GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Instrument 1 Summary of Progress  Completed TVAC with no additional reboots  Ran refresh rate test showing that the refresh rate was not an.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
GLAST LAT Project4.1.7 Dec 15’03 V 1 FSW Organization Chart FSW Lead J. J. Russell Project Manager (IPM) L. Klaisner Electronics & FSW Manager G. Haller.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, DAQ & FSWV8 1 GLAST Large Area Telescope: Gunther Haller SLAC LAT Chief Electronics.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
BIOS. Accessing System BIOS You can use the System Setup utility to change variable BIOS information, such as the type of hard drive you have installed.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Primary Boot Code (PBC) D. Wood Naval Research Laboratory.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Design Verification of MSL Second Chance Pradip Maitra TASC 1 of 7 What is MSL Second Chance? Some Design Details Verifying.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Secondary Boot Code (SBC) D.Wood Naval Research Laboratory.
GLAST Large Area Telescope Instrument Flight Software Jeff Fisher, FSW Manager Flight Unit Peer Review Overview/Management/Schedule September 16, 2004.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
Test slide upload.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
Boot Code Readiness Review
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
Something wrong? Call Gregg or Jana
GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

EPU load – same as SIU load except… Procedure will be performed in building 33 Hardware involved: Mobile computing rack LAT Control Rack (a.k.a. VSC rack) Target CPU Additional EGSE (GASU, EM SIU) for burn verification Software All version information is contained in LAT-TD-07831-01 Burn PBC V4-10-1 from FSW B0-6-1 into BAE750 SUROM FSW B0-6-1 will be burned into ee1 (upper bank) of SIB LICOS, L00-02-02, used to upload FSW objects and monitor/control process All software objects made available on linux computers in the mobile rack. Includes: FSW distribution of uploadable objects from B0-6-1 LICOS L00-02-02 (new tag created specifically for EPUs) All necessary scripts January 11, 2005 Boot Code Readiness Review

Boot Code Readiness Review Process Hook up flight crate as SIU Upload FSW B0-6-1 application files into ee1 “SIU” application files Upload and burn new PBC image Upload and burn serial number image FOR THIS SPECIFIC CRATE (identified by Bay # and BAE S/N) Boot code is for EPU FSW build is still “SIU” Test PBC by rebooting crate Remove “SIU” application files; add “EPU” application files Hook up flight crate as EPU (see next slide) Test PBC burn by booting EPU and dumping memory from EPU January 11, 2005 Boot Code Readiness Review

Boot Code Readiness Review HW setup For burning of SUROM, use this test setup: Mobile rack For verifying burn, use this test setup: January 11, 2005 Boot Code Readiness Review

Boot Code Readiness Review References LATDoc Number Title LAT-TD-07831-01 Flight Crate Procedure for Burning EPU PBC into RAD750 SUROM LAT-TD-07830-01 Flight Crate Procedure for Burning SIU PBC into RAD750 SUROM LAT-DS-01862-54 GLAST Electronics Boxes, DAQ Electronics, SIU Box Assembly LAT-TD-07484-01 Procedure for Uploading Files to SIB EEPROMs over 1553 January 11, 2005 Boot Code Readiness Review