Scintillator HCAL: LOI issues

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

1 ALICE EMCal Electronics Outline: PHOS Electronics review Design Specifications –Why PHOS readout is suitable –Necessary differences from PHOS Shaping.
Quartz Plate Calorimeter Prototype Ugur Akgun The University of Iowa APS April 2006 Meeting Dallas, Texas.
Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
1 AHCAL answers IDAG Erika Garutti On behalf of AHCAL analysis team.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
Introduction Felix Sefkow HCAL main meeting February 14, 2006.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
 Performance Goals -> Motivation  Analog/Digital Comparisons  E-flow Algorithm Development  Readout R&D  Summary Optimization of the Hadron Calorimeter.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Time development of showers in a Tungsten-HCAL Calice Collaboration Meeting – Casablanca 2010 Christian Soldner Max-Planck-Institute for Physics.
LCG Meeting, May 14th 2003 V. Daniel Elvira1 G4 (OSCAR_1_4_0) Validation of CMS HCal V. Daniel Elvira Fermilab.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
AHCAL optimisation challenges towards a TDR Felix Sefkow ILD workshop Cracow, September 2013.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Tungsten as HCal-material for a LC at multi-TeV energies CALICE AHCAL Meeting, DESY 17 July 2009 Christian Grefe for the Linear Collider Detector Group.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
Development of a Particle Flow Algorithms (PFA) at Argonne Presented by Lei Xia ANL - HEP.
May 1-3, LHC 2003V. Daniel Elvira1 CMS: Hadronic Calorimetry & Jet/ Performance V. Daniel Elvira Fermilab.
Pandora calorimetry and leakage correction Peter Speckmayer 2010/09/011Peter Speckmayer, WG2 meeting.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
Coil and HCAL Parameters for CLIC Solenoid and Hadron-calorimetry for a high energy LC Detector 15. December LAPP Christian Grefe CERN.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
Mechanics and granularity considerations of a Tile hadronic calorimeter for FCC hh barrel Nikolay Topilin/Dubna+ Sergey Kolesnikov/Dubna Ana Henriques/CERN.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Scintillator HCAL read-out and calibration Felix Sefkow TILC08 at Sendai, Japan March 4, 2008.
1 1 - To test the performance 2 - To optimise the detector 3 – To use the relevant variable Software and jet energy measurement On the importance to understand.
Calice Meeting Argonne Muon identification with the hadron calorimeter Nicola D’Ascenzo.
1 IWLC 2010 Geneva Oct.’10David Ward Tests of GEANT4 using the CALICE calorimeters David Ward  Electromagnetic particles (, e) were used to understand.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
Imaging Hadron Calorimeters for Future Lepton Colliders José Repond Argonne National Laboratory 13 th Vienna Conference on Instrumentation Vienna University.
1 Plannar Active Absorber Calorimeter Adam Para, Niki Saoulidou, Hans Wenzel, Shin-Shan Yu Fermialb Tianchi Zhao University of Washington ACFA Meeting.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
W Prototype Simulations Linear Collider Physics & Detector Meeting December 15, 2009 Christian Grefe CERN, Bonn University.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
PPAC Jonathan Olson University of Iowa HCAL November 11-13, 2004.
A Study on Leakage and Energy Resolution
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Felix Sefkow DESY LDC at Vienna November 17, 2005
SiD Calorimeter R&D Collaboration
Preparation for CERN test beam
CALICE scintillator HCAL
Status of Ecal(s) for ILD
(My personal) CALICE Report
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
Towards a realistic Scintillator HCAL with SiPM read-out
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
CMS ECAL Calibration and Test Beam Results
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Plans for checking hadronic energy
Rick Salcido Northern Illinois University For CALICE Collaboration
Reports for highly granular hadron calorimeter using software compensation techniques Bing Liu SJTU February 25, 2019.
Michele Faucci Giannelli
Status of CEPC HCAL Optimization Study in Simulation LIU Bing On behalf the CEPC Calorimeter working group.
Presentation transcript:

