RNG Rollout Becky Vanderhoff, Lars Avery, Carol Coon, Chris Mamorella,

Slides:



Advertisements
Similar presentations
RNG – RSS News Generator Team Evensteven Phil LightBecky Vanderhoff Carol CoonLars Avery Madura MahenthiranChris Mamorella.
Advertisements

DISC Database and Innovative Software in the Community (DISC) 1 October 9th, 2011 ARMS 1098B Design Review.
Cornell University Library Instruction Statistics Reporting System Members: Patrick Chen (pyc7) Soo-Yung Cho (sc444) Gregg Herlacher (gah24) Wilson Muyenzi.
Multiple Tiers in Action
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
System Implementation
10/26/00Splitting Access Databases...1 Preparing for Access 2000 Windows 2000/Office 2000 Roll-out.
Planning Iteration Demo Suunto Training Program Planner.
PHASE 4 SYSTEMS IMPLEMENTATION Application Development SYSTEMS ANALYSIS & DESIGN.
University of Minnesota Law Website – CALI 6/19/2004 – Gene Danilenko Redesign and Management of the Law School Website Conference For Law School Computing.
 Automates the process of Bill generation and bill payment  FRONT END:- ASP.NET  BACK END :- SQL SERVER.
City of Los Angeles Personnel Department Mobile Application Team 02:Shreya kamani Anushree Sridhar Pattra Thongprasert Abhishek Trigunayat Travis Jones.
Packet Item Creation. Council Packet System Developed about 10 years ago Intranet targeted to be replaced next year Custom developed in Cold Fusion 6.
RSS News Feed Generator Team Even Steven Phil Light, Carol Coon, Madura Mahenhthiran, Becky Vanderhoff, Chris Mamorella, Lars Avery.
Ganda ERP Project | ERP Project Status Report for CFC Oct 2014.
T Project Review Sotanorsu I3 Iteration
T Iteration Demo Software Trickery I2 Iteration
CU Student Organizer Trey McAlhany CPSC 482 Mobile Software Development Clemson University April 14, 2015.
T Project Review Magnificent Seven Final demonstration
T Project Review Wellit I1 Iteration
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
T Project Review Sotanorsu I2 Iteration
Data Virtualization Tutorial: Introduction to SQL Script
COMP 523 Diane pozefsky 24 August 2016.
DCR ARB Presentation Team 5: Tour Conductor.
CS615 Software Engineering Seminar I Final Project
DAYS OF THE WEEK.
Sprint 5 Schedule (15 – 2 days)
Sales Process March 2017.
Student October Collection
Agency Express: User Training
Time management School of Rock.
Sunday Monday Tuesday Wednesday Sunday Monday Tuesday Wednesday
Last Week of Quarter 3!.
Sutton Elementary HISD
Do Now: week #8 September
Describe the steps scientists use in an investigation.
SYSTEMS ANALYSIS & DESIGN
American History Unit: 1950s to Present Topic: Review
Monday Top half Evaluate the expression with p = 20. 2(9 – 4p) – 6 172
RNG Implementation Release 1.
The Johnson Times -Interpret data on bar and picture graphs.
7th Grade Math Warm-ups Week of November 7-11, 2016.
World History A December 2-6.
Week of 3/5 Monday 3/5: Learning Log Field Trip Reflection
Time 1.
Contact
Week of August 28-September 2, 2016
7th Grade Math Warm-ups Week of September 6-9, 2016.
7th Grade Math Warm-ups Week of September 19-23, 2016.
7th Grade Math Warm-ups Week of September 7-11, 2015.
Warm-ups Week of October 7-11, 2013.
Bell Ringer Week of February 10-14, Created by: Shavonne Burrows, EdS
Week of November 28 – December 2, 2016
7th Grade Math Warm-ups Week of December 5-9, 2016.
7th Grade Math Warm-ups Week of September 14-18, 2015.
7th Grade Math Warm-ups Week of September 12-16, 2016.
Week of November 18-22, 2013 Warm-ups.
7th Grade Math Warm-ups Week of October 3-7, 2016.
7th Grade Math Warm-ups Week of October 24-28, 2016.
7th Grade Math Warm-ups Week of October 5-9, 2015.
7th Grade Math Warm-ups Week of February 6-10, 2017.
Week of January 30 – February 3, 2017
2011年 5月 2011年 6月 2011年 7月 2011年 8月 Sunday Monday Tuesday Wednesday
Group Assignments Consult about Poster / Talk
WordPress Unit Web Coordinators
On and At Unit 2 Fun after school.
General Summative Assessment Data Monitoring & Cleanup Spring 2019
Our Process CMSC 345, Version 1/04.
Presentation transcript:

RNG Rollout Becky Vanderhoff, Lars Avery, Carol Coon, Chris Mamorella, Madura Mahenthiran, Phil Light

Agenda When we last met Current State of Project Results of alpha test Current State of Project Implementation Demo Documentation Rollout and Completion plans

At the Last Phase Gate Alpha test Then-Unresolved issues Scaled back because of time constraints Interviews with departments Obtain feedback on UI design and functionality Then-Unresolved issues Location of config file Quota Management Automatic Expiration

Current State of Implementation Functionality very near complete All use cases have been written Graceful failures Still missing: Some minor exceptions in the FileManager Quota enforcement Maturity on a few use cases Code cleanup, commenting Secure Authentication

Demo

Documentation Progress made on all fronts User’s Guide Administrator’s Guide FAQ Special user tutorials How to upload HTML documents to other sites How to utilize an RSS feed on department site

Rollout Have begun transition of database JDK 1.4 vs 1.3 Prepared creation scripts, made DB request Discussing fine points of table design with DBA JDK 1.4 vs 1.3 ITS systems running on 1.3 Development took place on 1.4 Evaluate differences Regular Expressions

Game Plan for Final Week Switch database by end of week Time to complete code Pre-delivery: Monday, 5/12 Final delivery: Thursday, 5/15 Final versions of documents Continue feedback/draft process Deliver Friday, 5/16 Training Sometime Tuesday-Thursday next week?

Other Responsibilities Poster Presentation Poster prepared by Monday, 5/12 at 10:00 Final Department Presentation Wednesday, 5/14 at 4:00