Flight Time Limitations for Business Aviation A Snapshot of EBAA Activity Andrea Němec Manager Safety and Rulemaking BBGA Annual Conference 12 March 2013.

Slides:



Advertisements
Similar presentations
Westin Dragonara Resort, Malta 4 March 2013 Implementation of the new Air Operations Regulations in Malta Capt Michael OBrien Head of Flight Operations.
Advertisements

Experiences on the road to Fatigue Risk Management Regulation
Cláudia Cabaço Flight Safety Assistant Manager FRMS Challenges of an On-demand Operator 1 st September 2011.
Office of Aviation Safety Emergency Medical Services (EMS) Aviation Operations Jeff Guzzetti Deputy Director for Regional Operations.
Rom for bransjestandard?
8 June 2006Portland, Oregon, USAE. Sivel EASA Working Group on regulation of non-complex motor aircraft engaged in non-commercial operations E Sivel (EASA)
Part 117 Flight and Duty Limitations and Rest Requirements: Flightcrew Members.
Flight and Duty Time Limitations and Rest Requirements Fatigue Risk Management Virgilijus Valentukevicius, EASA.
Authority Requirements Margit Markus Tallinn, 7 May 2009.
Presentation transcript:

Flight Time Limitations for Business Aviation A Snapshot of EBAA Activity Andrea Němec Manager Safety and Rulemaking BBGA Annual Conference 12 March 2013

Structure Past FTL activities Current FTL activities Main issues under consideration Future developments 12 March 2013© EBAA

Past FTL Activities © EBAA

Past Achievements Common position on FTL for Business Aviation Scientific study providing solid basis for the future development of sector rules Collection of operational experience of BusAv operators EASA acceptance of a future separate regulation on FTL for BusAv Operations

Current FTL Activities 12 March 2013© EBAA

Objectives of the EASA Rulemaking Tasks Development of FTL requirements for CAT operations of air taxi and single-pilot (aeroplane) and EMS (aeroplane + helicopter) by: Reviewing and assessing EU-OPS Subpart Q provisions and outcome of Common Response Document to the Notice of Proposed Amendment (NPA) ; Existing applicable FTL national provisions. Carrying out a Regulatory Impact Assessment Best option to achieve the objectives while minimising negative impacts. Submitting regulatory proposals For Implementing Rules, Certification Specifications, Acceptable Means of Compliance and Guidance Material

© EBAA Current activities on FTL: Air taxi and single-pilot

Main Issues Under Consideration (1/3) Positioning Important issue in Business Aviation Positioning duties before or immediately after a FDP Duty Hours Combination of flight duties with ground duties Use of Fatigue Risk Management Systems? Cumulative Duty Risk of fatigue deriving from high cumulative workload In BusAv fatigue less of an issue than for Airliners Night, early and late duties Consecutive Night Duties Increase minimum rest after consecutive night duties? Consecutive series of early starts and/or late arrivals Limit the number of consecutive early starts, additional rest after a series of early starts?

Calculation of FDP Clear maximum FDP limit Table or other means but must remain simple Must take into account the restorative sleep during WOCL period Extension of FDP due to split duty Split duty with rest should enable longer flight duty periods Extension of FDP due to in-flight rest Common practise but need to be managed Pilot-in command discretion For extension of FDP based on particular circumstances All affected crew members to agree with extension of FDP For reduction of FDP and/or increase of rest in case of fatigue risk Main Issues Under Consideration (2/3)

Standby Airport Standby Definition of facilities for Airport Standby Accommodation Standby other than airport Standby at home should not count as duty time for BusAv Basic Rest - Reduced rest arrangements Suitable accommodation Minimum duration of reduced rest Requirement for reduced rest to occur in the WOCL Compensation for effects of time zone differences (for long haul operations) Rest after flights with time zone differences should take into account the operational specifics of BusAv Main Issues Under Consideration (3/3)

EBAA Working Group Inputs Example

© EBAA Future Developments (1/2)

© EBAA Future Developments (2/2)

© EBAA FTL - Emergency Medical Services (EMS) by Aeroplanes and Helicopters

12 March 2013© EBAA FTL - Air Taxi and Single-Pilot Operations with Aeroplane

THANK YOU FOR YOUR ATTENTION