RF Gradient Data And Reporting Tools

Slides:



Advertisements
Similar presentations
A View of the Business with Drillable Graphics Southern Computer Measurement Group May, 2012 Martha Hays.
Advertisements

Chapter 9. Performance Management Enterprise wide endeavor Research and ascertain all performance problems – not just DBMS Five factors influence DB performance.
GEMINI Portal Charles Carpenter. GEMINI Portal Allows for a visual overview of slice.
OVERVIEW TEAM5 SOFTWARE The TEAM5 software manages personnel and test data for personal ESD grounding devices. Test and personnel data may be viewed/reported.
HP Quality Center Overview.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
May 17, Capabilities Description of a Rapid Prototyping Capability for Earth-Sun System Sciences RPC Project Team Mississippi State University.
Technical Workshops | Esri International User Conference San Diego, California Customizing ArcPad solutions Marika Vertzonis, Gareth Walters, Stephen Quan.
PSU CS 106 Computing Fundamentals II Product Life Cycle & SW Product Life Cycle HM 9/3/2007.
Maintaining and Updating Windows Server 2008
Data Warehousing: Defined and Its Applications Pete Johnson April 2002.
Database Systems – Data Warehousing
Reporting and Build Statistics Using Business Intelligence By Naga Sowjanya Karumuri Build Team, VMware, Cambridge Summer Internship 2008.
Case Study : Morcom Trading – P BSC 21
TVAC Electronic Call Sheet System Team HeatWave Summer 2007.
Informix IDS Administration with the New Server Studio 4.0 By Lester Knutsen My experience with the beta of Server Studio and the new Informix database.
Software Development Software Testing. Testing Definitions There are many tests going under various names. The following is a general list to get a feel.
PowerLogic® PowerView Software
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
Introduction – Addressing Business Challenges Microsoft® Business Intelligence Solutions.
37 Copyright © 2007, Oracle. All rights reserved. Module 37: Executing Workflow Processes Siebel 8.0 Essentials.
Software Configuration Management SEII-Lecture 21
T EST T OOLS U NIT VI This unit contains the overview of the test tools. Also prerequisites for applying these tools, tools selection and implementation.
Overview of CBRFC Flood Operations Arizona WFOs – May 19, 2011 Kevin Werner, SCH.
Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED ADMINISTRATION.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial HUAWEI.
Control System Tools for Beam Commissioning Timo Korhonen Controls Division Chief Engineer April 8, 2014.
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
AdisInsight User Guide July 2015
COMP 2710 Software Construction Project 2 – Analysis of auDiskTool
LCLS Commissioning & Operations High Level Software
GC0096 Electricity Storage Grid Code Requirements
Operations Machine Simulator.
Smarter Technology for Better Business
COMP 2710 Software Construction Project 2 – Analysis of auDiskTool
CQD Online Introduction
By: Samuel Oswald Hunter Supervisor: Mr Barry Irwin
Testing the System.
Lessons Learned: Implementing a Vulnerability Management Program
Introduction to Database Management Systems
CRM Anywhere.
Computer Aided Software Engineering (CASE)
AARP Foundation Tax-aide
Supplier Recovery Claim Automation
Michael Mast Senior Architect
Solution Summary Business Service Management Solution on AIX® 6.1.
Presentation of the eTendersNI service Business Intelligence Module
Concepts used for Analysis and Design
Inventory is used to illustrate:
9/22/2018.
LCLS Commissioning & Operations High Level Software
SESSION 10.1 Latest developments with TUFMAN
Reporting An In-Depth Guide.
Predicting Traffic Dmitriy Bespalov.
GHG Data Interface: transition to a new design
Requirements Very High level specification of what system should do
Why Background Processing?
SPDA-1-3-OBS Software Upgrade
JMP 11 added new features and improvements to CCB and MSA.
Megaputer Intelligence
Power BI Streaming Datasets with MS Flow
Comparison IWS/Graph and IWS/WebAdmin for IWSz
Measure Phase Wrap Up and Action Items
Text to Illustration (E2I)
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
KEY INITIATIVE Financial Data and Analytics
Financials in Microsoft Dynamics SL 2015.
SLC-Aware IOC Magnet Functional Requirements
Palestinian Central Bureau of Statistics
Presentation transcript:

