Meeting Overview Slides

Slides:



Advertisements
Similar presentations
John Consiglio The Cooper Union February 24, 2009 Using Hardware-in-the-Loop Simulations to Improve EPA Emissions Testing.
Advertisements

EG1003: Introduction to Engineering and Design Software for Engineers.
MSD P15280 RIT HOT WHEELZ TEST BENCH. AGENDA ❖ Review Problem Definition Material ❖ Review System Design Material ❖ Sub-System Design Review ▪Motor.
Determination of Powertrain Performance of Hybrid Electric Vehicles Presented by: Germany, Korea EVE-15 meeting June 8, 2015.
Specifying and Sizing Control Valves A design equation used for sizing control valves relates valve lift to the actual flow rate q by means of the valve.
ENERGY INSTITUTE Battery Research Group NiMH Battery Pack for HEV Cem Kaypmaz 2008 İstanbul.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute.
P16221 – FSAE Shock Dynamometer System Level Design Review September 29, 2015.
Doc.: IEEE /840r2 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Update of SAE J2908 Activities Mike Duoba Argonne National Laboratory 19 October
WLTP validation test results for BEV(i-MiEV) & OVC-HEV (Prius PHV)
1 ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 6 : PUMPS.
Doc.: IEEE /366r0 Submission May 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
API 19 CI Chemical Injection Devices for Downhole Applications
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
NMHIMSS Meet the Board & Committees May 26th, 2016
FAA VoIP- Interoperability Event Summary Report
Laboratory 1: Software for Engineers
Coexistence Lessons Learned – Update
Hybrid Transaxle.
Fluid Power systems Zonal hydraulics - industrial case 10 October 2017
WECC Regional Standards Update
API SC 10, Work Group 3 Update:
Updated Sections of the ACCL and WCCL OMs (2016)
Task Group API 19SS Sand Screens
Annual general meeting
Lecture Objectives: Continue with cooling towers
Part 1 - Internal Resistance Part 2 - Cell Discharge Performance
By: Addison Duhon, Alex Lehocky, Elliot VanLandingham
ME444 ENGINEERING PIPING SYSTEM DESIGN
IEEE s: ESS Mesh Networking Task Group
Software for Engineers
TGs Process Date: Authors: January 2005 January 2005
BRAKE PARTICLE EMISSIONS
CEOS Work planning Steven Hosford, ESA/CNES, CEO
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
Software for Engineers
TGs Process Date: Authors: July 2005 July 2005
TGs Montreal Closing Report
[place presentation subject title text here]
B. Munkhbayar BEEC/SCEA/MUST
Cryogenic System Commissioning Summary Report
Lecture Objectives: Cooling towers and modeling Project 1.
doc.: IEEE <doc#>
[place presentation subject title text here]
November technical stop activities:
NERC Reliability Standards Development Plan
July 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda July 2018 Plenary] Date Submitted:
TGs Process, July Date: Authors: July 2006 July 2006
April 2009 doc.: IEEE /xxxxr0 May 2010
SAE battery safety standards committee UPDATE January 23, 2019
NERC Reliability Standards Development Plan
EC Update on LMSC Policy and Procedures
IEEE OmniRAN TG July 2014 F2F Meeting
Discussion Points API RP 17A Task Group Members
based on WP29/2018/157, SLR-28-09rev1, SLR-28-12
Reg 85: Measurement of Net Power
April 2009 doc.: IEEE /xxxxr0 May 2010
IEEE r: Fast BSS Transition TG Agenda
EPRI Truck & Bus Meeting SAE Medium and Heavy Duty Vehicle
SAE Medium/Heavy Duty Task Force Update
EV Power Transfer using Three-phase Capable Coupler
DER Growth Scenarios and Load Forecasts Working Group
Liaison Report to Date: Authors: January 2013
IEEE s: ESS Mesh Task Group
600 V HIGH VOLTAGE SOLUTION η μ.
Software for Engineers
Software for Engineers
Egyptian Atomic Energy Authority (EAEA), Egypt
Presentation transcript:

Meeting Overview Slides SAE J2907 Performance Characterization of Electrified Powertrain Motor-Drive subSystem Meeting Overview Slides for J2907 Task Force John M. Miller 13 July 2017 Company Logo Here

J2907 Task Force Agenda SAE Anti-trust Statement, Patent Disclosure, IP Policy, and Transparency Statement Welcome Review of the SAE Anti-Trust, Patent Disclosure, IP Statement, and Transparency Statement Review of the Minutes from Last Meeting (11 May 2017) Liaison Activities Updated SAE Hybrid/EV Technical Standards Committee on 1st field trial results J2907 RP Field Trials TM4 HSM60 (85 kW, 10,000 rpm ETDS) completed 23 June 2017 UQM PPPro135 (135 kW, 7700 rpm ETDS) pending for late July or early August 2017 Old Business J2907 RP mark-up copy must be original SAE document New Business Scheduling 2nd field test at ORNL NTRC-2 Vehicle Systems Integration Lab Due to ORNL top management change 1 July & personnel changes no 3rd field test Next Meeting – 2nd Thursday of each month at 2pm EST Meetings will now focus on TIR to RP standard SAE J2907 in committee

