Technical Budgets Mass Power Pointing knowledge and accuracy

Slides:



Advertisements
Similar presentations
Corner Raft Conceptual Design Corner Raft Conceptual Design Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
Advertisements

Mech Systems Proposed EMI Modifications Marc Campell 9/2/03.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 7.1 Stress Analysis 1 GLAST Large Area Telescope:
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
LAT-PR Section 44-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Mechanical Systems Martin Nordby Stanford Linear Accelerator.
MAXIM Power Subsystem Diane Yun Vickie Moran NASA/GSFC Code (IMDC) 8/19/99.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
Eduardo do Couto e Silva - ATC/LM Colloquium, June How many neutralinos are there? Expansion of universe Depletion of neutralinos Creation of neutralinos.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
National Aeronautics and Space Administration November 23, Gamma-ray Large Area Space Telescope (GLAST) Kevin Grady, Project Manager Steven Ritz,
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section 4.4 Heat Pipe Design and Analysis1 GLAST Large Area Telescope: Mechanical.
Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 2.2 Budgets & Metrics 1 GLAST Large Area Telescope:
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
Agenda for Face-to-Face IDT Meeting (1/4) Date: March 19 and 20 Place: Orange Room, SLAC March 19 (Tuesday) 9:00-9:10am T. Kamae; Charge for the Face-to-Face.
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
XRT SOT Alignment DeLuca With comments from Tarbell & Metcalf 21-Jan-2006.
Be P16102 Constrain Subsystems House Internals Provide Access Mount components securely Stow Solar Panels Gather Solar Energy Expose Panels before Deployment.
ISUAL System Design H. Heetderks. PDR 31 August 2000NCKU UCB Tohoku ISUAL System Design H. Heetderks 2 ISUAL Operations Overview.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
GLAST Large Area Telescope:
Tracking Students Throughout the Scholarship Season
GLAST Large Area Telescope:
I&T&C Organization Chart
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
1. Introduction and Overview
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
CubeSat vs. Science Instrument Complexity
Mini Tower Preliminary Results
LAT Thermal Systems Analysis
EagleSat 2 – Mission and Development Overview
GLAST Large Area Telescope
GLAST Large Area Telescope
March ’05 Face to Face Meeting Introduction
Introduction and Overview
GLAST Large Area Telescope:
Overview Cost to Complete
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
Face-to-Face IDT Meeting Session 1 Observation Strategies and EGRET Experience S. W. Digel March 19, 2002 SLAC.
GLAST Large Area Telescope:
Tracker to Tracker Clearance Reduction Contributors
Presentation transcript:

Technical Budgets Mass Power Pointing knowledge and accuracy T. Kamae F2F IDT 3/19/02 Technical Budgets Mass Power Pointing knowledge and accuracy Data downlink Fairing envelope Orbit (Heat)

Mass Budget (1) - Launcher, Observatory, S/C, LAT, GBM - T. Kamae F2F IDT 3/19/02 Mass Budget (1) - Launcher, Observatory, S/C, LAT, GBM -

Mass Budget (2) - Current Status of LAT Mass - T. Kamae F2F IDT 3/19/02 Mass Budget (2) - Current Status of LAT Mass -

Mass Budget (3) - Center of Mass above the S/C Interface - T. Kamae F2F IDT 3/19/02 Mass Budget (3) - Center of Mass above the S/C Interface - Max Height off the S/C interface for Center of Mass = 185mm

Mass Budget (4) - History and Release of Contingency - T. Kamae F2F IDT 3/19/02 Mass Budget (4) - History and Release of Contingency -

Mass Budget (5) - How well do we know? - T. Kamae F2F IDT 3/19/02 Mass Budget (5) - How well do we know? -

Power Budget (1) - LAT and GBM - T. Kamae F2F IDT 3/19/02 Power Budget (1) - LAT and GBM -

Power Budget (2) - Current Status and Breakdown - T. Kamae F2F IDT 3/19/02 Power Budget (2) - Current Status and Breakdown - * * ACD estimate under review May vary slightly

Power Budget (3) - History and Release of Contingency - T. Kamae F2F IDT 3/19/02 Power Budget (3) - History and Release of Contingency -

Power Budget (4) - How well do we know? - T. Kamae F2F IDT 3/19/02 Power Budget (4) - How well do we know? - Big uncertainties: Size of the radiator panels to dump the heat Heater to maintain the minimum temperature during Safehold mode Number of CPUs required for on-board data processing

