Technical Management Processes

Slides:



Advertisements
Similar presentations
Customer Engagement Guidance Technical Decision Maker Business Decision Maker Messaging Admin Telephony Admin Approach Resources Exchange POC in a box.
Advertisements

Overcoming Customer Constraints on Requirements Documents Presented by: Robert Smole Presented by: Robert Smole November 5, 2008 Sub-Optimization of Systems.
INCOSE Presentation San Francisco Chapter 13 October 2009 Mapping CMMI to Systems Engineering Adrienne Friedman.
College of Continuing Education Systems Engineering Non-credit Certificate.
Kai H. Chang COMP 6710 Course NotesSlide CMMI-1 Auburn University Computer Science and Software Engineering Capability Maturity Model Integration - CMMI.
S Y S T E M S E N G I N E E R I N G.
Aerospace Systems Engineering
Software Process Improvement in Small Organizations A Case Study.
The Design Process. Analysis Think – what should the final design do? List customer requirements Consider constraints – balance tradeoffs Define specifications.
Capability Maturity Model Integration (CMMI). CMMI Enterprise-wide process improvement framework Focuses on processes for improved product Process areas:
1 Perform Assess Policy and Guidance Acquisition Program Improvement Model Acquisition Programs Acquisition Workforce Human Capital Strategic Planning.
IIBA Denver | may 20, 2015 | Kym Byron , MBA, CBAP, PMP, CSM, CSPO
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
INCOSE 1 st reactions. One other area that struck me has the sheer number of levels of proficiency—in ours we are going with 5 and the first one is limited.
Effective Methods for Software and Systems Integration
Software Engineering Term Paper
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Business Analysis and Essential Competencies
1 Process Engineering A Systems Approach to Process Improvement Jeffrey L. Dutton Jacobs Sverdrup Advanced Systems Group Engineering Performance Improvement.
The Challenge of IT-Business Alignment
NDIA Systems Engineering Supportability & Interoperability Conference October 2003 Using Six Sigma to Improve Systems Engineering Rick Hefner, Ph.D.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
10/16/2015Bahill1 Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous.
DOES SYSTEMS ENGINEERING HAVE TO BE DONE BY SYSTEMS ENGINEERS? by B. W. Mar and B.G. MORAIS.
Software Engineering - I
Presented to: Verification and Validation Summit By: James Daum NextGen and Operations Planning Safety Manager AJP-1900 Date: November 05, 2009 Federal.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
Requirements Development in CMMI
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
By: Date: Federal Aviation Administration Focus on the Future 8 th Annual V&V Summit 2012 John Frederick Test Standards Board Chairperson Manager, V&V.
Program Management Office ͏ Project Management
Copyright © | Trade secret and confidential Page 1 Innovative, Professional, Fact Based and Eustressed© Maruthi Quality Management Services Ptv. Ltd..,
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
MSA Orientation – v203a 1 What’s RIGHT with the CMMI?!? Pat O’Toole
Prepared by Amira Selim 31 st October 2009 Revised by Dahlia Biazid Requirements Analysis.
SYSTEMS ENGINEERING PROCESSES IN NASA AND COMMERCIAL PROJECTS Paul Componation Kathryne Schomberg Susan Ferreira Jordan Hansen.
Driving Value from IT Services using ITIL and COBIT 5 July 24, 2013 Gary Hardy ITWinners.
Certification: CMMI Emerson Murphy-Hill. Capability Maturity Model Integration (CMMI) Creation of the Software Engineering Institute (SEI) at Carnegie.
A Comparison of CMMI & SPICE
Serving IT up with ITIL By Thane Price. IT is the laboratory’s pit crew  Goal : Make technology transparent while accomplishing valuable internal customer.
Supportability Design Considerations
DoD SE Processes (DAG section)
DT249/4 Information Systems Engineering Lecture 0
DAG CH 3 Figure 11: Weapon System Development Life Cycle
Importance of T&E Connotations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
Level - 3 Process Areas (CMMI-DEV)
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Enabling System Elements
NASA Independent Reviews -Lessons Learned-
DAG CH 3 Figure 18: Weapon System Development Life Cycle
The Design Process.
DAG CH 3 Figure 28: Weapon System Development Life Cycle
DAG CH 3 Figure 33: TPM Hiearchy
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Dr. Glenn Lamartin Director, Defense Systems Office of the Under Secretary of Defense (AT&L)
Instrument PDR Summary of Objectives
Requirements Management
Use of CMMI in an Acquisition Context Using CMMI for Process Improvement at USAF Space and Missile Systems Center (SMC) Dr. Jack R. Ferguson
8 Tech Processes Drive Acquisition
Perspectives on Transforming DT and OT Industry-Government Roundtable
Nagios with The Decision Engine Implementing Passive Checks
DAG CH 3 Figure 21: Weapon System Development Life Cycle
Requirements Development in CMMI
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Technical Management Processes Systems Engineering Operational Need Delivered Capability IOC/FOC Realization Decomposition OT&E Validated Solution Requirements Stakeholder Requirements Definition Requirements Analysis Architecture Design Technical Processes Transition Validation Verification Integration Implementation Design Product DT&E DAG CH 3 Figure 2: Systems Engineering Processes Technical Management Processes Decision Analysis Technical Planning Technical Assessment Requirements Management Risk Management Configuration Management Technical Data Management Interface Management Enables a balanced approach for delivering capability to the warfighter 8/8/2012 Pre-Decisional DT&E – Developmental Test and Evaluation OT&E – Operational Test and Evaluation IOC/FOC – Initial Operating Capability/Full Operating Capability