Flag Installation on Roll-up Signs

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Hoop House Construction. Parts of the hoop house Frame Hoops Braces Plastic cover.
Structural Steel Construction
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Single-Balanced Mixer Assembly Instructions Revision 2 Updated 5/7/2012.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
BumperBot uses two contact switches to go through a labyrinth. Bumper.
Motor Leveling MECH 1200 Soft foot Condition: One or more of the mounting feet is not level with the others. Nuts loosen, vibration, misalignment Metal.
Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.
Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Problems with Traditional Style Helmets Through training, crews found a problem with our Traditional style helmets getting caught on wires by the Eagles.
Trim Fwd Spar End Brackets July 6, H2-2, Horizontal Stab Rear Spar 7H1-2, Stab Full Rib Corner of Forward.
Cooling Business Group 1 INSTALLATION Directions.
Full Ribs to Rear Spar Parts Layout July 6, H2-2, Horizontal Stab Rear Spar with upper and lower doublers.
Copyright Personal Concealment Solutions, Inc. Sight Picture Correct sight picture is on the left, the front sight is in sharp focus. On the right, you.
Maintenance of Traffic (MOT)
All ground where the feet of the N-Rack are to go must be levelled and concreted. This must be done in advance to allow the concrete to set. There are.
Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
Polaris 6x6 UTV Instructions for Fuel Tank Vent Tube Modification 2005 – 2009 models For further information contact: Michelle Ryerson or Carl Dorsey,
EML 2023 – Threads and Fasteners
Vbine Energy Generator Assembly Pictures and Info Slide Show.
How to build raised garden beds for small space gardening How to build a raised garden bed, which tools, material and skills needed. How much does it cost.
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
dsdfsa Zoomed in view… Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
Mounting best practices 1.Always mount to a solid, rigid surface when available 2.Whenever possible, it is recommended you mount the ShockLog directly.
General Instructions for “KidWind Light” wind tunnel.
On June, 14 th The adoption of the american Flag in 1776.
Flat plate sensor location Installation options For more information: Rod Hyatt, (508) ASKROD.com.
Moeller GmbH GB Leistungsschalter Protective note to rule DIN ISO is to be considered The new line of circuit breaker IZM ILS-P / W. Wagner July.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Group 8 Tony Andrade Steve Kappus Andrew Naumann Michael Pandolfo Derek Sottile.
Installing a VOR Antenna on Zenith’s “Flying Rudder” by Bill Bartlett Cutout hole using the antenna gasket as a template. Dill two holes to accommodate.
PINCH POT CREATURES By Wanda Powe Las Cruces, NM Educator.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Orthographic Drawing Mr. Mclellan Technology Education Westerly High School.
Build A Motor You must follow the directions step-by-step!
Courtesy Eric Witherspoon, Sonex plans #815 Photo 1: What it is. Photo 2: How it works. Sonex Wing Stand Answer to photos 3 and 4: Want leading.
Assembly of steering.
VIEW SERIES with Sliding Door
Today’s Plan Fasteners Threading Fasteners.
Turbo Installation Manipulator Final Design Review
Review and more practice
ME Contest Structure Plan View dia. orange circle
Installation Instructions
Drafting Tool Practice
SAFE WORK INSTRUCTIONS
Square Tube Shaft Connecting Both Gear Drives.
Assembly instructions for M-K all bolt together hoppercone kit.
Flag Installation on Roll-up Signs
How-to complete the Design Notebook
Creating 2-Point Perspective
EML 2023 – Threads and Fasteners
זכויות סוציאליות.
Drawing of stud.
Activity 4.2.8d Satellite Flight Path Construction Guide
VIEWS OF A FIGURE You can see an object differently depending on your position.
Chapter 6 Sign Components
Creating a grid by Carl Dellutri.
Wood and Metal fasteners
Copyright © 2012, Elsevier Inc. All rights Reserved.
XY Scanner Mount.
Valve stem “gag” mechanism
Slab building.
Four Jaw Collimator.
Where to Use Warning Lines
Omega Selection Center
Aluminium Profile System
Presentation transcript:

Flag Installation on Roll-up Signs

Flag System from Traffix Devices, Inc.

Front side of system connection.

This side wraps around the vertical rib.

Predrilled hole on the vertical rib Predrilled hole on the vertical rib. If the hole is not drilled, the 5/16-inch hole should be located 8 ¼ inches from top of rib.

Hole located with flag attached.

Nut and Bolt.

Flag system bolted to horizontal rib.

Flag system in set position.

Sign and flag system rolled up.

Rolled up sign and flag system overview.

Questions? Contact Dan Smith Traffic Management and Operations Engineer (573) 526-4329 Daniel.Smith@modot.mo.gov