Rectangular Coordinates Level control in trenches

Slides:



Advertisements
Similar presentations
Drawing In One-Point Perspective
Advertisements

Construction Surveys
Basic Setting Out.
Access BDD Survey School
Gable Roof BCGCA3007B.
Gable Roof BCGCA3007B.
Surveying Chain Surveying
Gable Roof BCGCA3007B. Gable Roof Flush with no eaves Flush with raked eaves Boxed.
Profile Leveling.
Chapter 13 Site Plan Layout.
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
Presentation 26: HIP RAFTER LAYOUT.
Set out masonry structures
Harry Williams, Cartography1 Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is.
Lines Identifying Different Types of Lines. LINES There are many different types of lines. Can you think of any? vertical horizontal diagonal perpendicular.
Ordinance Survey Maps.
CONSTRUCTING A FIVE CABIN LATRINE
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
CONSTRUCTION BLUEPRINT READING
Pyramid Construction Pyramids Square Rectangle Hex Cone.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
Gable Roof BCGCA3007B.
By: Caleb VanderWal.  Mix cement  Dig hole at least 24” into the ground  Poor cement in ground with poles  Wait 2-3 days (if you don’t wait that long.
TECHNIQUES IN BASIC SURVEYING
Preparing Foundations for Cylinders & ASME Tanks
ENTC 1110 OBLIQUE PICTORIALS.
Square Pyramid (cut). Cut Square Pyramid - Problem The given views show the Front Elevation and unfinished Plan of a cut square pyramid. Draw the following.
E4014 Construction Surveying Road Construction Plans.
The Important Thing About Shapes Written by: K. Gooding.
Freehand Sketching. Draw a horizontal line about 70 mm long, and then another six lines underneath, each separated by about 10 mm.
Constructions and 3D Drawings. Constructing Perpendicular Bisectors - Perpendicular Bisectors are lines that cut each other in half at right angles.
One Point Perspective: City Drawing A Tutorial
One Point Perspective: City Drawing A Tutorial Art 1: Fall 2011 MMRoberts.
Vocabulary for the Common Core Sixth Grade.  base: The side of a polygon that is perpendicular to the altitude or height. Base of this triangle Height.
Retaining Wall Construction Building A Block Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
ROOFING BCGCA3007B. Types of Roofs Problem No1 Calculate Underside of Beams Birdsmouth 30mm Rafter 140 x 45.
The Two Piece Tangram The Two Piece Tangram. Use a ruler to measure half way along one edge. Join the mid-point to the opposite corner.
CIVIL DEPRTMENT  Introduction :  The process of laying out engineering projects by placing pegs Or marks at the site of works is known as setting out.
Construction Surveys. List of Figures Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out.
Mr. Vedprakash Maralapalle, Asst. Professor
Chapter 5: Locating and setting out
Surveying 1A (SVG 105) PLANE TABLE SURVEYING
UPPER FLOORS TIMBER AND CONCRETE.
Chain surveying Notes.
Profile Leveling.
Gable Roof BCGCA3007B.
Investigation of Road Project
EXERCISES: PROJECTIONS OF STRAIGHT LINES
Unit 5: Locating and setting out Dr
Chapter 5: Locating and setting out
TOWNSHIPS The owner of the property on which the township is to established applies to the Local planning Authority for a permit to establish the township.
THEODOLITE TRAVERSING BY S N Nanaware
Shape and One Point Perspective Project
BASIC DISTANCE MEASUREMENT
Geologic Geometry.
Strip Foundations The foundation runs under all the loadbearing walls.
Cubes Orthographic projections One and Two-point Perspective
Angles and Directions.
Angles and Directions.
LINEAR MEASUREMENT-PART 1
Tachometry.
What Do You See? Message of the Day: Use variable area plots to measure tree volume.
Angles and Directions.
Revise No. 1.
One Point Perspective: City Drawing A Tutorial
Cross Sections.
Identifying Different Types of Lines
Chapter 6 Construction Quantity Measurement
Engineering Surveying Linear Survey
Presentation transcript:

