXTERNAL INTERNAL Structuralist 2 1 Pragmatist/Anarchic 3 Dialectic Aligned 4 5 Pragmatist/Aligned 6 Empiricist Imaginist 7 9 Pragmatist/Empowered 8 Systemist

Assessing an Organisation’s Process Management Capability Where are you? 1. Initial Ad hoc process Chaotic 2. Managed Repeatable process Controlled environment 3. Defined Standard process Consistent Execution 4. Quantitatively Managed Measured process Quality and Productive Improvement 5. Optimising Effective process Continuing Improvement Software Engineering Institute Where do you need to be? What’s stopping you?

The Organisational Capability Indicator

How should we measure complexity? LOW Complexity HIGH ‘Developmental’ Apply management improvement techniques to “make it work better” ‘Transitional’ Replace one system or process with another ‘Transformational ’ Scrap whole operation/business and start again e.g. ‘Transformational’ Scrap whole operation/business and start again Major impact on people ‘Transitional’ Replace one system or process with another Some impact on people ‘Developmental’ Apply management improvement techniques to “make it work better” Little impact on people Complicated = not simple, but outcomes are ultimately knowable Complex = not simple and outcomes are never fully knowable

Terminal 5 Over 28,000 lost bags, 700 cancelled planes and more than 150,000 disrupted passengers “The Terminal 5 debacle is a national disgrace” Daily Mail, 14 April 2008

So what went wrong? Shortage of staff car parking spaces Only one employee security checkpoint operating Some staff unable to log on to the computer system Hand-held communication software running slow No managers on the ground to re-allocate work Shortage of bar-reading storage bins Baggage handling staff late in arriving 60 staff queue to get into terminal 6am: 3 planes leave without bags Bags pile up, unattended By midday 20 flights cancelled 4pm: baggage conveyor belt grinds to a halt, BA suspends all baggage check-in

“The Perfect Storm” In 2004, HP's project managers knew all of the things that could go wrong with their ERP centralisation programme. But they just didn't plan for so many of them to happen at once. The project eventually cost HP $160 million in order backlogs and lost revenue—more than five times the project's estimated cost. Gilles Bouchard, then-CIO of HP's global operations, says: "We had a series of small problems, none of which individually would have been too much to handle. But together they created the perfect storm.” Complexity is exponential!

Complexity is Exponential ”We live in a world that can change exponentially – but we have brains that are hardwired to plot things out linearly - the software in our brains compels us to think about progressions as being simple arithmetic ones So as a species, and a society, we deal poorly with uncertainty in non-linear domains.” Prof Albert Bartlett, University of Colorado That’s one good reason why management typically under- estimates the complexity of projects!

How should we measure complexity? ‘Transformational’ Scrap whole operation/business and start again Major impact on people ‘Transitional’ Replace one system or process with another Some impact on people ‘Developmental’ Apply management improvement techniques to “make it work better” Little impact on people LOW Complexity HIGH Apply management improvement techniques to “make it work better” ‘Transformational ’ e.g. Complexity Factor Not simple - needs some project management A complicated project – needs an experienced project manager Your project is too complex – break it down into separate projects and employ a programme manager Simple project A complex project – needs a dedicated project team Exponential Complexity Model Complexity Factor Exponential Complexity Model

The Exponential Complexity Tool Which 3 factors? They must be: Common to all projects Quantifiable by stakeholders Good predictors of the complexity of a project The Exponential Complexity Tool uses the following 3 factors: Number of people or Stakeholders involved (More people = more complex = higher risk) Number of business activities or Processes affected (More ambitious = more complex = higher risk) Elapsed Time to implement (in months) (Longer to implement = more complex = higher risk)

The Exponential Complexity Tool Think about a project you are familiar with Where on the scale do you think you are? Now do the numbers: Stakeholders x Processes x Time Think about a project you are familiar with Where on the scale do you think you are? 20 200 18 mths Complexity Factor Not simple - needs some project management A complicated project – needs an experienced project manager Your project is too complex – break it down into separate projects and employ a programme manager Simple project A complex project – needs a dedicated project team Exponential Complexity Model 72,000

Combining Capability and Complexity

Deliverables: Action Plan Organisation Component Implication Action required Management Culture The lack of information-sharing, alignment and empowerment will jeopardise the success of the project. At the very least it will mean poor take-up and a lower than planned level of benefits. A programme of interaction and dialogue across the organisation is urgently needed to improve the management culture. This needs to include increasing trust, see below. Process Capability The organisation’s process capability is poor. This means that any projects which seek to standardise and improve processes to achieve greater efficiency will be very difficult to achieve. Consider carrying out a programme to raise the levels of process capability ahead of implementing the project or using the project itself to inject the necessary disciplines. In this case it is crucial for the Board to make compliance to the new processes mandatory.

Deliverables: Route Map INTERNAL (Individual) Structuralist 2 1 Pragmatist/Anarchic 3 Dialectic Aligned 4 5 Pragmatist/Aligned 6 Empiricist Imaginist 7 9 Pragmatist/Empowered 8 Systemist EXTERNAL (Organisation) You are here You need to be here

Summary The Change Equation methodology is designed to be integrated into standard practice: at Project level – CRA ensures Change Readiness and deliver consistent improvement in change project outcomes at Programme level – Change Equation principles, Route Maps and Action Plans provides framework and content to deliver organisational Capability for Change as a key outcome (NB this needs to be coupled with strong, visible, creative leadership – we hope you agree that’s a given…) If you think this approach might be of value to your organisation, please contact us

Peter Duschinsky Managing Director The Imaginist Company Email: peterd@imaginist.co.uk Tel: 020 8201 1478 Mob: 07801 802 571 Web: http://www.imaginist.co.uk ‘The Change Equation’ is available from Amazon.co.uk