Scintillator HCAL: LOI issues Felix Sefkow ILD meeting Seoul, Korea, 17. February 2009

Felix Sefkow Seoul, 16. February 2009 AHCAL Felix Sefkow Seoul, 16. February 2009

Cost drivers, optimization The main cost driving parameters are The choice of the absorber material The overall depth in terms of interaction lengths L The longitudinal sampling s The transverse segmentation d The dependence of PFLOW performance on geometrical parameters has been comprehensively studied with Pandora for stainless steel Near plateau region for L and d Shallow dependence for s, seems to be sensitive to algorithm Other materials: brass mechanically less attractive, but back-up if µ too large Tungsten: probably too costly; study just started, not for LOI AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 Optimization studies AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 R&D status CERN FNAL The first generation ‘physics prototype” is running in test beams since 2006, to be completed this summer Robust and stable operation, low noise, no ageing (< 0.5 permille) Test beam analysis Done: calibration, e.m. linearity, hadronic response, resolution, longitudinal profiles  support Geant4 based Pandora studies Still to come: shower radius, 2-particle separation, E+HCAL combined analysis, substructure and weighting  ~ 2011 AHCAL Felix Sefkow Seoul, 16. February 2009

(Birks law, pulse shape) Test beam results Essential: Corrections to data (temperature) and Monte Carlo (Birks law, pulse shape) π e Ongoing analysis A.Kaplan Ongoing analysis B.Lutz AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 R&D plans 2nd generation technical prototype underway Embedded electronics New ASICs: power pulsing, auto-trigger, zero-suppr. + digit. Several options for scint-SiPM/MPPC-electronic coupling New operational challenges Timeline PCB with tiles in March Full layer and e.m. tower end 2009 HCAL 2011 L.Raux 2m M.Reinecke K.Gadow AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 Dead zones Detailed implementation of sector boundaries in Mokka Too conservative with respect to most recent active layer design Replace aluminum frame by srews, 99% filling possible Variations simulated, not too critical for PFLOW Space for external electronics at barrel end face, between cable routes; can be made small, like ECAL M.Reinecke AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 Background Radiation damage: Only issue: neutrons in the very inner region of the end caps Radiation hardness subject of photo-sensor R&D (sLHC) Scintillator not affected Occupancy: Relevant for DAQ front end buffer depth and band width Would like to study gamma gamma and mini-jet events I recall from 2004 studies: 1 event every 3rd BX with 6 GeV in main calorimeters AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 Calibration Temperature-induced variations of photo-sensor: Monitor: single ph.e peaks Control: compensate by adapting voltage Possible long-term variations of light yield Scintillator ageing, optical coupling instability,..? Use track segments in hadron showers F.Simon AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 ILD simulation study Use algorithm developed on test beam data 1000 hits / cell  50 years @ 500 GeV  10 days @ 90 GeV 1000 hits / m2  2 weeks @ 500 GeV High granularity: insensitive to statistical cell to cell variation Need clever averages to control trends And good design, optical stability S.Lu, F.Simon 9 tracks AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 Support structure K.Kschioneck K.Gadow Following FEM calculations, support should be at 4 and 8 o’clock HCAL stands on the tip! AHCAL Felix Sefkow Seoul, 16. February 2009

This and following slides: Integration, step 1 This and following slides: K.Gadow AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 Integration, step 2 AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 Integration, step 3 AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 Integration, step 4 AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 ECAL integration, step 1 AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 ECAL integration, step 2 AHCAL Felix Sefkow Seoul, 16. February 2009

Felix Sefkow Seoul, 16. February 2009 Conclusion Answers to IDAG questions reasonably well prepared Well motivated design, clear R&D path Status of LOI draft: still a lot to do AHCAL Felix Sefkow Seoul, 16. February 2009