Rectangular Coordinates Level control in trenches SETTING OUT Buildings Base Lines Site Grid Rectangular Coordinates Level control in trenches

Baselines Baselines may be described as a straight line whose terminal are fixed in relation to some other detail. Baselines are found in a variety of forms. Building Line: A building line is defined as a line laid down by a local authority, usually a distance from a nearby road, over which no part of the building may encroach

Baselines Site centreline: Road centreline This type of baseline is encountered on industrial type complexes such as sewage works where the distances between various plants are defined in relation to each other. Road centreline A road centreline comprises a series of straight lines connected by horizontal curves. These straights can become the baselines for setting out buildings.

Baselines Coordinated Baseline: This type of baseline can be found on an increasing number of sites. It is defined from the Primary setting out network. Rectangular coordinates define the terminals and are set out from coordinated control points. The baseline must be checked for length both by calculation and site measurement. The WCB of the baseline can also be checked against its computed value.

Location of building from a Baseline Once baseline has been set out and checked the building can be located by the use of rectangular offsets: Locate pegs along baseline from where the offsets are to be measured. Distances measured as a series of RUNNING MEASUREMENTS and then individual peg distances checked. Difficult to do over long distances or sloping ground with a steel tape but use of Total Station makes this easier and possibly more accurate.

Location of building from a Baseline Theodolite should be used for the determination of right angles. Squareness to be checked for by comparing diagonals with calculated value.

Location of building from a Baseline An alternative approach is to set out the first line of the building and then this line checked. The remainder of the building is then set out from this tertiary baseline. This approach allows corrections to be made immediately, if found to be necessary. Check diagonal before proceeding with next corner Step 1 Step 2

Irregular shaped buildings Turn into rectangle if possible Accumulative errors are prevented because they fit in between fixed points

SITE GRID A site grid is a system of lines set out parallel and square to each other and a set distance apart. Grids can be set out several ways depending on the nature and complexity of the site: By Setting out from a coordinated baseline with offsets. By Intersection from the terminals of the base., but does require the use of two theodolites. By calculating the coordinates of all grid intersections and setting out from site Primary controls.

(a) (b)

SITE GRID In all the above methods the following checks should be made: Each grid side should be checked for length Each grid diagonals should be compared to calculated value. All pegs along a particular grid line should fall on the same line – check with a theodolite.

Location of Buildings from a Site Grid Each grid line now becomes a separate base line and the building corners can be set out by rectangular offsets as previously described. Once again the building corners must be checked for accuracy and squareness.

Rectangular Coordinates The location of building corners by rectangular corners has been dealt with in setting out using radials. Primary control points as reference stations should be used if possible Again the distances between corner pegs must be checked and corrected if necessary.

Control of Line and level Once the corner pegs have been located offset reference pegs or Profile boards need to be located as the corner pegs will be lost once excavation commences. Offset Pegs need to be put in at a standard offset (2m – 3m) and have been fully described in the section on drainage. Relocation of the corner pegs may be completed by stringlines between offset reference pegs. A plumb line dropped from the stringline intersection will locate the corner peg in an excavation.

Locating peg at bottom of excavation Alternately Theodolites or total stations could be used to relocate the bottom corner pegs. (Easier to locate far corner)

Profile Boards The use of Profile Boards for referencing a building is a far superior method to the use of offset pegs. Building Lines are produced on to the boards where they are marked either by a saw cut or a nail. Profile Boards should be as close to the ground as possible. Should all be set to the same level if possible and relative to FFL (Finished Floor Level) The boards must be set Parallel to the building lines and a reasonable distance from them to allow access for plant.

Profile Boards

Controlling Level of Trench Bottom The depth of foundation trench will be fixed by design. Sight rails or profile boards are used. A traveller length is determined bearing in mind the depth of trench and the height of the rails above ground level. Excavation is controlled in the usual way.

Control of Concrete Levels Control of level of traditional strip foundation is by steel level pins knocked in to concrete top level along th etrench bottom. Concrete is then poured to the top of the pins. With trench fill, level control is by pegs knocked into the side of the trench at concrete level.