Pointing Knowledge (1) - Nomenclature - T. Kamae F2F IDT 3/19/02 Pointing Knowledge (1) - Nomenclature -

Pointing Knowledge (2) - Allocation - T. Kamae F2F IDT 3/19/02 Pointing Knowledge (2) - Allocation -

Pointing Knowledge (3) - Absolute Pointing Accuracy - T. Kamae F2F IDT 3/19/02 Pointing Knowledge (3) - Absolute Pointing Accuracy -

T. Kamae F2F IDT 3/19/02 Pointing Knowledge (4)

Pointing Knowledge (4) LAT Alignment 18 March 2002 S. Ritz version 1.1 T. Kamae F2F IDT 3/19/02 Pointing Knowledge (4) LAT Alignment 18 March 2002 S. Ritz version 1.1 The total numbers of the track required for the inner- and inter-tower alignments are 2000 x 16 x 16 x16 = 8.0M tracks and 230K x 16 = 3.7M tracks, respectively. The total data size is (8.0M + 3.7M ) x 2 kB/event = 23.4 GB (2kB/event is tentative number and to be determined). Assuming 300kbps, it takes 9 days to send data to the ground. Tracker Alignment and Pointing Accuracy Eduardo do Couto e Silva and Hiroyasu Tajima SLAC February 26, 2002 (ver. 0.1) March 5, 2002 (ver. 0.2)

Data Downlink (1) - Latency - T. Kamae F2F IDT 3/19/02 Data Downlink (1) - Latency -

Data Downlink (2) - Volume - T. Kamae F2F IDT 3/19/02 Data Downlink (2) - Volume - From: Bartels, Arlin [mailto:abartels@staac-mail.gsfc.nasa.gov] Sent: Sunday, February 17, 2002 14:09 To: Steve Ritz Subject: RE: LAT IRD rev.A - final review copy prior to draft SC RFO Steve, I'm removing the TBR because I don't see the point of leaving it "unresolved". Since I'd be writing a CCR anyway at some point, either to remove the TBR or to change the number, the only reason to leave this as a TBR is to imply some uncertainty in the number being the correct one in the first.  I'm not aware of any GLAST Project plans to ask the LAT to lower the LAT output below 26 Gb/24 h, so the TBR doesn't really apply. -Arlin LAT Science gets 300kbps but may not be more.

Data Downlink (3) - Storage - T. Kamae F2F IDT 3/19/02 Data Downlink (3) - Storage -

Fairing Envelope (1) - Specification - T. Kamae F2F IDT 3/19/02 Fairing Envelope (1) - Specification -

Fairing Envelope (2) - LAT Size - T. Kamae F2F IDT 3/19/02 Fairing Envelope (2) - LAT Size -

Fairing Envelope (3) - LAT in Delta II Capsule - T. Kamae F2F IDT 3/19/02 Fairing Envelope (3) - LAT in Delta II Capsule - See next page 1-zone Radiator Cut-outs for possible S.A. launch locks Hole to accommodate Solar Array mast VCHP reservoirs GLAST rotated 45 deg to clear PAF mounting bosses Radiator Mount Bracket at 4 corners of Grid LAT with updated Radiator package, 6935 PAF, and SC stay-clear volume in the Delta-II fairing

Fairing Envelope (4) - Constraints from GBM and Star trackers - T. Kamae F2F IDT 3/19/02 Fairing Envelope (4) - Constraints from GBM and Star trackers - 1796mm ?mm 1990mm 1851mm 2743mm Radiator panel ACD+MLI+MMS stay clear Shortest clearance 12.5mm Delta-II H Fairing Star tracker FOV?

Orbit and Attitude (1) - Coordinate Systems (1) - T. Kamae F2F IDT 3/19/02 Orbit and Attitude (1) - Coordinate Systems (1) -

Orbit and Attitude (2) - Coordinate Systems (2) - T. Kamae F2F IDT 3/19/02 Orbit and Attitude (2) - Coordinate Systems (2) -

Orbit and Attitude (3) - Specification - T. Kamae F2F IDT 3/19/02 Orbit and Attitude (3) - Specification -

Orbit and Attitude (4) - Body Coordinate System - T. Kamae F2F IDT 3/19/02 Orbit and Attitude (4) - Body Coordinate System -