RF Gradient Data And Reporting Tools Adam Carpenter StayTreat 2017

Outline Introduction Pre-existing Tools and Work Flows Data Sources New Tools RF Dashboard Demo Follow On Work Questions and Discussion

My Background Often a sys admin, sometimes a software developer and data analyst Working in support of the RF Gradient Team Developing an RF Gradient Dashboard Focusing on data generation, aggregation and presentation Extending current software capabilities to enable additional analysis Web-based dashboard application Presenting data to guide high-level decision making and inform maintenance work

RF Dashboard Focus Energy Reach! I.e., what energy can CEBAF run with acceptable trip rates? Defined as the Linac Energy with 10 RF trips/hour for North and South Linacs combined. Assumes two non-C25 TrueArc RF trips/hour Leaves room for eight C25 trips/hour (TrueArcs) An estimated quantity determined as the energy at which LEM predicts eight (C25 TrueArc) trips/hour How has CEBAF been performing energy reach-wise? More easily map changes in energy reach to changes in cavity set points Klystron Mod Anode Voltage Induced to prolong klystron tube life We know it’s impacting energy reach and trip rates, but how much? How many klystrons have mod anode voltage? How to prioritize replacements or swap limiting tubes to match otherwise limited cavities? Bypassed Cavities How many and which ones? What are the historical trends for all of this?

Previous Work Flow Understanding changes in energy reach Someone writes/runs a custom script to generate LEM data and charts at ad hoc time intervals Manually disperse results or post to logbook Someone else data mines logbook, etc. to piece together historical trends Work through RF Cavity History tool, CED, Archiver data, etc. Weeks later … rinse and repeat Estimating trip rate increases due to klystron mod anode voltage Not immediately obvious Not replacing existing tools, but combining aspects to direct further investigation and effort

Data Sources CED ‘history’ workspace Provides current and historical view of CED parameters About two years of history available and growing MYA Archiver Current and historical values for many EPICS PVs Maintains about two years of historical data online at a time LemScan and LEMSim Databases (new) Maintains data from running LEM daily at varying energy levels Started recording data in December 2016 (LemScan) and July 2017 (LEMSim) Key Points Mixtures of data that “ages out” with data that doesn’t Different data available at different times Show what we have for the times we have it

New Tools Web-based MYA query tools (beta) LEMHarvester and LemScan database Determines and saves current energy reach Runs lem at range of linac energies 1000 MeV to 1190 MeV at 5 MeV increments North and South linacs Saves trips rates of each linac at each energy to database Run via cron

(simulated control system) New Tools LEMSim Run batch-mode LEM in a simulated control system environment Loads EPICS environment in isolated Soft IOC Uses archiver to create historical representations Allows custom modifications Can provide a custom CED workspace Uses ced2Epics to sync workspace to simulated control system Archiver CED _lemSim Standard LEM output (trips per shift, GSETs, etc.) Soft IOC (simulated control system) LEM lem.cfg LEMSim

New Tools ModAnodeHarvester and associated database Uses LEMSim to estimate the impact of mod anode voltage on linac trip rates and cavity GSETs Specify date to use for EPICS control system, e.g. – last “runnable” CEBAF configuration Use copy of current CED workspace with and without ModAnode This will miss recent, unmerged “LiveEdit” updates Run through cron Only recently started data collection NOTE: The CED ModAnode update process is manual and somewhat spotty. Definite potential for improvement.

New Tools RF Dashboard Web-based dashboard for integrating high level RF metrics with drill downs to lower level details

https://accweb.acc.jlab.org/RFDashboard RF Dashboard Demo https://accweb.acc.jlab.org/RFDashboard

Follow On Work Short-term: Development on hold, receiving feedback and requests Mid-Term: Continued updates of RF Dashboard RF Trip and Recovery Viewer/Analyzer Tool Display RF trip interval and recovery times Incorporate statistical models Long-Term: Make the dashboard “proactive” Alert RF personnel to specific changes or trends Suggest possible avenues of improvement

Open Issues and Questions The dashboard is retrospective, but ideally this would provide real time feedback and alerts to possible changes LEMSim is only currently used for estimating impacts of mod anode voltage? Perhaps broader use cases? How to best use LEMSim Mod Anode Voltage results? What are possible improvements to the CED ModAnode value synchronization process?

Questions and Discussion

Backup Slides

New Tools Proto-typed RF Fault Recovery Viewer Alpha-phase product for visualizing RF trip frequency and recovery times