J2907 Field Trials – HSM60 ORNL DYNAMOMETER FACILITY AVL 250 kW, 12,000 rpm unit with TM4 HSM60 ETDS installed Dyno lab chiller consists of WEG loop, heat exchanger, cooling tower loop Coolant to power controller, then motor, on to heat exchanger and pump SAE J2907 in committee

J2907 Draft RP Dyno Cell ORNL NTRC-2 Dyno Cell dSpace console SAE J2907 in committee

J2907 Draft RP Edits Replace Figure 4 - Example laboratory dynamometer test of ETDS functional diagram for bench dynamometer test SAE J2907 in committee

J2907 Draft RP edits Initialization: 4 hour soak at 25 +/-5oC Manufacturer specifies Udc, np, Pmax, n30, and P30max. This is more general case. Precondition for 5 minutes at 20% max power then commence maximum power tests at speed np, np-2%, np-2% SAE J2907 in committee

J2907 Field Test Results for HSM60 TM4 HSM60 results The ORNL NTRC-2 dynamometer uses a completely closed coolant loop: 1- the WEG loop for series connected power controller and motor to heat exchanger, and 2- a city water loop closed via a high capacity cooling tower on premises. Coolant temperatures were measured by not flow. Nominal voltage for maximum torque, maximum power, and maximum 30minute power tests: 445 Vdc Excel file was used as a scratch pad to determine voltage, speed, and power ranges SAE J2907 in committee

J2907 Field Test Results for HSM60 TM4 HSM60 Dynamometer Laboratory Graphs: Max Torque Nominal voltage for maximum torque, maximum power, and maximum 30minute power tests: 445 Vdc dSpace acquisition system Max torque at 50 rpm (10s averaged value) and plot Power = 1.463kW Torque = 277.033 Nm SAE J2907 in committee

J2907 Field Test Results for HSM60 TM4 HSM60 Dynamometer Laboratory Graphs: Max Power Nominal voltage for maximum torque, maximum power, and maximum 30minute power tests: 445 Vdc dSpace acquisition system 4500rpm 10 sec averages Power = 116.611 Torque = 247.451 Speed = 4500.1 rpm 4410rpm 10 sec averages Power = 115.981 kW Torque = 251.146 Nm Speed = 4409.9 rpm 4590rpm 10 sec averages Power = 115.255 kW Torque = 239.786 Nm Speed = 4589.9 rpm SAE J2907 in committee

J2907 Field Test Results for HSM60 TM4 HSM60 results Nominal voltage for maximum torque, maximum power, and maximum 30minute power tests: 445 Vdc Excel file was used as a scratch pad to determine voltage, speed, and power ranges SAE J2907 in committee

J2907 Field Test Results for HSM60 TM4 HSM60 Dynamometer Laboratory Graphs: Max 30 Minute Power Nominal voltage for maximum torque, maximum power, and maximum 30minute power tests: 445 Vdc dSpace acquisition system 8000rpm Max Power for 30 min (30 points, 10sec averages) SAE J2907 in committee

J2907 Field Test Results for HSM60 TM4 HSM60 Dynamometer Laboratory Graphs: Max 30 Minute Power HSM60 production controls - unmodified No attempt was made to compensate HSM60 controls so that dyno feedback torque would be constant. SAE J2907 in committee

J2907 Field Test Results for HSM60 TM4 HSM60 Dynamometer Laboratory Graphs: Max 30 Minute Power HSM60 production controls - unmodified No attempt was made to compensate HSM60 controls so that dyno feedback torque would be constant. SAE J2907 in committee

J2907 Field Trial Results for HSM60 Excerpts from J2907 Draft RP communications sheet The procedure for maximum (net) power requires validation of maximum power by testing points below and above the recommended speed setting. Those results are compiled separately: Documented test results per J2907 draft RP communications sheet Speed 4500.7 4410.0 4590.5 np +/-2% Torque 249.05 251.46 241.2 Pmax 117.36 116.11 115.00 Deviation -1.07 -2.01 Acceptance 4% max deviation Declared Measured Deviation (%) Maximum torque 263 Nm 50 rpm 277 N/A Maximum (Net) Power 114.4 kW 4500 117.36 +2.95 Maximum 30min Power 62.4 8000 64.4 +3.22 SAE J2907 in committee

J2907 Draft RP Edits Next Steps Task Force review of J2907 RP edits based on 1st Field Test Complete 2nd Field Test with UQM PP135 and updated procedure Review 2nd Field Test with Task Force Finalize the J2907 draft RP (only SAE copy can be updated) Submit to SAE for balloting SAE J2907 in committee

Wrap-up Adjourn meeting at:__pm EST Next Meeting: 2nd Thursday of each month at 3pm EST SAE J2907 in committee